Rechercher des projets européens

7 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Export Restriction Free Travelling wave tubes Materials (ERFTM)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2019,

...on process for space tubes and terrestrial communication tubes, as well as a commercial evaluation of the technologies involved.The ERFTM consortium includes 2 European large enterprises from the Thales Group, worldwide leaders in space TWT development and production, 1 industrial company and 2 SMEs. The latter 3 companies are innovative technology providers not yet involved in the space domain. I ...
Voir le projet

 6

 TERMINÉ 

MYRRHA Research and Transmutation Endeavour (MYRTE)

Date du début: 1 avr. 2015, Date de fin: 31 mars 2019,

The Strategic Research Agenda of the EU Sustainable Nuclear Energy Technical platform requires new large infrastructures for its successful deployment. MYRRHA has been identified as a long term supporting research facility for all ESNII systems and as such put in the high-priority list of ESFRI. The goal of MYRTE is to perform the necessary research in order to demonstrate the feasibility of trans ...
Voir le projet

 28

 TERMINÉ 

Aviation Safety and Certification of new Operations and Systems (ASCOS)

Date du début: 1 juil. 2012, Date de fin: 30 sept. 2015,

"Fundamental changes in the institutional arrangements for aviation regulation in Europe, the introduction of new technologies and operations, and demands for higher levels of safety performance call for the adaptation of existing certification processes. Therefore, the main objective of ASCOS is to develop novel certification process adaptations and supporting safety driven design methods and too ...
Voir le projet

 15

 TERMINÉ 

"MYRRHA Accelerator eXperiment, research and development programme" (MAX)

Date du début: 1 févr. 2011, Date de fin: 31 juil. 2014,

"The present FP-7 proposal MAX is subsequent to the recommendations of the Strategic Research Agenda of SNETP for ADS development in Europe. Its aim is to pursue the R&D required for a high power proton accelerator as specified by the MYRRHA project. There is especially a strong focus on all the aspects that pertain to the reliability and availability of this accelerator.This R&D effort builds on ...
Voir le projet

 11

 TERMINÉ 

Efficient Integrated Security Checkpoints (EFFISEC)

Date du début: 1 mai 2009, Date de fin: 31 janv. 2014,

Illegal immigration and illicit material detection is a growing concern at the European borders; in that respect border security checkpoints must be particularly efficient against any kind of threat. If airport checkpoints controls are today technically improving, land and seaport checkpoints differ strongly from airports ones and are more complex to process. During the last years, most of the eff ...
Voir le projet

 18

 TERMINÉ 

Technology for Wafer-scale Carbon Nanotube Applications (TECHNOTUBES)

Date du début: 1 mai 2009, Date de fin: 30 avr. 2012,

Carbon nanotubes are materials with a set of unique electrical, mechanical, surface and thermal properties. Yet their adoption in mainstream applications has been limited by mass production and device integration. This project develops the first 300mm wafer-scale equipment for production of carbon nanotubes on surfaces. The project will cover the design, engineering, process control, quality assur ...
Voir le projet

 12

 TERMINÉ 

Optically Driven Terahertz Amplifiers (OPTHER)

Date du début: 1 avr. 2008, Date de fin: 30 sept. 2011,

This proposal focuses on the development of an application-specific component that works in the Terahertz (THz) regime; in this context, we propose to realize a THz source with innovative features specific for monitoring systems for safety and security. Until now the use of THz monitoring system has been strongly limited due to the very low power and the large dimensions of the existing sources ...
Voir le projet

 6