Rechercher des projets européens

18 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The proposed European Concerted Programme on Radiation Protection Research (acronym: CONCERT) aims to contribute to the sustainable integration of European and national research programmes in radiation protection. It will do so by focusing resources and efforts in five key directions:• Bring together the elements of the European scientific communities in the fields of radiation effects and risks, ...
Voir le projet

 36

 TERMINÉ 

Visegrad Initiative for Nuclear Cooperation (VINCO)

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

After a common expression of willingness to cooperate and legal establishment of V4G4 Centre of Excellence Association, VINCO project represents the next stage of capacity building in nuclear technologies in Central European countries. Participating countries defined already their specializations: helium technology in Czech Republic, design and safety analyses in Slovakia, fuel studies in Hungary ...
Voir le projet

 6

 TERMINÉ 

European Supply of SAfe NUclear Fuel (ESSANUF)

Date du début: 1 sept. 2015, Date de fin: 31 oct. 2017,

The overall aim of the project is to create greater security of energy supply and contribute to the security of supply of nuclear fuel for Russian designed pressurized water reactors (VVER) operating in the EU by diversification of fuel sources in the short / medium term and in full compliance with nuclear safety standards. By that, the project addresses the topic NFRP 16 – 2015. The scientific ob ...
Voir le projet

 10

 TERMINÉ 

Preparing ESNII for HORIZON 2020 (ESNII plus)

Date du début: 1 sept. 2013, Date de fin: 31 août 2017,

Preparing ESNII for HORIZON 2020The aim of this cross-cutting project is to develop a broad strategic approach to advanced fission systems in Europe in support of the European Sustainable Industrial Initiative (ESNII) within the SET-Plan. The project aims to prepare ESNII structuration and deployment strategy, to ensure efficient European coordinated research on Reactor Safety for the next generat ...
Voir le projet

 37

 TERMINÉ 

Code for European Severe Accident Management (CESAM)

Date du début: 1 avr. 2013, Date de fin: 31 mars 2017,

The Fukushima accidents highlighted that both the in-depth understanding of such sequences and the development or improvement of adequate severe accident management measures is essential in order to further increase the safety of the nuclear power plants operated in Europe. CESAM (Code for European Severe Accident Management) is a R&D project that aims in particular at the improvement of the Europ ...
Voir le projet

 21

 TERMINÉ 

Advanced Safety Assessment : Extended PSA (ASAMPSA_E)

Date du début: 1 juil. 2013, Date de fin: 31 déc. 2016,

The Fukushima nuclear accident in Japan resulted from the combination of two correlated extreme external events (earthquake and tsunami). The consequences (flooding in particular) went beyond what was considered in the initial NPP design. Such situations can be identified using PSA methodology that complements the deterministic approach for beyond design accidents. If the performance of a Level 1 ...
Voir le projet

 29

 TERMINÉ 
This proposal aims to close gaps that have been identified in nuclear and radiological preparedness following the first evaluation of the Fukushima disaster. It addresses the call Fission-2010-3.3.1: Update of emergency management and rehabilitation strategies and expertise in Europe. The consortium intends to review existing operational procedures in dealing with long lasting releases, address th ...
Voir le projet

 50

 TERMINÉ 
The strategic objective of NC2I-R is to structure the European public and private R&D capabilities for delivering a nuclear cogeneration demonstrator fully meeting the market needs, in support of the Nuclear Cogeneration European Industrial Initiative.Following the reference EUROPAIRS project and in close collaboration with the ongoing ARCHER project, national projects (e.g. Polish HTRPL, German S ...
Voir le projet

 22

 TERMINÉ 
The ALLIANCE project focuses on the preparatory phase for developing the ALLEGRO demonstrator. This is based on the Gas Fast Reactor (GFR) concept, one of the 2 alternative systems under the SET-Plan’s European Sustainable Nuclear Industrial Initiative (ESNII), expected to be built in Central Europe. ALLIANCE covers a number of preliminary studies on fuel management, R&D roadmap & infrastructures ...
Voir le projet

