Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Strength2Food is a 5-year, €6.9 million project to improve the effectiveness of EU food quality schemes (FQS), public sector food procurement (PSFP) and to stimulate Short Food Supply Chains (SFSC) through research, innovation and demonstration activities. Our 30-partner consortium representing 11 EU and 4 non-EU countries combines leading academic, communication, SME and stakeholder organisations ...
Voir le projet

 31

 TERMINÉ 

Advancing Performing Arts Project - Performing Europe 2020

Date du début: 1 juin 2016, Date de fin: 31 mai 2020,

APAP– Performing Europe 2020 links 11 leading performing arts organisations from 10 different European countries, and 35 of the most innovative performing artists. The network will support artistic production, create new models of audience development, introduce a new database for the arts world and build a bridge to the Arab world. The program contains:1. Creating an innovative and visible artist ...
Voir le projet

 11

 TERMINÉ 

Fast Assay for Pathogen Identification and Characterisation (FAPIC)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2020,

The emergence of highly diverse resistance mechanisms among pathogens requires their detailed analysis to guarantee an efficient medical treatment. The gold standard in clinical diagnostics is based on the cultivation of bacteria and their phenotypical characterisation. However, these methods are labour-intensive and time-consuming lasting in some cases up to a few weeks. Thus, faster diagnostic t ...
Voir le projet

 12

 TERMINÉ 
"As clearly stated in report no. 10/2014 "Noise in Europe 2014" by the European Environment Agency, noise pollution is a major environmental health problem in Europe, yet the lack of comparable common assessment methods causes significant inconsistencies in exposure estimates of people affected by noise. However, in the past few years building acoustics has been influenced by evolution issues in t ...
Voir le projet

 7

 TERMINÉ 
The European market for e-commerce is growing rapidly, with more than 16% just in the year 2014. With the internationalization of distribution chains, the key for success lies within efficient logistics. In such facilities, goods for the end-user or products in the B2B sector are stored, commissioned and shipped. To manage the supply chains, many new warehouses have been erected and more will foll ...
Voir le projet

 6

 TERMINÉ 
CRISS is a user-driven, flexible, scalable and cost-effective cloud-based digital learning ecosystem that allows the guided acquisition, evaluation and certification of digital competences in primary and secondary education, and easily scalable to other educational levels. CRISS proposes an innovative adaptive learning solution supported by the most advanced pedagogical methodologies and technolog ...
Voir le projet

 14

 TERMINÉ 

People for tHe eurOpean bioENergy mIX (Phoenix)

Date du début: 1 déc. 2015, Date de fin: 30 nov. 2019,

The development and adoption of renewable and sustainable forms of energy has become a major priority for Europe and is an important theme in H2020. Research into new, energy-related technologies to reduce Europe’s reliance on non-renewable fossil fuels is a critical need, and requires more newly qualified people in areas such as renewable-energy infrastructure management, new energy materials and ...
Voir le projet

 15

 TERMINÉ 

BIOengineered grafts for Cartilage Healing In Patients (BIO-CHIP) (BIO-CHIP)

Date du début: 1 nov. 2015, Date de fin: 31 oct. 2019,

Spontaneous healing of articular cartilage injuries is poor and untreated defects predispose to osteoarthritis. Current therapies, including innovative autologous cell-based treatments, cannot predictably and reproducibly restore cartilage structure and function. BIOCHIP will carry out a multicenter, prospective phase II clinical trial to treat knee cartilage injuries using engineered grafts based ...
Voir le projet

 9

 TERMINÉ 
The overall aim of JPsustaiND is to support the development and extension of the capacities of the EU Joint Programming Initiative on Neurodegenerative Diseases, in particular Alzheimer's (JPND). Since 2009 JPND has been operating on a very light management structure based on a simple Terms of Reference. Through this JPND has been able to set a common Strategic Research Agenda, and to deliver its ...
Voir le projet

 16

 TERMINÉ 
A Spatial Data Infrastructure (SDI) is a framework to share and re-use spatial data amongst public authorities, private sector and citizens. SDI are based on a series of agreements on technology standards, institutional settings and policies to unlock geospatial resources for a wide range of applications: e.g. environmental monitoring, transportation planning, health care, urban planning, etc. Sin ...
Voir le projet

