Rechercher des projets européens

35 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

VIOLIN NET MAKING

Date du début: 1 sept. 2016, Date de fin: 31 mars 2018,

This project has been promoted by the Department of Violin making of the Music Conservatory Juan Crisostomo Arriaga of Bilbao, the only shool in Spain which teaches Luthierie (Building and Restoration of bowed string instruments -violin, viola and violoncelo-, Professional Qualifications level III ). The Department of Education of the Basque Government has promoted the renewal and adaptation of th ...
Voir le projet

 9

 TERMINÉ 

MARINE environmental in situ Assessment and monitoring tool BOX (MARIABOX)

Date du début: 1 févr. 2014, Date de fin: 31 janv. 2018,

"MariaBox will develop a wireless marine environment analysis device for monitoring chemical and biological pollutants while installed into a buoy, a maritime means of transport or a mooring. The device, based on novel biosensors, will be of high-sensitivity, portable and capable of repeating measurements over a long time, allowing permanent deployment at sea. The word “MARIA” is the plural of the ...
Voir le projet

 13

 TERMINÉ 

European Medical Information Framework (EMIF)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2017,

In response to the need to tackle increasingly complex medical research questions, a growing amount of human health data is being collected, either in routine Electronic Healthcare Record (EHR) databases, through research-driven cohort studies, in biobanks or related efforts. However, data sources are typically fragmented and contain information gaps which prevent their full exploitation. EMIF aim ...
Voir le projet

 64

 TERMINÉ 
Rapidly developing markets such as green construction, energy harvesting and storage, advanced materials for aerospace, electronics, medical implants and environmental remediation are potential key application targets for nanomaterials. There, nanotechnology has the potential to make qualitative improvements or indeed even to enable the technology. Impacts range from increased efficiency of energy ...
Voir le projet

 26

 TERMINÉ 

WATER AND ENERGY ADVANCED MANAGEMENT FOR IRRIGATION (WEAM4I)

Date du début: 1 nov. 2013, Date de fin: 30 avr. 2017,

Agriculture sector is accountable for 30% of the total water consumption in Europe, but reaches up to 70% of total water consumption in several European southern countries. In recent years, most of the efforts have been focused on water efficiency, without taking care of energy aspects, resulting in some cases on a significant increase in energy consumption, both per irrigated surface and per volu ...
Voir le projet

 19

 TERMINÉ 

Practice-based Experiential Learning Analytics Research And Support (PELARS)

Date du début: 1 févr. 2014, Date de fin: 31 janv. 2017,

The PELARS project generates, analyzes, uses and provides feedback for analytics derived from hands-on, project-based and experiential learning scenarios. The project produces and evaluates technology designs for analytic data generation for constructivist learning scenarios in Science, Technology, Engineering and Math (STEM) topics, including: technology solutions, infrastructure, activities, ass ...
Voir le projet

 12

 TERMINÉ 
The capacity of zoonotic RNA viruses to emerge as major agents of human disease can appear limitless. Current intervention strategies have demonstrated limited success. Rapid, innovative and effective solutions are needed to reduce the apparently accelerating process of zoonotic disease emergence. We will study the following zoonotic viruses with epidemic potential in Europe: influenza virus, hepa ...
Voir le projet

 20

 TERMINÉ 

European Medicines Research Training Network (EMTRAIN)

Date du début: 1 oct. 2009, Date de fin: 30 sept. 2016,

EMTRAIN is an essential element for the success of the IMI Education & Training (E&T) Call Topics in Europe (current and future). It will establish a pan-European platform of excellence for education and training covering the whole life-cycle of medicines from basic research through clinical development to pharmaco-vigilance. It will underpin the successful delivery of the current and future IMI-f ...
Voir le projet

 32

 TERMINÉ 
PROFICIENT aims to create large business opportunities for SMEs in the construction sector by exploiting the newly emerging process of Collective Self-Organised (CSO) housing for constructing and retrofitting energy-efficient residential districts.PROFICIENT responds to the EU-wide trend of self-organised housing process in order to boost the quality and the scale of energy-efficient buildings. Se ...
Voir le projet

 17

 TERMINÉ 
The mid-infrared (MIR) region is emerging as the favourite wavelength band for a number of applications, including high sensitivity trace detection, chemical emission monitoring, process control, and biological sensing applications. An efficient way to get precise and reliable information is to rely on spectroscopic analysis and, among the existing technologies, Tunable Diode Laser Spectroscopy (T ...
Voir le projet

 18

 TERMINÉ 
"The principal strategic objective of INTERCROSSING is the cultivation of a new type of young researcher to deal with challenges of exploiting the latest Next Generation Sequencing (NGS) technologies – individuals with rigorous training in three disciplines hardly ever found together any one young scientist: population genetics, informatics and statistics. The need for this supra-disciplinary com ...
Voir le projet

 10

 TERMINÉ 
The All-Electric Aircraft is a major target for the next generation of aircraft to lower consumption of non-propulsive power and thus fuel burn. To eliminate hydraulic circuits, pumps and reservoirs, Electro Mechanical Actuators (EMA) are mandatory but now need to meet cost, reliability and weight requirements from the airframers.ACTUATION2015 aims to develop and validate a common set of standard ...
Voir le projet

