Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Internet of Food and Farm 2020 (IoF2020)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

The IoF2020 project is dedicated to accelerate adoption of IoT for securing sufficient, safe and healthy food and to strengthen competitiveness of farming and food chains in Europe.It will consolidate Europe’s leading position in the global IoT industry by fostering a symbiotic ecosystem of farmers, food industry, technology providers and research institutes.The IoF2020 consortium of 73 partners, ...
Voir le projet

 72

 TERMINÉ 
Silicon carbide presents a high breakdown field (2-4 MV/cm) and a high energy band gap (2.3–3.2 eV), largely higher than for silicon. Within this frame, the cubic polytype of SiC (3C-SiC) is the only one that can be grown on a host substrate with the huge opportunity to grow only the silicon carbide thickness required for the targeted application. The possible growth on silicon substrate has remai ...
Voir le projet

 14

 TERMINÉ 

Hybrid Optomechanical Technologies (HOT)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

The hybrid optomechanical technologies (HOT) consortium will lay the foundation for a new generation of devices, which connect, or indeed contain, several platforms at the nanoscale in a single “hybrid” system. As hybrid interfaces they will allow to harness the unique advantages of each subsystem within a nano-scale footprint, while as integrated hybrid devices they will enable entirely novel fun ...
Voir le projet

 17

 TERMINÉ 

ACTivating InnoVative IoT smart living environments for AGEing well (ACTIVAGE)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2020,

ACTIVAGE is a European Multi Centric Large Scale Pilot on Smart Living Environments. The main objective is to build the first European IoT ecosystem across 9 Deployment Sites (DS) in seven European countries, reusing and scaling up underlying open and proprietary IoT platforms, technologies and standards, and integrating new interfaces needed to provide interoperability across these heterogeneous ...
Voir le projet

 50

 TERMINÉ 

Deep sub-micron microprocessor for spAce rad-Hard appLIcation Asic (DAHLIA)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

We propose the development of a Very High Performance microprocessor System on Chip (SoC) based on STM European 28nm FDSOI technology with multi-core ARM processors for real-time applications, eFPGA for flexibility and key European IPs, enabling faster and cost-efficient development of products for multiple space application domains. The performance is expected to be 20 to 40 times the performance ...
Voir le projet

 7

 TERMINÉ 

AUTOmated driving Progressed by Internet Of Things (AUTOPILOT)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

"Automated driving is expected to increase safety, provide more comfort and create many new business opportunities for mobility services. The market size is expected to grow gradually reaching 50% of the market in 2035. The IoT is about enabling connections between objects or "things"; it’s about connecting anything, anytime, anyplace, using any service over any network. There is little doubt that ...
Voir le projet

 43

 TERMINÉ 

Energy for Smart Objects (EnSO)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

The goal of EnSO is to develop and consolidate a unique European ecosystem in the field of autonomous micro energy sources (AMES) supporting Electronic European industry to develop innovative products, in particular in IoT markets. In summary, EnSO multi-KET objectives are:• Objective 1: demonstrate the competitiveness of EnSO energy solutions of the targeted Smart Society, Smart Health, and Smart ...
Voir le projet

 36

 TERMINÉ 

Integrated Smart Spatial Exploration System (INSPEX)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

"The objective of INSPEX is to make obstacle detection capabilities that are currently only feasible on autonomous vehicles available as a personal portable/wearable multi-sensor, miniaturised, low power spatial exploration system. The INSPEX System will be used for real-time 3D detection, location and warning of obstacles under all environmental conditions in indoor and outdoor environments with ...
Voir le projet

 9

 TERMINÉ 

Rf Engineered substrates to FostER fEm performaNCE (REFERENCE)

Date du début: 1 déc. 2015, Date de fin: 31 mai 2019,

The REFERENCE project aims to leverage a European leading edge Radio Frequency (RF) ecosystem based on RF Silicon On Insulator (SOI) disruptive technology, perceived as the most promising to address performance, cost and integration needs for RF Front End Modules (FEMs)s.The project targets to develop over the next 3 years, innovative solutions from material, engineered substrates, process, design ...
Voir le projet

 18

 TERMINÉ 

Advancing Smart Optical Imaging and Sensing for Health (ASTONISH)

Date du début: 1 juin 2016, Date de fin: 31 mai 2019,

The ageing population and related increase in chronic diseases put considerable pressure on both the healthcare system and the society, resulting in an unsustainable rise of healthcare costs. As a result there is an urgent need to improve efficiency of care and reduce hospitalisation time in order to control cost and increase quality of life. Addressing this need, medical applications need to beco ...
Voir le projet

 25

 TERMINÉ 

3D Advanced Metrology and materials for advanced devices (3DAM)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2019,

The objective of the 3DAM project is to develop a new generation of metrology and characterization tools and methodologies enabling the development of the next semiconductor technology nodes. As nano-electronics technology is moving beyond the boundaries of (strained) silicon in planar or finFETs, new 3D device architectures and new materials bring major metrology and characterization challenges w ...
Voir le projet

 18

 TERMINÉ 

Ultra-Low PoweR technologIes and MEmory architectures for IoT (PRIME)

Date du début: 1 déc. 2015, Date de fin: 31 mars 2019,

The goal of the PRIME project is to establish an open Ultra Low Power (ULP) Technology Platform containing all necessary design and architecture blocks and components which could enable the European industry to increase and strengthen their competitive and leading eco-system and benefit from market opportunities created by the Internet of Things (IoT) revolution. Over 3 years the project will deve ...
Voir le projet

