Rechercher des projets européens

38 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The FUTURE-RADAR project will support the European Technology Platform ERTRAC (the European Road Transport Research Advisory Council) and the European Green Vehicle Initiative PPP to create and implement the needed research and innovation strategies for a sustainable and competitive European road transport system. Linking all relevant stakeholders FUTURE-RADAR will provide the consensus-based plan ...
Voir le projet

 23

 TERMINÉ 
...senting all requested competencies in the field of powertrain optimization for Heavy Duty vehicles. The consortium comprises OEMs with IVECO-ALTRA, CRF and VOLVO (also members of EUCAR, suppliers VALEO, BOSCH, JOHNSON MATTHEY and JSR MICRO (CLEPA), leading Engineering and Technology Companies/organizations and Universities with TNO, FRAUNHOFER, and VUB (EARPA). The majority are also active members ...
Voir le projet

 11

 TERMINÉ 
ADAS&ME (“Adaptive ADAS to support incapacitated drivers &Mitigate Effectively risks through tailor made HMI under automation”) will develop adapted Advanced Driver Assistance Systems, that incorporate driver/rider state, situational/environmental context, and adaptive interaction to automatically transfer control between vehicle and driver/rider and thus ensure safer and more efficient road usage ...
Voir le projet

 30

 TERMINÉ 

AUTOmated driving Progressed by Internet Of Things (AUTOPILOT)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

"Automated driving is expected to increase safety, provide more comfort and create many new business opportunities for mobility services. The market size is expected to grow gradually reaching 50% of the market in 2035. The IoT is about enabling connections between objects or "things"; it’s about connecting anything, anytime, anyplace, using any service over any network. There is little doubt that ...
Voir le projet

 43

 TERMINÉ 
Thermoelectric materials have been studied for several decades now. Improved TE materials are emerging with the so-called second-generation thermoelectric (GEN2 TE) materials: silicides and half-Heusler. These materials are low-cost, based on most earth-abundant elements and eco-friendly materials, and can impact positively European industry and society by converting wasted heat into electricity. ...
Voir le projet

 14

 TERMINÉ 

High efficient Particulate free Gasoline Engines (UPGRADE)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

The UPGRADE project aims to support the transition to a high efficient, cleaner and affordable powertrain technology systems, based on Spark Ignited GDI (Gasoline Direct Injection) approach, suitable for future Light Duty applications. The project also includes a deep analysis of the phenomenon of the formation of the nanoparticles in relationship to the engine design and its operating conditions ...
Voir le projet

 12

 TERMINÉ 
Hybrid and Full Electric Vehicles ((H)EVs) are essential for the transition towards sustainable e-mobility. The permanent magnets in motors/generators of (H)EVs are either NdFeB or SmCo magnets, which contain large quantities of rare earths, which are critical metals with the highest supply risk for Europe. As highlighted by the European Rare Earths Competency Network, recycling of rare-earth magn ...
Voir le projet

 7

 TERMINÉ 

Vision Inspired Driver Assistance Systems (VI-DAS)

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

Road accidents continue to be a major public safety concern. Human error is the main cause of accidents. Intelligent driver systems that can monitor the driver’s state and behaviour show promise for our collective safety. VI-DAS will progress the design of next-gen 720° connected ADAS (scene analysis, driver status). Advances in sensors, data fusion, machine learning and user feedback provide the ...
Voir le projet

 16

 TERMINÉ 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Voir le projet

 76

 TERMINÉ 

Cloud Large Scale Video Analysis (Cloud-LSVA)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

Cloud-LSVA will create Big Data Technologies to address the open problem of a lack of software tools, and hardware platforms, to annotate petabyte scale video datasets. The problem is of particular importance to the automotive industry. CMOS Image Sensors for Vehicles are the primary area of innovation for camera manufactures at present. They are the sensor that offers the most functionality for t ...
Voir le projet

