Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The main objective of the ANASTACIA is to address the constant discovery of vulnerabilities in ICT components providing assurance that ICT systems are secure and trustworthy by design. To this end, ANASTACIA will research and develop a holistic security framework, which will address all the phases of the ICT Systems Development Lifecycle and will be able to take autonomous decisions using new netw ...
Voir le projet

 14

 TERMINÉ 

Transforming Transport (TT)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2019,

Big Data will have a profound economic and societal impact in the mobility and logistics sector, which is one of the most-used industries in the world contributing to approximately 15% of GDP. Big Data is expected to lead to 500 billion USD in value worldwide in the form of time and fuel savings, and savings of 380 megatons CO2 in mobility and logistics. With freight transport activities projected ...
Voir le projet

 48

 TERMINÉ 

CO-modal journey re-ACcommodation on associated Travel serVices (Co-Active)

Date du début: 1 sept. 2016, Date de fin: 31 déc. 2018,

Conceptually, the CO-ACTIVE project addresses the general enrichment of the ‘one-stop-shop’ capability as initiated in the IT2Rail project and further completes the scope of functionality by addressing post-sale business transactions, and an underlying payment-settlement solution for comodally retailed products and services. This provides the opportunity to focus specifically on those aspects of c ...
Voir le projet

 6

 TERMINÉ 

DRiving InnoVation in crisis management for European Resilience (DRIVER)

Date du début: 1 mai 2014, Date de fin: 31 oct. 2018,

DRIVER starts from the experience that neither successful R&D nor strong end-user demand always lead to innovation in the Crisis Management (CM) domain. This is a problem since as societies become more complex, increasing scope and unpredictability of potential crises and faster dynamics of major incidents put increasingly stringent demands on CM. European CM capabilities already constitute a matu ...
Voir le projet

 38

 TERMINÉ 

Innovative Intelligent Rail (IN2RAIL)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

IN2RAIL is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by delivering important building blocks that unlock the innovation potential that exists in SHIFT2RAIL: innovative technologies will be explored and resulting concepts embedded in a systems framework where infrastructure, information management, maintenance techniques, energy, and engineer ...
Voir le projet

 56

 TERMINÉ 
"SAFURE targets the design of cyber-physical systems by implementing a methodology that ensures safety and security "by construction". This methodology is enabled by a framework developed to extend system capabilities so as to control the concurrent effects of security threats on the system behaviour.The current approach for security on safety-critical embedded systems is generally to keep subsyst ...
Voir le projet

 12

 TERMINÉ 

Shared Access Terrestrial-Satellite Backhaul Network enabled by Smart Antennas (SANSA)

Date du début: 1 févr. 2015, Date de fin: 31 janv. 2018,

The aim of SANSA project is to boost the performance of mobile wireless backhaul networks in terms of capacity and resilience while assuring an efficient use of the spectrum. Recently, a global mobile traffic increase of 11-fold between 2013 and 2018 was predicted, so novel solutions are required to avoid backhaul becoming the bottle neck of future mobile networks. The solution envisaged in SANSA ...
Voir le projet

 8

 TERMINÉ 

PANACHE

Date du début: 2 janv. 2014, Date de fin: 2 janv. 2018,

Pilot line for Advanced Nonvolatile memory technologies for Automotive microControllers, High security applications and general Electronics :The PANACHE project objective is to set-up a pilot line for embedded Flash technology design and manufacturing platform for the prototyping of innovative µcontrollers in Europe.The current 40nm technology platform as well as the already defined 55nm technolog ...
Voir le projet

 21

 TERMINÉ 

elastic WIreless Networking Experimentation (eWINE)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2017,

The elastic Wireless Networking Experimentation (eWINE) research project will realize elastic networks that can scale to a high number of users in a short timespan through the use of an agile infrastructure (intelligent software and flexible hardware), enabling: (1) dynamic on-demand end-to-end wireless connectivity service provisioning, (2) elastic resource sharing in dense heterogeneous and smal ...
Voir le projet

