Rechercher des projets européens

27 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Safe Cooperating Cyber-Physical Systems using Wireless Communication (SafeCOP)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2019,

SafeCOP (Safe Cooperating Cyber-Physical Systems using Wireless Communication) will establish a safety assurance approach, a platform architecture, and tools for cost-efficient and practical certification of cooperating cyber-physical systems (CO-CPS).SafeCOP targets safety-related CO-CPS characterized by use of wireless communication, multiple stakeholders, dynamic system definitions, and unpredi ...
Voir le projet

 29

 TERMINÉ 

STREAMLINE

Date du début: 1 déc. 2015, Date de fin: 30 nov. 2018,

STREAMLINE will address the competitive advantage needs of European online media businesses (EOMB) by delivering fast reactive analytics suitable in solving a wide array of problems, including addressing customer retention, personalised recommendation, and more broadly targeted services. STREAMLINE will develop cross-sectorial analytics drawing on multi-source data originating from online media co ...
Voir le projet

 8

 TERMINÉ 

New Cost Efficient Business Models for Flexible Smart Grids (NOBEL GRID)

Date du début: 1 janv. 2015, Date de fin: 30 juin 2018,

NOBEL GRID will develop, deploy and evaluate advanced tools and ICT services for energy DSOs cooperatives and medium-size retailers, enabling active consumers involvement –i.e. new demand response schemas – and flexibility of the market – i.e. new business models for aggregators and ESCOs.Through the dual-use of telecommunication networks, and validating the integration of renewable generation pre ...
Voir le projet

 24

 TERMINÉ 

Allied Initiative for Training and Education in Coherent Optical Networks (ICONE)

Date du début: 1 févr. 2014, Date de fin: 31 janv. 2018,

This Initial Training Network project deals with training and education of engineers and researchers within the most advanced optical transmission systems, i.e. high capacity high constellation coherent systems using digital signal processing (DSP). Currently,systems with a total capacity of about 100 Gbit/s are under commercial test/installation in the core network around the Globe. The next gen ...
Voir le projet

 12

 TERMINÉ 

Application Centric IP/Optical Network Orchestration (ACINO)

Date du début: 1 févr. 2015, Date de fin: 31 janv. 2018,

The Internet has evolved into a three layer structure: at the top layer sit the applications generating traffic that is groomed at the IP and/or OTN layers and finally transported at the optical layer. Specific application needs, such as latency or protection requirements, are seldom guaranteed, because they are usually implicit and even when they are not, the need of the grooming layer to map lar ...
Voir le projet

 6

 TERMINÉ 
The exponential growth of mobile traffic, drastically increasing of network complexity, and the strong need for inter-network coordination of wireless network resources call for breakthroughs in control, coordination and flexible spectrum management in 5G heterogeneous radio access networks. The COHERENT project aims to address these problems by researching, developing and validating a novel cont ...
Voir le projet

 14

 TERMINÉ 

Nanometrology Standardization Methods for Magnetic Nanoparticles (NANOMAG)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2017,

The NanoMag project is to improve and redefine existing analyzing methods and in some cases, to develop new analyzing methods for magnetic nanostructures. Using improved manufacturing technologies we will synthesize magnetic nanoparticles with specific properties that will be analyzed with a multitude of characterization techniques (focusing on both structural as well as magnetic properties) and b ...
Voir le projet

 18

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 

Zero Emission bUs Systems (ZEEUS)

Date du début: 1 nov. 2013, Date de fin: 30 avr. 2017,

Electrification of the public transport is a raising trend in Europe, and electric buses are soon expected to enter markets as one of the most interesting options for matching urban environmental targets. Electrification is driven by both economics and politics. However, although technology is not yet fully matured and ready for wide commercialisation, a large demonstration project will facilitat ...
Voir le projet

 41

 TERMINÉ 
The goal of PROEIPAHA CSA is to help addressing the challenges identified by the stakeholders and the expert’s group report, by providing a wide range of high quality support services for the EIPAHA, from secretariat services, R&I facilitation, policy guidance, awareness and stakeholder’s engagement support, fostering open and sustainable collaboration. In order to pursue this goal, the project ad ...
Voir le projet