 12

 TERMINÉ 
Cloud environments are notorious for their lack of stability in performance characteristics, a feature that makes it extremely difficult for owners of time-critical applications to make the decisive step for migration and owners of SaaS to be unable to present performance vs cost tradeoffs to their customers when acting as IaaS customers. CLOUDPERFECT aims at delivering a set of tools and processe ...
Voir le projet

 8

 TERMINÉ 

Coordination of Automated Road Transport Deployment for Europe (CARTRE)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2018,

Automated Road Transport (ART) is seen as one of the key technologies and major technological advancements influencing and shaping our future mobility and quality of life. The ART technology encompasses passenger cars, public transport vehicles, and urban and interurban freight transport and also extends to the road, IT and telecommunication infrastructure needed to guarantee safe and efficient op ...
Voir le projet

 36

 TERMINÉ 
The 3Ccar project will provide highly integrated ECS Components for Complexity Control in thereby affordable electrified cars. The new semiconductors for Complexity management (Control, reduction) will offer the next level of energy efficiency in transportation systems.3Ccar’s impact is maximizing pragmatic strategy: Use semiconductor technology innovations to manage functionality & complexity inc ...
Voir le projet

 47

 TERMINÉ 

Optimised and Systematic Energy Management in Electric Vehicles (OSEM-EV)

Date du début: 1 juin 2015, Date de fin: 31 mai 2018,

Innovation in the automotive industry is of pivotal importance for European´s prosperity. OSEM-EV will provide solutions for better autonomy and predictable range to address today´s car buyers concern about electro mobility. Just increasing the battery capacity is not a viable option because the expectation is to have a familiar level of comfort and safe, eco and human oriented mobility at afforda ...
Voir le projet

 13

 TERMINÉ 

Dependable Embedded Wireless Infrastructure (DEWI)

Date du début: 1 mars 2014, Date de fin: 28 févr. 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Voir le projet

 61

 TERMINÉ 

Future of Surface Road Transport European Resarch (FOSTER-ROAD)

Date du début: 1 mars 2013, Date de fin: 31 déc. 2016,

"The FOSTER-ROAD project will support the European Technology Platform ERTRAC (the European Road Transport Research Advisory Council) to create and implement the needed research and innovation strategies for a sustainable and competitive European road transport system. Linking all relevant stakeholders FOSTER-ROAD will provide the consensus-based plans and roadmaps addressing the key societal, env ...
Voir le projet

 17

 TERMINÉ 
...lability will be proven by flipchip packaging of 14nm CMOS samples on the interposer. New modules for TSVs, MRAM and Passives embedded in TSV technology will be developed to enable 200C applications. Valeo will provide system specifications, development and demo car evaluation. The other partners contribute to the TSV, WLP and IPD technology (FhG, CEA-Leti) and develop the required novel design, s ...
Voir le projet

 11

 TERMINÉ 

New permanent magnets for electric-vehicle drive applications (MAG-DRIVE)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

...educing conventional rare-earth magnets’ need for easily oxidising grain boundaries. The project will integrate these magnets into motors that have increased efficiency, with a system developed by VALEO for integration into their next generation of pure EV motor. The MAG-DRIVE project includes leading research groups from Slovenia, Serbia and the UK, together with SMEs from Slovenia and Germany an ...
Voir le projet

 7

 TERMINÉ 
Modern societies are eagerly looking for the integration of mobility and their urban living area to enable reliable and safe transportation, better efficiency and cost, comfort and low emissions for the environment. The trends are obvious, however, providing a hybrid/electrical car is only one part of the full picture. The "standard" customer is still very reluctant to buy a full electrical vehicl ...
Voir le projet

 17

 TERMINÉ 

Achieving Success in Education Employment & Training

Date du début: 22 mai 2015, Date de fin: 21 août 2016,

Context / Background: Youth exchange for young people not in education employment or training (NEET)aged 16-24 from France, Germany and Wales, selected through existing partners in each country. The Welsh Exchange enabled young people to learn and experience local offers to NEET young people, developed their skills, confidence and self esteem through activties. Young participants were able to make ...
Voir le projet