 10

 TERMINÉ 

Eyes of Things (EoT)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

Vision, our richest sensor, allows inferring big data from reality. Arguably, to be “smart everywhere” we will need to have “eyes everywhere”. Coupled with advances in artificial vision, the possibilities are endless in terms of wearable applications, augmented reality, surveillance, ambient-assisted living, etc. Currently, computer vision is rapidly moving beyond academic research and factory aut ...
Voir le projet

 9

 TERMINÉ 

Service Programing and Orchestration for Virtualized Software Networks (SONATA)

Date du début: 1 juil. 2015, Date de fin: 31 déc. 2017,

Virtualisation and software networks are a major disruptive technology for communications networks, enabling services to be deployed as software functions running directly in the network on commodity hardware. However, deploying the more complex user-facing applications and services envisioned for 5G networks presents significant technological challenges for development and deployment. SONATA addr ...
Voir le projet

 17

 TERMINÉ 

5G Enablers for Network and System Security and Resilience (5G-ENSURE)

Date du début: 1 nov. 2015, Date de fin: 31 oct. 2017,

5G-ENSURE will define and deliver a 5G Security Architecture, shared and agreed by the various 5G stakeholders. It will specify, develop and release an initial set of useful and usable security enablers for 5G. These enablers will be selected for their relevance in addressing some of the foremost security concerns in order to generate the trust and confidence necessary for 5G to be widely adopted ...
Voir le projet

 16

 TERMINÉ 
The ROLL2RAIL project aims to develop key technologies and to remove already identified blocking points for radical innovation in the field of railway vehicles, as part of a longer term strategy to revolutionise the rolling stock for the future.The high level objectives of the work are to pave the way to:• Increase the capacity of the railway system and bring flexibility to adapt capacity to deman ...
Voir le projet

 34

 TERMINÉ 

INFORMATION TECHNOLOGIES FOR SHIFT TO RAIL (IT2RAIL)

Date du début: 1 mai 2015, Date de fin: 31 oct. 2017,

The IT²RAIL -“Information Technologies for Shift to rail” proposal, first step towards the long term IP4 -“IT for an Attractive Railway” SHIFT²RAIL Innovation Programme, aims at providing a new seamless travel experience, giving access to a complete multimodal travel offer which connects the first and last mile to long distance journeys.This is achieved through the introduction of a ground breakin ...
Voir le projet

 33

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 

Next Generation Train Control (NGTC)

Date du début: 1 sept. 2013, Date de fin: 28 févr. 2017,

The main scope of this Next Generation Train Control (NGTC) project is to analyse the commonality and differences of required functionality for mainline and urban lines and develop the convergence of both ETCS and CBTC systems, determining the level of commonality of architecture, hardware platforms, and system design that can be achieved. This will be accomplished by building on the experience of ...
Voir le projet

 21

 TERMINÉ 

Dependable Embedded Wireless Infrastructure (DEWI)

Date du début: 1 mars 2014, Date de fin: 28 févr. 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Voir le projet

 61

 TERMINÉ 

Arrowhead (ARROWHEAD)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Voir le projet

 87

 TERMINÉ 

An integrated development environment for portable network applications (NetIDE)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

While most of programmable network gear vendors support OpenFlow nowadays, a number of fragmented control plane solutions exist for proprietary software-defined networks. Thus, network applications developers need to re-code their solutions every time they target a network infrastructure based on a different controller. Moreover, different network developers adopt different solutions as abstract c ...
Voir le projet

 10

 TERMINÉ 
Description Process (mix, modulate, synchronise) and detect microwave frequencies based on innovative spin transfer devices.The overarching objective of the MOSAIC project is to bring the device level knowledge acquired in the past years by the partners towards systems as a first crucial step towards industrialization, warranting the lead ...
Voir le projet

 9

 TERMINÉ 
Flexible spectrum usage is a promising enabler of spectral efficiency for next generation wireless broadband networks. In order to deliver the next order of magnitude gains in terms of overall spectral and radio efficiency envisioned for 2020, wireless access will have to be revisited both from a policy as well as from a technology innovation perspective. On the policy side, with the emergence of ...
Voir le projet