 16

 TERMINÉ 
SAFEWATER will develop an affordable global generic solution for the detection and management of drinking water crises resulting from CBRN contamination. SAFEWATER addresses the key drinking water incident management challenges at large, and in particular, the current shortcomings related to the contamination of water networks by CBRN agents - the lack of effective detection capacities, contaminat ...
Voir le projet

 11

 TERMINÉ 

Portable and Predictable Performance on Heterogeneous Embedded Manycores (PaPP)

Date du début: 1 sept. 2012, Date de fin: 31 oct. 2015,

Modern advanced products of today use embedded computing systems with exacting requirements on execution speed, timeliness, and power consumption. It is a grand challenge to guarantee these requirements across product families and in the face of rapid technological evolution, as current development practices cannot manage performance requirements the same way they manage functional requirements.Ev ...
Voir le projet

 20

 TERMINÉ 

eXperimental Infrastructures for the Future Internet (XIFI)

Date du début: 1 avr. 2013, Date de fin: 30 sept. 2015,

XIFI will establish a sustainable marketplace for trial infrastructures and Future Internet services.XIFI will achieve this vision by integrating and federating a multiplicity of heterogeneous environments – starting from the generic and specific enablers provided by the FI-WARE core platform and the FI-PPP use cases and early trials.Through this approach XIFI will demonstrate and validate the pot ...
Voir le projet

 38

 TERMINÉ 

Future Internet Social and Technological Alignment Research (FI-STAR)

Date du début: 1 avr. 2013, Date de fin: 30 sept. 2015,

FI-STAR will establish early trials in the Health Care domain building on Future Internet (FI) technology leveraging on the outcomes of FI-PPP Phase 1. It will become self-sufficient after the end of the project and will continue on a sustainable business model by several partners. In order to meet the requirements of a global Health industry FI-STAR will use a fundamentally different, "reverse" c ...
Voir le projet

 44

 TERMINÉ 

Wireless Insole for Independent and Safe Elderly Living (WIISEL)

Date du début: 1 nov. 2011, Date de fin: 31 mars 2015,

Description WIISEL's main goal is to develop an unobtrusive, self-learning and wearable prevention and warning system to decrease the incidence of falls in the elderly population.The idea is that elderly people put a specifically designed insole in their shoes, which monitors their walking pattern. This way the system may detect changes in g ...
Voir le projet

 10

 TERMINÉ 
The project CHARMING aims at developing compact and fully fibred visible lasers for fluorescencespectroscopy, high resolution confocal microscopy and tryptophan imaging. These applications requirepulsed operation (about 100 ps at repetition rates from 1 to 80 MHz), various wavelengths in the visible(from 515 to 630 nm typically) and in the UV (for tryptophan imaging), high average power (up to 500 ...
Voir le projet

 7

 TERMINÉ 

New embedded Systems arcHItecturE for multi-Layer Dependable solutions (nSHIELD)

Date du début: 1 sept. 2011, Date de fin: 31 déc. 2014,

The nSHIELD project is, at the same time, a complement and an improvement of “pSHIELD”, a pilot project funded in ARTEMIS Call 2009 as the first investigation to build the SHIELD Architectural Framework for SPD. The roadmap proposed in this pilot project aims at addressing Security, Privacy and Dependability (SPD) in the context of Embedded Systems (ESs) as “built in” rather than as “add-on” funct ...
Voir le projet

 24

 TERMINÉ 

EXPERiments in live social and networked MEDIA experiences (EXPERIMEDIA)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2014,

Offering collective and participative experiences to real-world and online communities is at the heart of the Future Media Internet (FMI) and will form an essential part of entertainment, education, collaborative working, product and service innovation and advertising. Communities involved potentially include hundreds of professionals, tens of thousands at live public events and millions online. C ...
Voir le projet

 25

 TERMINÉ 

Commercialization Clusters of OLAE (COLAE)

