Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

MIREL - MIning and REasoning with Legal texts (MIREL)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

The management of large repositories of norms, and the semantic access and reasoning to these norms are key challenges in Legal Informatics. The MIREL project will create an international and inter-sectorial network to define a formal framework and to develop tools for MIning and REasoning with Legal texts, with the aim of translating these legal texts into formal representations that can be used ...
Voir le projet

 9

 TERMINÉ 

European Human Rights Law for Universities of Ukraine and Moldova

Date du début: 15 oct. 2016, Date de fin: 14 oct. 2019,

Wider objective is to enable Ukraine and Moldova to face the challenges of dealing with Human Rights policies in accordance with EU and international standards through capacity and institutional building measures. By developing and introducing new Bologna-compliant case-oriented master and doctoral curricula, intensive capacity building mechanism and establishing Offices of Student Ombudsman suppo ...
Voir le projet

 17

 TERMINÉ 

SMEs Human resource attraction, retention and performance enhancement network

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

...he other partners (CZ, FIN, LI) which will enrich current knowledge amongst the participating institutions.Intended objectives: graduates finding jobs more easily in the region where they studied the university, mainly in SMEs, that are the largest group of employers in these regions; HR teachers who are better equipped with knowledge and expertise based not only on HR theory but more on daily pra ...
Voir le projet

 5

 TERMINÉ 

Geometrical Quality Control and Large Scale Metrology in the Aeronautic Industry

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

BACKGROUNDThe aeronautic Industry have a special place in European advanced manufacturing. It's stands in the high-added value productions and uses the most demand technologies and quality control . To ensure interchangeability and advanced performance, parts to be assembled need appropriate QUALITY CONTROL as well as advanced design and optimisation. A key factor for the successful implementation ...
Voir le projet

 5

 TERMINÉ 
TCBL uses Europe’s Textiles & Clothing (T&C) industry as test beds for evolutionary-driven co-design, dynamic optimisation and deployment of business models. It aims to increase the performance of a sector that, over the past two decades, upheld three main strategies to handle global competitive pressure: cost-oriented, product/service-oriented and productivity-oriented. TCBL provides a business e ...
Voir le projet

 19

 TERMINÉ 

Enhancing Synergies for disaster PRevention in the EurOpean Union (ESPREssO)

Date du début: 1 mai 2016, Date de fin: 31 oct. 2018,

ESPREssO aims at contributing to a new strategic vision to approach natural risk reduction and climate change adaptation, thereby opening new frontiers for research and policy making. From this perspective it wants also to be of support to the EC research and development and to the JRC Knowledge Centre on Disaster Risk Management.To achieve this goal, the project structure is built upon the centra ...
Voir le projet

 7

 TERMINÉ 

Advancing Skill Creation to ENhance Transformation

Date du début: 15 oct. 2015, Date de fin: 14 oct. 2018,

...4) Increase international cooperation by partner HEIs on research programmes that tackle ways to increase societal resilience to disasters; 5) explore, promote and initiate opportunities for fruitful university / industry partnerships to increase societal resilience to disasters; and 6) publicise the project progress, successes and outcomes as far as possible, and raise awareness across the field ...
Voir le projet

 14

 TERMINÉ 
Develop Business and Economic Research Centers Capacity (BERC) aims to develop the quality of business and economic research environment in West Bank and Gaza strip. The literature shows that production of research is not according to the quality standards and suffering from many challenges. Researchers as well as teaching staff have inconvenient experience in contribution in the knowledge parad ...
Voir le projet

 9

 TERMINÉ 
...unt current trends in engineering education as well as practice-based cases. Consortium consists of very well experienced partners and experts in the proposed subject. The coordinating institution is University of Bielsko-Biala (Poland). Other involved partners are: Warsaw University of Technology (Poland), Friedrich-Alexander-Universitat Erlangen Nurnberg (Germany), Universita Degli Studi di Pad ...
Voir le projet

 9

 TERMINÉ 

EU Intersex Citizenship (EUICIT)

Date du début: 1 sept. 2016, Date de fin: 31 août 2018,

The EUICIT action addresses the rights claims and agendas of intersex people and those with Disorders of Sexual Development (DSD), in response to recent Council of Europe recommendations to revise medical and policy approaches. The term 'Intersex' refers to people born with sex characteristics (chromosomal, gonadal and/or anatomical) not easily classifiable as either male or female; at least 1 per ...
Voir le projet

 1

 TERMINÉ 
With the advent of advanced manufacturing technology and the advent of intelligent manufacturing, it is becoming more and more important to fast and accurately measure 3D shape of components surface, especially specular objects, in the process of intelligent manufacturing, which is a guarantee to improve the product quality. This project will solve the challenging problems in deflectometry. If suc ...
Voir le projet

 1

 TERMINÉ 
DYNAFREIGHT stands for Innovative technical solutions for improved train DYNAmics and operation of longer FREIGHt Trains. The project will provide inputs for the development of the next railway freight propulsion concepts within S2R. Two main areas will be addressed: 1. Freight running gear for locomotives: DYNAFREIGHT will design and develop the necessary concepts that will allow a locomotive fre ...
Voir le projet