 16

 TERMINÉ 
The GoSAFE RAIL project will be transformative for asset safety in the rail sector. It will bring together inter-disciplinary experts from Risk based asset assessment of infrastructure, Artificial Intelligence (AI), object detection and data management sectors with leaders in network micro-simulation modelling to deliver a Decision Support Tool that will allow a step change for infrastructure safe ...
Voir le projet

 10

 TERMINÉ 
Public bodies face the lack of appropriate easy-to-use tools to support them in the definition, simulation and evaluation of suitable strategies for sustainable heating and cooling tailored to local conditions for achieving the ambitious targets set-up in their local plans. In light of this, PLANHEAT main objective is to develop and demonstrate an integrated and easy-to-use tool which will support ...
Voir le projet

 13

 TERMINÉ 

Educational Lab - Big Machine

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

Civil Engineering is a field that is proving to be particularly sensitive to the dynamics of the labour market. It has become noticeably less popular in countries such as Portugal, Greece, Croatia (and other European Countries) where employment levels for Civil Engineers have dropped significantly. This is a very problematic context as Civil Engineering is present in everyday life and is indeed a ...
Voir le projet

 3

 TERMINÉ 

Exploring the Field of Interaction in Architectural Design Education

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

Architecture as an education needs to strengthen its knowledge-transfer infrastructure and breed an interactive flexible learning environment to absorb ever-changing needs and objectives of the professional/research sides of the field of architecture, and find ways to steer the poles of the knowledge triangle (research/education/profession) to enhance the innovation potential of European education ...
Voir le projet

 7

 TERMINÉ 

Mathematics Education - Relevant, Interesting and Applicable

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

Mathematics education is a very important factor influencing individual's life chances. People with unsatisfactory mathematics skills often meet severe limitations in their choices at the job market in technology-rich society. Therefore mathematics school education for all citizens is recognized as the field to be promoted across Europe. The needs of diverse population of pupils in secondary scho ...
Voir le projet

 11

 TERMINÉ 

EU Law and Gender: Making Equality Effective

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

The overall aim of the JM module EU Law and Gender: Making Equality Effective is to mainstream higher and expert education in the area of EU law on gender equality in the form of seminars, lectures and the currently underdeveloped e-learning concept. The specific aim of the module is to expand the traditional core subjects at the Zagreb Faculty of Law concerning the construction of the legal syste ...
Voir le projet

 1

 TERMINÉ 

DigiLing: Trans-European e-Learning Hub for Digital Linguistics

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

DigiLing will create a transnational e-learning hub for Digital Linguistics containing online core modules covering the essential skills and competencies as identified through the labour market survey. Digital Linguistics is a new interdisciplinary field which develops knowledge and skills for understanding, processing and exploiting language content in the digital era. Currently no European unive ...
Voir le projet

 6

 TERMINÉ 
Background Conflicts between humans and brown bear (Ursus arctos) populations in Slovenia remain an ongoing threat to the conservation status of bears and steps must be taken to improve coexistence. Measures need to tackle such challenges as a lack of understanding of bears’ socio-economic and environmental value, inflated estimations of the risk of bea ...
Voir le projet

 9

 TERMINÉ 

Inclusive Cultural Heritage in Europe through 3D semantic modelling (INCEPTION)

Date du début: 1 juin 2015, Date de fin: 31 mai 2019,

INCEPTION realises innovation in 3D modelling of cultural heritage through an inclusive approach for time-dynamic 3D reconstruction of artefacts, built and social environments. It enriches the European identity through understanding of how European cultural heritage continuously evolves over long periods of time. INCEPTION’s Inclusive approach comprises: time dynamics of 3D reconstruction (‘foreve ...
Voir le projet

 14

 TERMINÉ 
Research and development activities are proposed for the benefit of sustainable pork chains based on European local pig breeds and their production systems. Workprogramme is planned to respond to consumer demands for quality and healthiness of pork products with regional identity and societal demands for environment preservation and development of local agro-economy. Description and evaluation of ...
Voir le projet