Date du début: 1 sept. 2011, Date de fin: 31 août 2014,

The main objective of this coordinated action is to promote the commercial exploitation of OLAE (organic and large-area electronics) technology for the benefit of European industry and business and for the welfare of European countries. Through the efforts of COLAE we will be able to provide to European companies effective access to the knowledge base and technology know-how of key European OLAE ...
Voir le projet

 21

 TERMINÉ 

Total Airport Security System (TASS)

Date du début: 1 avr. 2010, Date de fin: 31 mars 2014,

"TASS is a multi-segment, multi-level intelligence and surveillance system, aimed at creating an entire airport security monitoring solution providing real-time accurate situational awareness to airport authorities.The TASS concept is based on integrating different types of selected real time sensors & sub-systems for data collection in a variety of modes, including fixed and mobile, all suitable ...
Voir le projet

 22

 TERMINÉ 
"Air traffic in Europe is expected to double by 2025 according to the last forecast of Eurocontrol. Future passenger and freight fleets will bring better efficiency and improved environmental performance, and will allow people to benefit from the connections that only air transport can deliver. In this context, an integrated aircraft communication system is of paramount importance to improve effic ...
Voir le projet

 34

 TERMINÉ 

Format-Agnostic SCript-based INterAcTive Experience (FascinatE)

Date du début: 1 févr. 2010, Date de fin: 31 juil. 2013,

FascinatE will create an innovative end-to-end system and associated standards for future immersive and interactive TV services. It will allow users to navigate around an ultra-high resolution video panorama, showing a live or recorded event, with matching accompanying audio. The output will be adapted to their particular device, covering anything from a mobile handset to an immersive panoramic di ...
Voir le projet

 11

 TERMINÉ 

Enhancing Printed Electronics Applications by SMEs (CLIP)

Date du début: 1 juin 2010, Date de fin: 31 mai 2013,

The project will focus on three development aims: 1) development, formulation and feasibility assessment of several lower-cost alternatives for Silver nanoparticle based conductive inks 2) for these lower-cost inks finding alternatives for conventional screen printing, which allow digital printing combined with high resolution printing and enable contactless printing, which improves quality and re ...
Voir le projet

 18

 TERMINÉ 

SAIL: Scalable & Adaptive Internet soLutions (SAIL)

Date du début: 1 août 2010, Date de fin: 28 févr. 2013,

SAIL's objective is the research and development of novel networking technologies using proof-of-concept prototypes to lead the way from current networks to the Network of the Future.SAIL leverages state of the art architectures and technologies, extends them as needed, and integrates them using experimentally-driven research, producing interoperable prototypes to demonstrate utility for a set of ...
Voir le projet

 26

 TERMINÉ 

Neighbourhood Oriented Brokerage ELectricity and monitoring system (NOBEL)

Date du début: 1 févr. 2010, Date de fin: 31 déc. 2012,

Europe and the rest of the world share common goals towards energy efficiency and sustainability. European leaders committed themselves to reduce primary energy consumption by 20% compared to projections for 2020. Energy efficiency is the most cost-effective way of achieving such goal. Furthermore, improving energy efficiency also addresses the key energy challenges of climate change, energy secur ...
Voir le projet

 8

 TERMINÉ 

Cooperating Objects NETwork of excellence (CONET)

Date du début: 1 juin 2008, Date de fin: 30 nov. 2012,

A number of different system concepts have gained a lot of relevance in the area of embedded systems over the past couple of years: Embedded systems, pervasive computing and wireless sensor networks. These three types of quite diverse systems share a lot of commonalities but also have some complementary aspects in common that make a combination into a coherent system vision promising.The term "Coo ...
Voir le projet

 18

 TERMINÉ 
"Protecting its citizens from terrorism remains a high priority for the EC. Current SOA security procedures for air travel have significantly improved airport security. The need is now to protect the softer, unprotected areas such as mass transportation systems and hubs which are being targeted with devastating effect (London, Madrid). They are largely unprotected since current security systems ar ...
Voir le projet

 10