 11

 TERMINÉ 

Innovative Welding Processes for New Rail Infrastructures (WRIST)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

WRIST will develop and demonstrate flexible and cost effective joining processes for rail products, and in particular for advanced bainitic rail steels, which have been developed to answer the increasing demands of increasing speed and growth of railway’s load. This will be delivered by the combined development of the joining processes itself, welding experiments, computational modelling, material ...
Voir le projet

 10

 TERMINÉ 

Innovative Intelligent Rail (IN2RAIL)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

IN2RAIL is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by delivering important building blocks that unlock the innovation potential that exists in SHIFT2RAIL: innovative technologies will be explored and resulting concepts embedded in a systems framework where infrastructure, information management, maintenance techniques, energy, and engineer ...
Voir le projet

 56

 TERMINÉ 

Capacity building in agricultural innovation services in CEE countries

Date du début: 1 sept. 2016, Date de fin: 28 févr. 2018,

Short Project DescriptionCapacity building in agricultural innovation services in CEE countries (CATAlySt) project aims to support agricultural innovation within the CEE region by identifying the necessary skillset and knowledge for practicing agricultural innovation professionals and providing them with a well elaborated training programme based on Dutch and British examples.ObjectiveThe aim of t ...
Voir le projet

 8

 TERMINÉ 

STEAM- Making Sense of Science through Art (STEAM)

Date du début: 1 mai 2016, Date de fin: 30 nov. 2017,

STEAM will adopt a novel multidisciplinary approach which utilities the medium of art and creative disciplines to communicate complex STEM concepts to a wide audience.The University of Huddersfield will be the primary site for the STEAM events which will showcase the research ongoing at universities and businesses across the Yorkshire Region, emphasizing specifically the pan-European research with ...
Voir le projet

 1

 TERMINÉ 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2016, Date de fin: 30 sept. 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

Semantic Data Management (SemData)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

Semantic data management refers to a range of techniques for the manipulation and usage of data basedon its meaning. Semantically enabled linked and open data have been published at an increasing pace inrecent years, and this technology has been adopted by major industrial players, including Google, Yahoo,Oracle, Talis and IBM. But to reach their full potential of becoming a transformative technol ...
Voir le projet

 5

 TERMINÉ 
In 2011, the White Paper on European Transport reasserted how fundamental transport was for society, for the mobility of European citizens and for the growth and vitality of the European economy.CAPACITY4RAIL will deliver research that is innovative, prepares rail for the future and takes into account results from previous research projects and programmes. The project builds on previous useable re ...
Voir le projet

 48

 TERMINÉ 

Children's Identities and Citizenship - Best Practice Guides

Date du début: 1 sept. 2014, Date de fin: 31 août 2017,

This proposal has focus on European Integration promoting active citizenship in young people through guidance for the training of education professionals and young researchers. It links 25 institutions from 17 states that are involved in training education professionals and concerned with citizenship education (CE) and the development of identities in young people. We emphasise that our concern is ...
Voir le projet

 25

 TERMINÉ 

Enhanced European Coordination for Accelerator Research & Development (EUCARD-2)

Date du début: 1 mai 2013, Date de fin: 30 avr. 2017,

Research accelerators are facing important challenges that must be addressed in the years to come: existing infrastructures are stretched to all performance frontiers, new world-class facilities on the ESFRI roadmap are starting or nearing completion, and strategic decisions are needed for future accelerators and major upgrades in Europe.While current projects concentrate on their specific objecti ...
Voir le projet

 40

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2015, Date de fin: 30 sept. 2016,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 
The current maintenance policies, including e.g. RCM (Reliability Centred Maintenance) and TPM (Total Productive Maintenance), can be generally useful in answering questions such as “how much maintenance should be done on this machine?” “How frequently should this part be replaced?” “How many spare parts should be kept in stock?” “How should the shutdown be scheduled?” It is generally accepted tha ...
Voir le projet

 14

 TERMINÉ 
The proposed EMInstr project aims to elevate the important research result, a lab prototype of a new wavelength scanning interferometer (NWSI) developed during the ERC-2008-ADG 228117 SURFUND project and to verify its potential as a commercial product. The EMInstr project intends to set up a commercialisation pathway: from verification/validation of the lab prototype, through to technical optimisa ...
Voir le projet

 1

 TERMINÉ 
Proposal Full title: Biomimetic Approaches of Natural Functional Surfaces with hierarchical micro & nano structure and the extreme Wettability (Acronym: BioApproNFS Wett)Abstract:In the natural world, plants and animals have evolved over time to best adapt to the environment. They interact very effectively with the surrounding environment by exchanging energies and mass flow across their cuticles ...
Voir le projet

 6

 TERMINÉ 

Nanoscale Defect Detection, Cleaning and Repair for Large Area Substrates (NANOMEND)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2015,

NanoMend will pioneer efforts to develop better, more integrated process inspection, cleaning, repair and control systems for nano-scale thin films on large area foils, and will do so in two exemplar vertical supply chains for functionalized polymer-coated paper products and for low cost flexible photovoltaics (PV). The aim is to demonstrate beyond state-of-the-art in-line detection, cleaning an ...
Voir le projet