 25

 TERMINÉ 
subCULTron aims for achieving long-term autonomy in a learning, self-regulating, self-sustaining underwater society/culture of robots in a high-impact application area: Venice, Italy. Our heterogeneous system consists of 3 different agent types: On the sea-ground, artificial mussels are the collective long-term memory of the system, allowing information to stay beyond the runtime of other agents, ...
Voir le projet

 8

 TERMINÉ 

ERC = ScienceSquared (ScienceSquared)

Date du début: 1 oct. 2015, Date de fin: 31 mars 2019,

The ERC is a great success scientifically, and now wants to broaden its popular and political support. But it has a problem: Most EU citizens don’t care about some Brussels agency they never heard of. The solution is in the ERC’s mandate: frontier research. It has science – the cutting edge variety, that can capture the imagination, change the world and stimulate curiosity. We have seen the power ...
Voir le projet

 8

 TERMINÉ 
The project entitled Building Bridges: Promoting Social Inclusion and Wellbeing for Families of Children with Special Needs (PSI_WELL) proposes an innovative approach aimed to facilitate social inclusion and wellbeing for families confronting with disabled children through adult education for parents. The project is addressing to the specific needs of families parenting children with special needs ...
Voir le projet

 6

 TERMINÉ 
In Europe, there is a clear long-term objective to decarbonize the energy system, but it is very unclear how this will be achieved in the heating and cooling sector. As a result, there is currently a lot of uncertainty among policymakers and investors in the heating and cooling sector, primarily due to a lack of knowledge about the long-term changes that will occur in the coming decades. This HRE ...
Voir le projet

 16

 TERMINÉ 
Most European Lifelong Learning (LLL) policies have been designed to create economic growth and, at the same time, guarantee social inclusion (EC 2010). First, we will study how different LLL policies are compatible with each other in terms of their orientations and objectives and how each policy considers the needs of ‘young adults’. Second, we will research the intended and unintended effects of ...
Voir le projet

 15

 TERMINÉ 
Traditional valorisation approaches focus on linear processes: from academia to society. In order to bring valorisation to a higher level, all relevant actors need to cooperate in an equal setting: co-creation. Co-creation transcends boundaries, but it does not happen naturally. Therefore, the ACCOMPLISSH consortium, consisting of 14 universities from 12 countries (representing all the sub discipl ...
Voir le projet

 15

 TERMINÉ 

Minerals Policy Guidance for Europe (MIN-GUIDE)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2019,

MIN-GUIDE is a project addressing the need for a secure and sustainable supply of minerals in Europe by developing a ‘Minerals Policy Guide’. The key objectives of the project are (1) providing guidance for EU and MS minerals policy, (2) facilitating minerals policy decision making through knowledge co-production for transferability of best practice minerals policy, and (3) fostering community and ...
Voir le projet

 11

 TERMINÉ 
This project is an innovative opportunity to mend several gaps in the research capacity in Croatia in Archaeology, Genetics, and other ‘Sciences of the Past’ by twinning a consortium of Croatian researchers (CrEAMA Initiative) with archaeological scientists from the University of Cambridge (UCAM) and the University of Pisa (UP). The project exploits location-specific advantages that arise from two ...
Voir le projet

 8

 TERMINÉ 
Water and water-related services are major components of the human wellbeing, and as such are major factors of socio-economic development in Europe; yet freshwater systems are under threat by a variety of stressors (organic and inorganic pollution, geomorphological alterations, land cover change, water abstraction, invasive species and pathogens. Some stressors, such as water scarcity, can be a st ...
Voir le projet

 27

 TERMINÉ 

Intelligent Bridge Assessment Maintenance and Management System (BRIDGE SMS)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2018,

Government agencies, the public and private sectors and professional engineering sectors across Europe need to come together and proactively meet the challenge of creating a climate resilient infrastructure system. Managing National Infrastructure requires collaboration, planning and sharing of information between multiple sectors. This will reduce the risk of economic disruption to Europe and ena ...
Voir le projet

 6

 TERMINÉ 

Symbiosis of smart objects across IoT environments (symbIoTe)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