 8

 TERMINÉ 

Spectrum OverLay through aggregation of heterogeneous DispERsed Bands (SOLDER)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

Wireless access is becoming the dominant way of connecting to the Internet due to the high data rates that several radio access technologies (RATs) provide. Such success is a result of several advances in wireless communications over the last two decades. A key enabling technique which promises further improvement in data rates is carrier aggregation (CA). Intra-band and inter-band carrier aggrega ...
Voir le projet

 6

 TERMINÉ 

Future Internet - Core (FI-Core)

Date du début: 1 sept. 2014, Date de fin: 30 sept. 2016,

FI-WARE has started to materialize as a powerful foundation for the Future Internet. FI-WARE is an innovative, open cloud-based infrastructure for cost-effective creation and delivery of services, at a scale not seen before. FI-WARE is now well under way to successfully achieve its goals of boosting the effectiveness of creating new services of high economic and societal value, reinforcing EU comp ...
Voir le projet

 33

 TERMINÉ 

COgnitive & Perceptive CAMeraS (COPCAMS)

Date du début: 1 avr. 2013, Date de fin: 30 sept. 2016,

Vision systems are becoming ubiquitous in our daily lives. Complex analysis of images from multiple cameras will become the norm in the future, from cars to industrial systems, from smart cities to facility monitoring, aimed at extracting meaningful, context-dependent information.Today’s market is dominated by a combination of relatively simple, fixed function, configurable cameras that stream vid ...
Voir le projet

 25

 TERMINÉ 
Emerging embedded systems platforms harnessing new heterogeneous, multicore architectures to enable the next generation of powerful mission-critical applications are demanding across-the-board advances in all areas of design and development to fulfil their promise. The integration of component-based design with model-driven development creates a potent combination especially capable of mastering t ...
Voir le projet

 16

 TERMINÉ 

PrivAcy pReserving Infrastructure for Surveillance (PARIS)

Date du début: 1 janv. 2013, Date de fin: 29 févr. 2016,

PARIS will define and demonstrate a methodological approach for the development of surveillance infrastructure which enforces the right of citizens for privacy, justice and freedom and takes into account the evolving nature of such rights, e.g. aspects that are acceptable today might not be acceptable in the future, and the social and anthropological nature of such rights, e.g. perception of such ...
Voir le projet

 9

 TERMINÉ 

Broadband Access via Integrated Terrestrial & Satellite Systems (BATS)

Date du début: 1 oct. 2012, Date de fin: 31 déc. 2015,

BATS addresses the integrated delivery of BroadBand (BB) future Internet services for European coverage according to the EC Digital Agenda objective to reliably deliver >30Mbps to 100% of European households by 2020. In order to accommodate the 'unserved' and 'underserved' areas of Europe, an ultra high speed satellite system is researched that provides order of magnitude cost/bit reductions and s ...
Voir le projet

 17

 TERMINÉ 
Organized crime is becoming more diverse in its activities and methods including “greater levels of collaboration between criminal groups, greater mobility in and around the EU, a diversification of illicit activity, and a growing dependence on a dynamic infrastructure, anchored in key locations and facilitated by widespread use of the Internet” (the Director of Europol, in his foreword to the OCT ...
Voir le projet

 19

 TERMINÉ 

AIRBorne information for Emergency situation Awareness and Monitoring (AIRBEAM)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2015,

The AIRBEAM project proposes a situation awareness toolbox for the management of crisis over wide area taking benefit of an optimised set of aerial (unmanned) platforms, including satellites.The number of unmanned air- and space-borne platform available and their associated sensors present a new set of challenges to end users involved in the effective management of emergencies and actions of law e ...
Voir le projet

 24

 TERMINÉ 

Achieving The Trust Paradigm Shift (ATTPS)

Date du début: 1 juil. 2012, Date de fin: 31 oct. 2015,

Trust is an essential prerequisite for connecting people in effective transactions. It builds into the society on elements like security, privacy, transparency, accountability and reputation. European strategy must aim at a strong competitive position in producing trustworthy ICT that bring new attractive ways of living and working that are perceived as trustworthy.The Trust in Digital Life (TDL) ...
Voir le projet