 15

 TERMINÉ 

FP7 High Luminosity Large Hadron Collider Design Study (HILUMI LHC)

Date du début: 1 nov. 2011, Date de fin: 31 oct. 2015,

The Large Hadron Collider (LHC) is the largest scientific instrument ever built. It has been exploring the new energy frontier since 2009, gathering a global user community of 7,000 scientists. It will remain the most powerful accelerator in the world for at least two decades, and its full exploitation is the highest priority in the European Strategy for Particle Physics, adopted by the CERN Counc ...
Voir le projet

 16

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

The University of Huddersfield?s vision is ?To be an inspiring, innovative University of international renown? and our Strategy Map outlines our aims. The University?s International aims are to become an increasingly popular destination of choice for world class international students, to ensure our international students have an inspiring world class student experience and to become ranked as an ...
Voir le projet

 1

 TERMINÉ 
"A sustainable and efficient freight transport in Europe plays a vital role in having a successful and competitive economy. Freight transport is expected to grow by some 50 % (in tonne-kilometres) by 2020. However rail has, in many areas, been displaced from a dominant position as road transport services have grown and developed in capability and levels of sophistication that have not been matche ...
Voir le projet

 31

 TERMINÉ 
Modern manufacturing techniques and logistics require reliable, time sensitive delivery of lower density and higher value goods. This presents a market opportunity for rail freight to grow, partly due to increasing congestion on roads, and mainly due to the need for reliable and environment friendly transport of goods. At the same time, to meet customer requirements, rail freight has to rise to th ...
Voir le projet

 24

 TERMINÉ 
CASCADE aims to provide the foundation for a future INCONET programme targeting South Asian Countries, which will promote bi-regional coordination of Science &Technology (S&T) cooperation, including priority setting and definition of S&T cooperation policies. The objectives of CASCADE, as an 18-month supporting action, are to: compile a regional position paper that identifies global challenges and ...
Voir le projet

 18

 TERMINÉ 

Preserving Linked Data (Prelida)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2014,

PRELIDA will target the particular stakeholders of the Linked Data community, including data providers, service providers, technology providers and end user communities. These stakeholders have not been traditionally targeted by the Digital Preservation community, and are typically not aware of the digital preservation solutions already available. So an important task of PRELIDA is to raise awaren ...
Voir le projet

 5

 TERMINÉ 
This proposed project explores fundaments and principles for surface measurement and characterization for ultra/nano-precision non-Euclidean geometry and deterministic surfaces, which are vital for making possible key areas of 21st century science - pure and applied, engineering and bio-engineering. The research will explore an original integrated measurement and characterization system with two ...
Voir le projet

 1

 TERMINÉ 
D-RAIL will focus on freight traffic, identifying root causes of derailment of particular significance to freight vehicles, which have a wider range of operating parameters (as a result of the huge range in loads, speeds and maintenance quality) than passenger vehicles. One key question that will be studied is how independent minor faults (e.g., a slight track twist and a failing bearing) could co ...
Voir le projet

 22

 TERMINÉ 
The certification of a rail vehicle according to European regulations, Technical Specifications for Interoperability, European Standards and national safety rules represents a significant element of both vehicle cost and time to market. Indeed, a large part of vehicle certification mandates testing for safety, performance and infrastructure compatibility. The new EN standards together with the CR/ ...
Voir le projet

 23

 TERMINÉ 

European Coordination for Accelerator Research and Development (EuCARD)

Date du début: 1 avr. 2009, Date de fin: 31 juil. 2013,

Particle physics stands at the threshold of a new era of discovery and insight. Results from the much awaited LHC are expected to shed light on the origin of mass, supersymmetry, new space dimensions and forces. In July 2006 the European Strategy Group for Particle Physics defined accelerator priorities for the next 15 years in order to consolidate the potential for discovery and conduct the requi ...
Voir le projet

 39

 TERMINÉ 
The primary goal of HARCO project is to achieve cost-effective structural solutions consisting of a new class of Smart Components (belonging to machine tools applications) based on plug-and-produce “Modular Adaptronic devices” which integrate smart and multifunctional actuators/sensors capable of performing a wide array of multiple functions, ranging from high and adaptable damping and stiffness c ...
Voir le projet

 10

 TERMINÉ 
"COPING presents a child-centred research strategy covering four European countries, the UK, Germany, Romania and Sweden, which will identify the characteristics of children with imprisoned parents, their resilience, and their vulnerability to mental health problems. This group of children are exposed to triple jeopardy through break-up of the family, financial hardship, and extremes of stigma and ...
Voir le projet

 10

 TERMINÉ 

SELF OPTIMISING MEASURING MACHINE TOOLS (SOMMACT)

Date du début: 1 sept. 2009, Date de fin: 31 août 2012,

SOMMACT develops and validates an innovative production hardware and control system founded on understanding, evaluating and controlling production system performances. This approach is based on detection (in-process traceable measurement embedded capabilities) and compensation (adaptive control and self-learning capabilities) of geometrical effects of varying external and internal quantities, suc ...
Voir le projet

 12