Rechercher des projets européens

18 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Building and district thermal retrofit and management solutions (THERMOSS)

Date du début: 1 sept. 2016, Date de fin: 29 févr. 2020,

... platform for smart energy management at building and district-level. The THERMOSS technologies have been picked out from the catalogs of prominent European industrial players, Bosch, Veolia, Exergy, Schneider Electric taking into account business profitability, energy efficiency and potential for large-scale deployment. They will be tuned, combined and sized as part of the project thanks to dedic ...
Voir le projet

 13

 TERMINÉ 

Massive InteGRATion of power Electronic devices (MIGRATE)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

...ation. European TSOs from Estonia, Finland, France, Germany, Iceland, Ireland, Italy, Netherlands, Slovenia, Spain and UK have joined to address such challenges with manufacturers (Alstom, Enercon, Schneider Electric) and universities/research centres. They propose innovative solutions to progressively adjust the HVAC system operations. Firstly, a replicable methodology is developed for appraising ...
Voir le projet

 24

 TERMINÉ 
Pentagon is a 3-years research and innovation project that will investigate the potential of wider deployment of energy conversion technologies and strategies at district-level, with the aim to foster flexibility in the low-voltage and medium-voltage grid. The rationale that underlies Pentagon approach is that multi-vector smart districts can be the key enablers of future smart grids, provided the ...
Voir le projet

 10

 TERMINÉ 
Heating consumption in the residential sector in Europe is around 2300 TWh/y, DHW consumptions reaches 500 TWh/y, while cooling consumption is less than 100 TWh/y. The construction sector offers unique opportunities to decarbonise the European economy. However, as the replacement rate of the existing stock is very small (1-1.5 % per year), acceleration is needed.On top of this, the reorganisation ...
Voir le projet

 18

 TERMINÉ 
Embedded systems have significantly increased in technical complexity towards open, interconnected systems. This has exacerbated the problem of ensuring dependability in the presence of human, environmental and technological risks. The rise of complex Cyber-Physical Systems (CPS) has led to many initiatives to promote reuse and automation of labor-intensive activities. Two large-scale projects are ...
Voir le projet

 32

 TERMINÉ 
CommONEnergy focuses on existing shopping malls to be refurbished and buildings with a different original function, redesigned to become shopping malls. Wholesales&Retail buildings represent 28% of the total non-residential building stock (BPIE, 2010), accounting for approximately 157 Mtoe in 2005 (EU EEAP). Considering typical shopping malls high impact on modern society (ICSC, 2008), the project ...
Voir le projet

 23

 TERMINÉ 

Arrowhead (ARROWHEAD)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Voir le projet

 87

 TERMINÉ 
The DREAM project will lay the foundations for a novel heterarchical management approach of complex electrical power grids, providing new mechanisms for consumer involvement in economical and ecological electricity use as well as stable and cost effective integration of distributed renewable resources.Applying the principles of autonomous agent-based systems to the control and management of the el ...
Voir le projet

 15

 TERMINÉ 

Ideal Grid for All (IDE4L)

Date du début: 1 sept. 2013, Date de fin: 31 oct. 2016,

The IDE4L project will define, develop and demonstrate the entire system of distribution network automation, IT systems and applications for active network management. Active distribution networks will utilize distributed energy resources (DERs) for network management including both real time operation and long-term network planning viewpoints. DERs consist of aggregated distributed generation, de ...
Voir le projet

 13

 TERMINÉ 
To solve the energy dilemma, research effort was concentrated on stand-alone buildings weakly tight to their immediate environment. Specifically in each building only key sub-systems were considered individually. Such individual systems were made more effective by becoming pervasive into any building area (the reign of “boxes” and “controllers”). Importing parameters from other sub-systems allowed ...
Voir le projet

 18

 TERMINÉ 

Energy Efficient Converters using GaN Power Devices (E2COGAN)

Date du début: 1 avr. 2013, Date de fin: 31 mars 2016,

The E2COGaN project will target the demonstration of GaN-on-Si as a disruptive power device technology platform through the whole value chain up to demonstrators with high industrial, societal and environmental relevance. Its innovative character will be proven through a well-balanced and application specific trade-off between the “corner” benefits given by higher efficiency, higher switching freq ...
Voir le projet

 25

 TERMINÉ 
The aim of the “School of the Future” project is to design, demonstrate, evaluate and communicate shining examples of how to reach the future high performance building level. School buildings and their primary users pupils - the next generations - are in the focus of the project. Both, the energy and indoor environment performance of 4 demo buildings in 4 European countries and climates will be gr ...
Voir le projet

 14

 TERMINÉ 
Hospitals are known to be large energy consumers and in most European countries the high proportion of ageing building stocks makes hospitals amongst the least energy efficient public buildings. Nowadays there is a growing urgency to achieve real energy savings from existing building stocks and to build more sustainable new hospitals.The GREEN@Hospital project aims at integrating the latest ICT so ...
Voir le projet

 11

 TERMINÉ 
The European Sport and Recreation Building Stock accounts for approximately 1,5 Million buildings or 8% of the overall building stock. These facilities are unique by their physical nature, their energy consumption profiles, the usage patterns of people inside, ownership, and comfort requirements. SPORTE2 aims to manage and optimize the triple dimensions of energy flows (generation, grid exchange, ...
Voir le projet

 10

 TERMINÉ 
The overall objective of CitInES is to design and demonstrate a multi-scale multi-energy decision-making tool to optimise the energy efficiency of cities or large industrial complexes by enabling them to define sustainable, reliable and cost-effective long-term energy strategies. Demonstrations will take place in two cities in Italy, Cesena and Bologna, and in one oil refinery in Turkey, Tupras.In ...
Voir le projet

 13

 TERMINÉ 
ICT 4 E2B Forum is aimed at bringing together all relevant stakeholders involved in ICT systems and solutions for Energy Efficiency in Buildings, at identifying and reviewing the needs in terms of research and systems integration as well as at accelerating implementation and take-up.ICT 4 E2B Forum intends to promote, through community building activities, a better understanding, a closer dialogue ...
Voir le projet

 7

 TERMINÉ 

INTelligent Electrical Grid Sensor communications (INTEGRIS)

Date du début: 1 févr. 2010, Date de fin: 31 déc. 2012,

INTEGRIS project proposes the development of a novel and flexible ICT infrastructure based on a hybrid Power Line Communication-wireless integrated communications system able to completely and efficiently fulfill the communications requirements foreseen for the Smart Electricity Networks of the future.This includes encompassing applications such as monitoring, operation, customer integration, dema ...
Voir le projet

 9

 TERMINÉ 
More than 40% of the total energy consumed in the EU is used to cover the needs for heating, cooling and electricity of buildings. As the major part of this energy is produced from combustion of oil and natural gas, both the EU and the EU Building Sector are highly depended on imported fossil fuels. Moreover, the Sector is also a major contributor to Green-House Gas (GHG) emissions. To address iss ...
Voir le projet

 19