 12

 TERMINÉ 

Future media Internet for large scale CONTENT experimentation 2 (FI-CONTENT 2)

Date du début: 1 avr. 2013, Date de fin: 31 oct. 2015,

The FI-CONTENT 2 project aims at establishing the foundation of a European infrastructure for promoting and testing novel uses of audio-visual content on connected devices. The partners will develop and deploy advanced platforms for Social Connected TV, Mobile Smart City services, and Gaming/ Virtual worlds. To assess the approach and improve these platforms, user communities in 6 European locatio ...
Voir le projet

 31

 TERMINÉ 
Recent history has shown that in the aftermath of an emergency, disaster or related unexpected events, telecommunication infrastructures play a key role in recovery operations. In most cases, the legacy terrestrial infrastructure is seriously compromised and cannot guarantee reliable services for citizens and rescue teams. It is also well accepted that current public safety networks cannot provide ...
Voir le projet

 18

 TERMINÉ 

OPerational Trustworthiness Enabling Technologies (OPTET)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2015,

The OPTET project plans through a multi-disciplinary and integrated approach to identify and address the drivers of trust and confidence also fight against its erosion (especially true on the Internet or Cloud). Focus of this project is on socio-technical systems connected to the Internet. The resulting technologies enabling trustworthiness would be verified on two distinct existing execution plat ...
Voir le projet

 10

 TERMINÉ 

eXperimental Infrastructures for the Future Internet (XIFI)

Date du début: 1 avr. 2013, Date de fin: 30 sept. 2015,

XIFI will establish a sustainable marketplace for trial infrastructures and Future Internet services.XIFI will achieve this vision by integrating and federating a multiplicity of heterogeneous environments – starting from the generic and specific enablers provided by the FI-WARE core platform and the FI-PPP use cases and early trials.Through this approach XIFI will demonstrate and validate the pot ...
Voir le projet

 38

 TERMINÉ 

A Source code analysis Toolbox for software security AssuraNCE (STANCE)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2015,

The immunity of a system to malicious third parties trying to modify its behaviour (e.g. to perform unauthorized actions) is called security. Ensuring this feature in information and communication technologies is a requirement for establishing a trustworthy Information Society. Several strategies can be explored to deal with this problem. One of them, called program analysis, relies on formal tech ...
Voir le projet

 10

 TERMINÉ 
VideoSense will integrate leading European research groups to create a long term open integration of critical mass in the twin areas of Ethically-Guided and Privacy Preserving Video Analytics where the advent of new data intelligence technologies against the background of dynamic societal and citizen’s goals, norms, expectations, safety and security needs and thus surveillance requirements have al ...
Voir le projet

 9

 TERMINÉ 

Self adaptive heterogeneous manycore based on Flexible Tiles (FlexTiles)

Date du début: 15 oct. 2011, Date de fin: 14 avr. 2015,

Description To develop an energy-efficient programmable heterogeneous manycore platform with self-adaptive capabilities that apply to cognitive radio, video processing, embedded devices and ambient computingA major challenge in computing is to leverage multi-core technology to develop energy-efficient high performance systems. This is cri ...
Voir le projet

 12

 TERMINÉ 
SARABAND project aims to take advantage of the Q-band frequency (40,5 to 43,5 GHz) in a cost effective way to provide higher performing and integrated network nodes for wireless backhaul of future mobile radio and last mile access for the digital divide by developing smart antennas and front-end radio modules. The use of millimeter waves, particularly the Q-band where 3GHz bandwidth has been regul ...
Voir le projet

 10

 TERMINÉ 
European industry has a great potential to achieve a leading position in the growing global market of safety-relevant embedded systems, provided it is able to devise efficient and industrial-strength methods and processes for their development and certification.nSafeCer targets increased efficiency and reduced time-to-market by composable safety certification of safety-relevant embedded systems. A ...
Voir le projet

 31

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Voir le projet

 92