Rechercher des projets européens

22 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Improving Road Infrastructure Safety in the Baltic Sea Region (BALTRIS)

Date du début: 10 juin 2010, Date de fin: 9 sept. 2013,

Safe transportation is an element in the overall objective of the BSR programme – to make the BSR an attractive place to work and live in. However increasing road traffic volumes in the BSR come at a price of accidents during which lives are lost and injuries caused. There are large differences among BSR countries in road safety performance. Transportation in the south-eastern part of the region i ...
Voir le projet

 7

 TERMINÉ 

North East Cargo Link II - NECL II (NECL II)

Date du début: 10 juin 2010, Date de fin: 9 sept. 2013,

...363&contentlan=2&culture=en-US In the spring of 2013 the project was asked officially to income with statements and speaks on a conference held by the Nordic Council. A result the council asked the Swedish parliament to request the Swedish government to take actions regarding the possible implications from the Sulphur directive. Continue below... The Nordic Council made their own study and sent ...
Voir le projet

 23

 TERMINÉ 
The EWTC II project started in 2009 and was a follow up of the EWTC project completed in 2007, with the overall aim to highlight the development of a ”Green Corridor Concept” as a best practise case in the European context. Green transport corridors are defined as a concentration of freight traffic between major hubs and by relatively long distances where short sea shipping, rail, inland waterways ...
Voir le projet

 29

 TERMINÉ 

Scandinavian-Adriatic Corridor for Growth and Innovation (SCANDRIA)

Date du début: 31 août 2009, Date de fin: 8 sept. 2012,

Against the background of doubling freight transport volumes by 2050 in the Baltic Sea Region (BSR), capable transport infrastructures are required for efficient, integrated and sustainable freight and passenger traffic.The Scandinavian-Adriatic Development Corridor is the shortest geographical link between Baltic and Adriatic Sea. It provides freight transport capacities to relieve overloaded Wes ...
Voir le projet

 19

 TERMINÉ 

ROADEX Network Implementing Accessibility 4.1 (ROADEX IV)

Date du début: 30 juin 2009, Date de fin: 29 juin 2012,

...website; Lesson B on website and being reviewed; Lesson C draft out for consultation; Lesson D being prepared; Translators appointed; Translations into Finnish, Icelandic, Greenlandic, Norwegian, Swedish commenced. The ROADEX Website – the website was launched on 15 June 2010 and has been populated will all ROADEX materials to date. This website aims to be the one stop shop for all matters perta ...
Voir le projet

 11

 TERMINÉ 

Visualization of Infrastructure and Sustainable development in Oresund (VISÖ)

Date du début: 31 oct. 2008, Date de fin: 31 oct. 2011,

...h improves the quality of life and strengthens the economic development while simultaneously improving the service quality in the regions build environment.Project VISÖ was a collaboration between Swedish and Danish state and regional planning authorities within the Oresund Region. The Swedish Transportation Authority (Trafikverket) was the project Lead Partner and the Danish Road Directorate (Vej ...
Voir le projet

 6

 TERMINÉ 
Baltic Gateway PLUS aimed at joint actions to implement and finance prioritised transport projects in the South Baltic Sea area. Focus was on infrastructure investments in the hinterland connections, as well as on implementation of intermodal services. The project involved 30 partners from six countries and had an overall budget of approximately 1 MEUR. It was implemented in the period 2006-2007.B ...
Voir le projet

 31

 TERMINÉ 

East-West Transnational Transport Corridor in the S-BSR (EAST-WEST)

Date du début: 31 déc. 2005, Date de fin: 30 déc. 2007,

In the Baltic Sea Region, trade and traffic in the east-west direction is increasing dramatically. The need to develop sustainable transport in the east-west direction is therefore of outmost importance. The “East-West transport Corridor (EWTC)” between Vilnius and Esbjerg via the Öresund region, includes several TEN-T ports, road and railways links, parts of the Nordic triangle and Corridor IX B/ ...
Voir le projet

 47

 TERMINÉ 
... Expected Results: · executive summaries of the published ROADEX works and translations into local Partner languages for ease of use by local staff; Swedish, Norwegian, Finnish, Icelandic and Danish· individual training packages· trials of promising techniques and practices in new areas· a well organised website with good online information and int ...
Voir le projet

 9

 TERMINÉ 

SUSTAINABLE TRANSPORT IN THE BARENTS REGION - PHASE II (STBR II)

Date du début: 10 janv. 2006, Date de fin: 29 déc. 2007,

The objective of the STBR process is to develop a transport strategy for the whole of Barents Region jointly, and as an outcome propose and prepare concrete measures, which in due time can be included in national investment programs of each country. The strategy will rest on the realisation that the transport authorities of all countries need to see the Barents Region as a common transport area an ...
Voir le projet

 26

 TERMINÉ 
The Baltic Sea Region is facing an increasing urban traffic which contributes to pollution abundance and less attractive cities. Baltic Sea Cycling is a co-operation between 22 partners in Germany, Latvia, Lithuania, Norway, Poland and Sweden for the development of sustainable and attractive townscapes. The project has addressed problems concerning the integration of cycling as a part of urban tra ...
Voir le projet