 3

 TERMINÉ 

Critical System Engineering Acceleration (CRYSTAL)

Date du début: 1 mai 2013, Date de fin: 31 juil. 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr ...
Voir le projet

 70

 TERMINÉ 
...le automatic joining prototypes for dissimilar plastic-metal materials with short cycle times and a broad field of applications.The consortium counts with three large companies like FAURECIA, PSA and VALEO as end users mainly dedicated to automotive sector, LASEA as SME laser source integrator and ANDALTEC as high-tech SME supporting innovation in the plastic field. The consortium is complemented ...
Voir le projet

 8

 TERMINÉ 

Replacement and Original Magnet Engineering Options (ROMEO)

Date du début: 1 déc. 2012, Date de fin: 30 nov. 2015,

Permanent magnets are vital components in an enormous number of domestic and industrial devices, and they are particularly crucial within the rapidly-developing renewable energy sector, where the motors for electric vehicles and the generators in wind turbines require strong magnets with the ability to operate at temperatures well over 100°C. Currently, these magnets are based on the rare earth el ...
Voir le projet

 14

 TERMINÉ 

Be mobile, be smart, enjoy adventure

Date du début: 1 janv. 2015, Date de fin: 30 sept. 2015,

This seminar is the first part of a trinational cycle for young people with social, economical and educational difficulties. It will take place in Brittany (France) from 1-7. February 2015. 30 participants (10 from lower Saxony, Germany ; 10 from Wales, Great-Britain ; and 10 from Brittany, France. Youth workers, intercultural teamers and translators will lead the group during the whole week. ...
Voir le projet

 6

 TERMINÉ 
Smart Power ICs are extensively used in automotive embedded systems due to their unique capabilities to merge low power and high voltage devices on the same chip, at competitive cost. In such devices, induced electrical coupling noise due to switching of the power stages, when integrating such high voltage (HV) devices with low voltage (LV) functions, is a big issue. During switching, parasitic vo ...
Voir le projet

 10

 TERMINÉ 
Background of Project: To host training for professionals and experts from Germany and France in Wales, in youth and social work, as well as students volunteers and any other person who is interested in youth work. To develop concepts of European mobility and job opportunities for youths from disadvantaged backgrounds. . This will take place in June 22-26 2015 in Vale of Glamorgan. Accommodation w ...
Voir le projet

 4

 TERMINÉ 

Be mobile. Be smart. Enjoy adventure.

Date du début: 1 févr. 2015, Date de fin: 30 juin 2015,

We organised a five-day youoth exchange between young adults from the Landkreis Wesermarsch (Lower Saxony, Germany), the département Finistère (Brittany, France), and the Vale of Glamorgan (Wales, UK). On the whole, 26 young people, aged 16 to 23, participated in the youth exchange - accompanied by social pedagogues. The young people are socially disadvantaged youths who are not in employment, edu ...
Voir le projet

 4

 TERMINÉ 
"The Coordination Action CAPIRE will prepare and support the realization of a Public Private Partnership (PPP) sustaining and putting into practice the European Green Cars Initiative. Its activities will be focussed on two major fields: a careful consideration of options for the aims, shape, and implementation paths a PPP, and the identification of technology roadblocks and the respective research ...
Voir le projet

 15

 TERMINÉ 
The STREP project "Smart Battery Control System based on a Charge-equalization Circuit for an advanced Dual-Cell Battery for Electric Vehicles" (SuperLIB) addresses the objectives of the call "ICT for fully electric vehicles", targeting the energy storage system. SuperLIB focuses on smart control system solutions for batteries. To enhance the overall performance, the battery consists of high-power ...
Voir le projet