Connected smart objects have invaded our everyday life across multiple domains, e.g. home withautomation solutions, assisted living with sensors and wearables to monitor personal activities, smart transportation and environmental monitoring. IoT is evolving around a plethora of vertically isolated platforms, each specifically suited to given scenarios and often adopting non-standard, sometimes ful ...
Voir le projet

 14

 TERMINÉ 

Excelling LABUST in marine robotics (EXCELLABUST)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

Laboratory for Underwater Systems and Technologies (LABUST) at the University of Zagreb Faculty of Electrical and Engineering (UNIZG-FER) in Croatia positioned itself in the last years as the regional leader in marine robotics: LABUST has the required technologies, people, infrastructure, and experience in field experiments. What LABUST is missing is research excellence that will allow it to fully ...
Voir le projet

 4

 TERMINÉ 
"The objective of CoolHeating is to support the implementation of "small modular renewable heating and cooling grids" for communities in South-Eastern Europe. This will be achieved through knowledge transfer and mutual activities of partners in countries where renewable district heating and cooling examples exist (Austria, Denmark, Germany) and in countries which have less development (Croatia, Sl ...
Voir le projet

 11

 TERMINÉ 

Recognition of Valid and Open Learning

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2018,

The project "ReOPEN - Recognition of Valid and Open Learning" re-opens discussion on recognition of prior and non-formal learning results in formal education and by employer organizations. The discussion is re-opened in the new context - digital and online open learning (OOL) - changing the landscape of education since the past years. Digital transformation of education and training systems, digit ...
Voir le projet

 6

 TERMINÉ 
Soil and land degradation refers to all process(es) by which soil declines in quality and is thus made less fit for a specific purpose, such the crop production. Education will play a crucial role in the land degradation protection. This involves an opportunity and implies rethinking and reorganizing higher education institutions (HEIs) to become effective change agents in terms of learning out ...
Voir le projet

 12

 TERMINÉ 
The project idea is based on the observation that the state of the healthcare system in Kyrgyzstan is suboptimal and education regarding the operation of advanced medical equipment (such as diagnostic devices) is poor. Even the Kyrgyz Ministry of Healthcare admits that expensive medical equipment located at public hospitals cannot be operated because personnel (medical doctors and technical staff) ...
Voir le projet

 10

 TERMINÉ 

Entrepreneurial Universities for Industry Alliances

Date du début: 15 oct. 2015, Date de fin: 14 oct. 2018,

This project aims to develop links between universities and enterprises in order to enhance teaching and learning, upgrade the curricula in line with the needs of enterprises and improve the financial sustainability of HEIs in Kosovo.Enterprise managers will be appointed to university committees as the voice of the private sector to help universities design programmes of study in line with the nee ...
Voir le projet

 17

 TERMINÉ 

MANGO: exploring Manycore Architectures for Next-GeneratiOn HPC systems (MANGO)

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2018,

MANGO targets to achieve extreme resource efficiency in future QoS-sensitive HPC through ambitious cross-boundary architecture exploration for performance/power/predictability (PPP) based on the definition of new-generation high-performance, power-efficient, heterogeneous architectures with native mechanisms for isolation and quality-of-service, and an innovative two-phase passive cooling system. ...
Voir le projet

 9

 TERMINÉ 

ODYSSEUS-MONNET NETWORK ON IMMIGRATION AND ASYLUM

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

The main rationale of the project is to forge, throughout the Member States, a European community of researchers and professors in the field of EU immigration and asylum who, despite the existing important cooperation and personal links, do not benefit from a consistent enough framework at EU level. Establishing “the place to be” virtually or physically sometimes per year to meet, exchange and net ...
Voir le projet

 22

 TERMINÉ 

Knowledge Platform for Transferring Research and Innovation in Footwear Manufacturing

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

Knowledge 4Foot (K4F) project aims to contribute at fostering the excellence in training for footwear manufacturing by linking the three areas of education, research and business oriented innovation in order to demonstrate good practices of cooperation and to bridge the worlds of education and work. In order to achieve this aim, the project has following objectives: 1) to set-up a new Knowledge P ...
Voir le projet

 9