 22

 TERMINÉ 

Sustainable Development in the Mid Nordic Region (ProMidNord)

Date du début: 5 août 2004, Date de fin: 4 oct. 2007,

County Councils from Norway, Sweden and Finland being the members of the 25 year old Mid Nordic Committee (MNC)-covering the Mid Nordic Region (MNR)-are facing great challenges such as an ongoing decrease of the population and a tendency towards centralization of the whole society. The cities in the MNR have difficulties in balancing the increasing impact from the big cities. The population densit ...
Voir le projet

 27

 TERMINÉ 

Baltic Tangent

Date du début: 3 janv. 2005, Date de fin: 2 mai 2007,

...tleneck areas. The border crossings between Russia and Latvia and Estonia, rail capacity in the Baltic States, Riga traffic congestion, port and ferry capacities and the rail/road standard in the Swedish BT parts. Measures to eliminate or improve the situation concerning these bottlenecks will be most important as means for improving the accessibility to the main TEN corridors within the BT econom ...
Voir le projet

 34

 TERMINÉ 

North East Cargo Link (NECL)

Date du début: 31 déc. 2002, Date de fin: 2 déc. 2006,

Rail and road transports in the Northern Europe and the southern part of the Nordic Countries are presently hampered by congestion, causing traffic infarcts, high pollution, slow transport speeds and a threat to economic competitiveness. These problems are becoming more severe with the increasing traffic load.North East Cargo Link (NECL) is aiming at promoting and marketing new, speedy and safe in ...
Voir le projet

 45

 TERMINÉ 
Transportation of passengers and goods increases dramatically in the South Baltic Sea area. However, existing infrastructure and transport solutions are not enough equipped to manage the growth in an efficient and sustainable way. The challenging development called upon joint actions among organisations in several countries and on various levels. In the Baltic Gateway project, regional and local a ...
Voir le projet

 38

 TERMINÉ 
Cultural heritage, history and traditions play a mayor role in tourism development. Today tourists are often looking for qualitative offers and a combination between study tours and entertainment. The objective of the Ancient Times project was to preserve and further develop cultural heritage sites of the participating partners according to visitors' demands and in an ecological way. The aim was a ...
Voir le projet

 29

 TERMINÉ 

SUSTAINABLE TRANSPORT IN THE BARENTS REGION (STBR) (STBR )

Date du début: 9 mars 2003, Date de fin: 8 janv. 2006,

General objectives for STBR project are to strengthen transport planning cooperation in the Barents Region; increase the common understanding of transport problems in the region; help decision makers, planners, authorities and companies to see the region as a single transport area and to promote sustainable development in the region.These goals will be achieved by improving region-wide transport i ...
Voir le projet

 25

 TERMINÉ 
The overall aim of the BALTIC+ project was to form a permanent political platform for co-ordination and management of spatial development strategies and actions in a macro-region consisting of Skåne in Sweden, Mecklenburg-Vorpommern, Berlin and Brandenburg in Germany, and Western Pomerania in Poland. Agriculture and forestry, tourism, communication and infrastructure as well as promoting collabora ...
Voir le projet

 21

 TERMINÉ 

South East Baltic Transport Link (SEBTrans-Link )

Date du début: 28 août 2002, Date de fin: 27 nov. 2005,

...or investments in the ports and in the hinterland connections in order to meet the demands of the future. The networking will in Sweden be taken further by a Baltic Link Association.The Swedish partners identified a transport corridor, gave it an identity and decided to continue the work towards its recognition as a European-wide interest. Besides other efforts, they chose to give priority to inve ...
Voir le projet

 24

 TERMINÉ 

Bothnian Arc - Arctic Coastal Tourism Region (BothnianArc-ACTion )

Date du début: 25 juin 2002, Date de fin: 24 sept. 2005,

Bothnian Arc is a Swedish-Finnish coastal zone in the northern part of the Gulf of Bothnia with a sub-arctic climate. Thanks to the Gulf Stream, it has four distinct seasons and offers exotic tourism destinations in an arctic coast and archipelago milieu. However the tourism profile of the region and tourism competence there have to be strengthened. A trans-national co-operation for the developmen ...
Voir le projet

 33

 TERMINÉ 

Rural Development Connection (RDC )

Date du début: 31 juil. 2002, Date de fin: 30 juil. 2005,

The project focused on the sustainable development of rural areas as places to live and work, fighting against current problems in the countryside like depopulation, degradation, loss of jobs, brain drain, over aging population and insufficient infrastructure and supporting of rural tourism as one of the few business sectors in the rural areas with potentials. ...
Voir le projet

 37

 TERMINÉ 
Roadex proposes a 3-year trans-national technical collaboration across the Northern Periphery to develop ways for interactive and innovative road management of low traffic volume roads. The project will deal directly with road and transport issues raised by the unique combinations of remoteness, climate, ground conditions, low traffic volumes and long distances to markets. The main issues to be ad ...
Voir le projet

 10