 10

 TERMINÉ 
... smart energy storage for FEVs.This is accomplished by proposing a modular approach with ultracapacitor power packs with higher density with 50% energy advantage developed by Corning and evaluated by Valeo and Austrian Battery Research Lab. This will be enabled by BMS ICs based on a new concept in the HV-technology from austriamicrosystems enhancing also the modularity of Li-Ion batteries as energ ...
Voir le projet

 9

 TERMINÉ 

Efficient Cooling Systems for QUieter Surface Transport (ECOQUEST)

Date du début: 1 déc. 2009, Date de fin: 31 mai 2013,

"An important subsystem in surface transportation vehicles (rail bound, automotive and heavy duty) is the cooling unit. Present European standards for interoperability of rail bound traffic require low noise levels while manufactures need to meet the vehicle performance and energy efficiency requested by the operators. The stringent EU6 emission limits expected to come into effect will increase dr ...
Voir le projet

 10

 TERMINÉ 

Instant Mobility for Passengers and Goods (Instant Mobility)

Date du début: 1 avr. 2011, Date de fin: 31 mars 2013,

The Instant Mobility project has created a concept for a virtual "Transport and Mobility Internet", a platform for information and services able to support radically new types of connected applications for scenarios centred on the stakeholder groups:•\tmultimodal travellers•\tdrivers & passengers•\tpassenger transport operators•\tgoods vehicle operators•\troad operators & traffic managers.The proj ...
Voir le projet

 24

 TERMINÉ 
The main objective of the project is to reduce the energy consumption and curb CO2 emissions of vehicles by massively harvesting electrical energy from the heat within the exhaust system and re-use this energy to supply electrical components within the vehicle or to feed the powertrain of hy-brid electrical vehicles (HEV). The recovery of the thermal energy will be performed by novel, labo-ratory- ...
Voir le projet

 7

 TERMINÉ 

MOre Safety for All by Radar Interference Mitigation (MOSARIM)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2012,

Since several years millimeter-wave radar systems are used for vehicular applications, predominantly in comfort functions and a few in safety functions. Different frequencies and modulation schemes, emission powers and radiation patterns are used and up to now almost no care or precaution is undertaken to reduce or avoid mutual interference. Within a few years the penetration rate of vehicular rad ...
Voir le projet

 12

 TERMINÉ 
"SAFIER will build the strategies for implementing a step-change in the road transport sector - and more widely within the transport and energy sectors – by providing the objective, consensus-based plans for the European Technology Platform ERTRAC (European Road Transport Research Advisory Council), Since 2002 ERTRAC has been an open forum for all relevant stakeholders in the road transport resear ...
Voir le projet

 12

 TERMINÉ 

E3Car -> Nanoelectronics for an energy efficient electrical car (E3CAR)

Date du début: 1 févr. 2009, Date de fin: 1 janv. 2012,

The objective of the project is the development of nanoelectronics technologies, devices, circuits architectures and modules for electrical cars/vehicles and demonstration of these modules in a final systems.Emissions from road vehicles have to be reduced substantially in the future. The ultimate goal of most car manufacturers is to get to a completely electric vehicle, protecting the environment ...
Voir le projet

 32

 TERMINÉ 

Automotive Tested High-voltage Embedded Non-volatile memory Integrated SoC (ATHENIS)

Date du début: 1 janv. 2008, Date de fin: 31 déc. 2010,

... alternator-like demonstrator with and without eNVM is selected for a worst case proof of concept. eNVM will enable "flexibility" to software-configure alternator systems for multiple car platforms. Valeo Electrical Systems will provide system specifications, system development and system evaluation. The other research partners contribute the required novel characterization, reliability, test, and ...
Voir le projet

 8

 TERMINÉ 
The project EUROPOLYTEC: - The European competencies framework on trades of mechatronics is available on the website of the Europolytec association as a document http://www.asso-europolytec.eu/. This competencies framework is also available in the mechatronics section of the site. It has allowed describing the courses and jobs following a single framework.- The multilingual website combines inform ...
Voir le projet

 14