 56

 TERMINÉ 

Combined development of compact thermal energy storage technologies (COMTES)

Date du début: 1 avr. 2012, Date de fin: 31 mars 2016,

The COMTES project has as goal to develop and demonstrate three novel systems for compact seasonal storage of solar thermal energy. These systems will contribute to the EU 20-20-20 targets by covering a larger share of the domestic energy demand with solar thermal energy.Main objective of COMTES is to develop and demonstrate systems for seasonal storage that are significantly better than water bas ...
Voir le projet

 11

 TERMINÉ 
"ADAPTAWHEAT will show how flowering time variation can be exploited for the genetic improvement of the European wheat crop to optimise adaptation and performance in the light of predicted climate change. It will test current hypotheses that postulate specific changes in ear emergence and the timing and duration of developmental phases, which are thought of as components of ear emergence, will i ...
Voir le projet

 21

 TERMINÉ 
READY4SmartCities operates in a European context where other initiatives are currently running in order to create a common approach on Smart Cities, Such initiatives, even if of fundamental importance for the EU, have some relevant gaps not allowing them to fully cover fundamental aspects for Smart Cities, i.e. to define a common data framework allowing full interoperability among different city s ...
Voir le projet

 11

 TERMINÉ 

Unbiased Biomarkers for the Prediction of Respiratory Disease Outcomes (U-BIOPRED)

Date du début: 1 oct. 2009, Date de fin: 30 sept. 2015,

RationaleThe inability of pre-clinical studies to predict clinical efficacy is a major bottleneck in drug development. In severe asthma this bottleneck results from: a lack of useful and validated biomarkers, underperforming pre-clinical models, inadequate and incomplete sub-phenotyping, and insufficient disease understanding.HypothesisThe use of biomarker profiles comprised of various types of hi ...
Voir le projet

 42

 TERMINÉ 
Worm infections are receiving increased attention due to: the wide geographic overlap in occurrence between worms and HIV, TB and malaria; the large proportion of individuals (minimal estimates around 25%) co-infected with worms and HIV/TB/ malaria; the potential risk of increasing disease burden; the very limited understanding of the impact by worm infections on HIV-, TB- and malaria-specific imm ...
Voir le projet

 23

 TERMINÉ 

Harvesting solar energy with multifunctional glass-polymer windows (HARWIN)

Date du début: 1 sept. 2012, Date de fin: 31 août 2015,

In HarWin new materials will be developed with the aim of constructing next generation windows. These windows will improve significantly energy efficiency of windows and the buildings. They will enable extension of window functionality beyond the current European State of Art. The improvements are based on reduced weight, reduced thermal conductivity and energy consumption, reduced material usage ...
Voir le projet

 12

 TERMINÉ 

Semantic Interoperability for Health Network (SemanticHealthNet)

Date du début: 1 déc. 2011, Date de fin: 31 mai 2015,

SemanticHealthNet will develop a scalable and sustainable pan-European organisational and governance process for the semantic interoperability of clinical and biomedical knowledge, to help ensure that EHR systems are optimised for patient care, public health and clinical research across healthcare systems and institutions.Through a clinically-driven workplan, exemplified in cardiovascular medicine ...
Voir le projet

 18

 TERMINÉ 
Scientific research is no longer conducted within national boundaries and is becoming increasing dependent on the large-scale analysis of data, generated from instruments or computer simulations housed in trans-national facilities, by using e Infrastructure (distributed computing and storage resources linked by high-performance networks).The 48 month EGI-InSPIRE project will continue the transitio ...
Voir le projet

 143

 TERMINÉ 

European Technology for Digital Audiovisual Media Preservation (PRESTO4U)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2014,

Description Presto4U aims to identify useful results of research into digital audiovisual preservation and to raise awareness and improve the adoption  Presto4U is a two-year project supported by a core group of 14 PrestoCentre member organsations. The aim of the project is to identify useful resu ...
Voir le projet

 15

 TERMINÉ 
PIME’s is a CONCERTO joint proposal from Salburua community in Vitoria (ES), Dale community in Sandnes (NO) and Szentendre community in Szentendre (HU). The three communities will work together on RTD, demonstration and dissemination in order to maximise the effect of the measures implanted and the impact of the individual projects. The project has 14 partners from 4 countries. The proposal unites ...
Voir le projet

 14

 TERMINÉ 

Game and Learning Alliance (GaLA)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2014,

The GaLA motivation stems from the acknowledgment of the potentiality of Serious Games (SGs) for education and training and the need to address the challenges of the main stakeholders of the SGs European landscape (users, researchers, developers/industry, educators). A foundational fault issue in this context is the fragmentation that affects the SG landscape.GALA aims to shape the scientific comm ...
Voir le projet

 34

 TERMINÉ 

Pharmaceutical Medicine Training Programme (PHARMATRAIN)