 9

 TERMINÉ 
"CATO proposes to develop a comprehensive Open Toolbox for dealing with CBRN crises due to terrorist attacks using non-conventional weapons or on facilities with CBRN material. CATO will:• combine CBRN knowledge, planning & response know-how, DSS building blocks and dedicated models and algorithms• enable the development of specific holistic CBRN-DSS• cover the entire CBRN disaster life cycle from ...
Voir le projet

 28

 TERMINÉ 
This project aims on the one hand to keep the momentum gained through the European Project EURANOS in establishing a platform where the operational and research community can meet and discuss with all the relevant stakeholders the topics related to emergency response and recovery preparedness and on the other hand to tackle urgent research topics in the area of nuclear emergency response and recov ...
Voir le projet

 22

 TERMINÉ 
"The European Sustainable Nuclear Industrial Initiative was launched in November 2010 to anticipate the development a fleet of fast reactors with closed cycle. Three fast neutron technologies have been selected:• the Sodium cooled Fast Reactor with the ASTRID prototype• the Lead cooled Fast Reactor with the ALFRED demonstrator which will be preceded by a pilotplan MYRRHA• the Gas cooled Fast Rea ...
Voir le projet

 22

 TERMINÉ 
"Research and technology development in the area of nuclear fission and radiation protection – under the Euratom programme – is booming. However, there is a clear need for better coordination of research activities at a European and global level – in order to further stimulate innovation and improve the EU’s competitiveness worldwide. Hence, a well-organised and proficient network of National Cont ...
Voir le projet

 7

 TERMINÉ 

Severe Accident Research Network of Excellence 2 (SARNET2)

Date du début: 1 avr. 2009, Date de fin: 31 mars 2013,

Most of the actors involved in severe accident research in Europe, plus Canada, Korea and the United States (41 partners), will network in SARNET2 (Severe Accident Research NETwork of Excellence - Phase 2) their capacities of research in order to resolve important pending issues on postulated severe accidents of existing and future Nuclear Power Plants (NPPs). The project has been defined in order ...
Voir le projet

 45

 TERMINÉ 

ADvanced Reactor Initiative And Network Arrangement (ADRIANA)

Date du début: 1 févr. 2010, Date de fin: 31 juil. 2011,

"The coordinating action ADRIANA (ADvanced Reactor Initiative And Network Arrangement) is proposed to setting up the network dedicated to the construction and operation of research infrastructures in support of developments for the European Industrial Initiative for sustainable nuclear fission. The project as the base for the current long-term taking place coordination activities of Euroatom under ...
Voir le projet

 15

 TERMINÉ 

MAN-MACHINE-ORGANISATION THROUGH INNOVATIVE ORIENTATIONS FOR NUCLEAR (MMOTION)

Date du début: 1 janv. 2009, Date de fin: 31 mars 2011,

MMOTION is a support action answering the call EURATOM-Fission-2007-2.1.4 targeting a better understanding of Man-Machine-Organization in the operation of nuclear installations. The objective of MMOTION is to analyse the current situation and the future trends concerning MMO and safety related aspects, and to propose an European research road map for the period 2010-2015 to comprehensively addres ...
Voir le projet

 11

 TERMINÉ 
Education for energy saving : The programme has developed training material in the field of sustainable energy for technicians and has drawn up professional profiles in the sector which will improve training standards. This project started in 2001 and lasted 36 months.
Voir le projet

 13

 TERMINÉ 
The project sets out to design, develop and pilot vocational training for nuclear power plant personnel to prepare them for the task of decommissioning plants. In particular, the project addresses the acute need to train nuclear power plant personnel in central and eastern European countries to be able to decommission both outdated and research reactors. To this end, project partners representing ...
Voir le projet

 7