Date du début: 1 mai 2009, Date de fin: 30 avr. 2014,

"The proposed Pharmaceutical Medicine Training Programme provides a comprehensive solution for the complex needs of integrated drug development for all professionals involved, incl. physicians, pharmaceutical scientists,biologists, biometricians, health economists, and safety and regulatory scientists from universities, regulatory agencies, large, middle-sized and small pharmaceutical enterprises, ...
Voir le projet

 52

 TERMINÉ 
The development and implementation of bio-refinery processes is an absolute necessity and the key to meet the vision towards bio-based economy. The EuroBioRef concept is an integrated, sustainable and diversified bio-refinery involving all biomass value chain stakeholders. The latter will allow large-scale research, testing, optimisation and demonstration of processes in the production of a wide r ...
Voir le projet

 34

 TERMINÉ 

European Clearing House for Open Robotics Development (ECHORD)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2013,

Description Strengthening the knowledge transfer between scientific research and industry in robotics and stimulating their cooperation In Europe the robotics industry is strong, but still fragmented and dispersed. The objective of ECHORD is to provide new opportunities for coordinated and target- ...
Voir le projet

 105

 TERMINÉ 
Europe must use water more efficiently to avoid the anticipated impacts of water shortage driven by a range of dynamics incl. climate change. Nanotechnologies, materials and process innovations (NMP) are key enabling technologies for efficient industrial water management. The chemical industry has a unique role as major water user AND a key solution provider for the development of future water tec ...
Voir le projet

 11

 TERMINÉ 

Beyond CMOS Nanodevices for Adding Functionalities\nto CMOS (NANOFUNCTION)

Date du début: 1 sept. 2010, Date de fin: 31 août 2013,

Description NANOFUNCTION addresses the merging of advanced More than Moore (MtM) devices with Beyond-CMOS. Topics: Si nanowires for sensing, on-chip energy harvesting, nano-cooling and porous Si for RF passives.The NANOFUNCTION project aims to integrate at the European level the excellent European research laboratories in order to strengt ...
Voir le projet

 21

 TERMINÉ 

Breakthrough in European Ship and Shipbuilding Technologies (BESST)

Date du début: 1 sept. 2009, Date de fin: 28 févr. 2013,

"Initiated by EUROYARDS, BESST aims to achieve a breakthrough in competitiveness, environmentally friendliness and safety of EU built ships. Focusing on passenger ships, ferries and mega-yachts, the results will to a large extend be applicable also to other ships. A holistic life cycle performance assessment on ship level will guide the technical developments on system level, clustered in System G ...
Voir le projet

 70

 TERMINÉ 

Osteoporotic Virtual Physiological Human (VPHOP)

Date du début: 1 sept. 2008, Date de fin: 31 oct. 2012,

Nearly four million osteoporotic bone fractures cost the European health system more than 30 billion Euro per year. This figure could double by 2050. After the first fracture, the chances of having another one increase by 86%. We need to prevent osteoporotic fractures. The first step is an accurate prediction of the patient-specific risk of fracture that considers not only the skeletal determin ...
Voir le projet

 21

 TERMINÉ 

Guardian Angels for a Smarter Life (Guardian Angels)

Date du début: 1 mai 2011, Date de fin: 30 avr. 2012,

Guardian Angels (GA) are future zero-power, intelligent, autonomous systems-of-systems featuring sensing, computation, and communication beyond human aptitudes. GA will assist humans from their infancy to old age in complex life situations and environments. Zero-power reflects system-of-systems ability to scavenge energy in dynamic environments by disruptive harvesting techniques. The project prep ...
Voir le projet

 34

 TERMINÉ 
Embedded systems are specialised computers used in larger systems or machines to control equipments such as automobiles, home appliances, communication, control and office machines. Such pervasivity is particularly evident in immersive realities, i.e., scenarios in which invisible embedded systems need to continuosly interact with human users, in order to provide continuous sensed information and ...
Voir le projet

 12

 TERMINÉ 

Integrated Risk Management for Africa (IRMA)

Date du début: 1 juin 2008, Date de fin: 31 déc. 2009,

Disaster risk reduction policies and institutional mechanism exist at various degrees of completeness in the African countries part of the consortium. Their effectiveness is however limited when having to deal with major disasters and complex emergencies. Risk management is often limited to specific hazard monitoring with limited or no consideration of the vulnerability of the area at risk neither ...
Voir le projet

 17

 TERMINÉ 

Bridging the gap between science and stakeholders: Phase I – Common Ground (GAP1)

Date du début: 1 avr. 2008, Date de fin: 30 sept. 2009,

Together, the stakeholder and scientist participants in GAP1 will initiate cooperative research by making plans to combine knowledge in future participatory research. They will engage through a series of European and regional workshops. GAP1 represents phase 1 of a three-phase programme that aims to explore the complementary nature of alternative knowledge and investigate how to combine it in wa ...
Voir le projet

 30

 TERMINÉ 
Reason: A New Focal Point for Teaching EU StudiesAs of December 2009, the Lisbon Treaty has become the EU's new fundamental framework for the foreseeable future. The analysis of altered or novel treaty provisions becomes a high priority for interdisciplinary research-based teaching curricula in EU studies. Only a European academic network will be able to exploit input from the relevant disciplines ...
Voir le projet

 67