 19

 TERMINÉ 
The overall objective of STREAMS is to develop the necessary Silicon Photonics Transceiver and Routing technologies towards a new, power efficient, WDM-based, Tb/s, optical on-board interconnection paradigm that enables multiple high bandwidth, point-to-point direct links on the board level, as a step forward to the realization of exa-scale computing systems. Through the migration of successful WD ...
Voir le projet

 10

 TERMINÉ 

Action Plan for the future of Mobility in Europe (MOBILITY4EU)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

Global socio-economic and environmental megatrends are urging for a paradigm shift in mobility and transport that involves disruptive technologies and multimodal solutions. The individual transport sectors face diverse technical and non-technical requirements and rather individual, sometimes contradicting challenges. An action plan for the coherent implementation of innovative transport and mobili ...
Voir le projet

 20

 TERMINÉ 
We propose to fabricate a chip implementing a neuromorphic architecture that supports state-of-the-art machine learning algorithms and spike-based learning mechanisms. With respect to its physical architecture this chip will feature an ultra low power, scalable and highly configurable neural architecture that will deliver a gain of a factor 50x in power consumption on selected applications compare ...
Voir le projet

 10

 TERMINÉ 

Validation of European high capacity rad-hard FPGA and software tools (VEGAS)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

VEGAS proposes to address the key challenge of European non-dependence and competitivness regarding rad-hard FPGA for space applications. VEGAS will evaluate (following ESCC rules) and validate the first rad-hard FPGA in 65nm to directly compete with the US offering and reach TRL 7. The VEGAS project sets clear and measurable main objectives to reach a TRL 7 from TRL 5 (end of BRAVE project) as fo ...
Voir le projet

 11

 TERMINÉ 
REMINDER aims to develop an embedded DRAM solution optimized for ultra-low-power consumption and variability immunity, specifically focused on Internet of Things cut-edge devices. The objectives of REMINDER are :i) Investigation (concept, design, characterization, simulation, modelling), selection and optimization of a Floating-Body memory bit cell in terms of low power and low voltage, high relia ...
Voir le projet

 9

 TERMINÉ 
The aim of STREAMS is to bring Europe into the new leading thermal management paradigm and maintain EU position at the forefront of ICT development. With a focused consortium gathering complementary experts, STREAMS will develop a generic active cooling thermal management solution (reaching TRL4), to keep nanoelectronic devices and systems performances at their best, while meeting IC future challe ...
Voir le projet

 7

 TERMINÉ 
Understanding properties of nanoparticles (and in general of nano-functionalized materials) and how they behave in living systems is a relatively new area of scientific study. The scientific community has not yet been able to derive harmful properties of nanomaterials from the properties of the bulk material. So a precautionary approach is required when handling and using these materials in circum ...
Voir le projet

 15

 TERMINÉ 
...-Centers around a strong vision: mass commercialization of Si-photonics-based transceivers is possible starting in 2019 by enhancing the existing photonic integration platform of one of the partners, STMicroelectronics.COSMICC will develop optical transceivers that will be packaged on-board. Combining CMOS electronics and Si-photonics with innovative-high-throughput fiber-attachment techniques, th ...
Voir le projet

 11

 TERMINÉ 

High density scalable optically interconnected Tb/s Board (Teraboard)

Date du début: 1 déc. 2015, Date de fin: 30 nov. 2018,

Optical communications are becoming always more relevant because of the continuous growth of the requiested bandwidth. In the last decade we assisted a continuous growing of transport and metro netwotks, presently the bottleneck is in the processing of the huge amount of data constituted by the growing number of users, the capacity of the content that is exchanged and the convergence of Telecom an ...
Voir le projet

 10

 TERMINÉ 
OPERA project aims at supporting these ambitious challenges with technological innovation on three main aspects: • Design next generation Low Power (LP) and Ultra-Low Power (ULP) systems, • improve energy efficiency in computing by means of heterogeneous architectures, • and provide smart and energy efficient solution for the interaction between embedded smart systems and remote small form-factor ...
Voir le projet

 11

 TERMINÉ 

EXMO 2016: Let’s Experience Mobility

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2018,

The project “EXMO 2016 – Let’s experience mobility” is submitted by the Secondary Education Institute “Garfagnana” (http://www.isigarfagnana.gov.it/),. The Institute was created on September 1st, 2013 and brought together four existing secondary schools located in Castelnuovo: the VET institute (IPSIA) “Simoni”, the Institute for commerce, accountancy and surveying (ITCG) “Campedelli”, the Technic ...
Voir le projet

 23

 TERMINÉ 

Iniciativas Transnacionais para AcTivar o meio rural

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2018,

The requirement to which it is addressed the mobility concern the acquisition by students of specialist knowledge and skills related to the following areas: - Restoration technician, variant Kitchen / Confectionery- Technical Management and Programming Information Systems- Technical Agricultural Production, variant of Plant Production- Industrial Maintenance Technician - Electromechanical- Techni ...
Voir le projet

 24

 TERMINÉ 

Energy-efficient Heterogeneous COmputing at exaSCALE (ECOSCALE)

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2018,

In order to reach exascale performance current HPC servers need to be improved. Simple scaling is not a feasible solution due to the increasing utility costs and power consumption limitations. Apart from improvements in implementation technology, what is needed is to refine the HPC application development as well as the architecture of the future HPC systems.ECOSCALE tackles this challenge by pro ...
Voir le projet

 8

 TERMINÉ 

Bridging the Gap: world of school-world of work

Date du début: 19 sept. 2016, Date de fin: 18 sept. 2018,

The project plays an important role in the acquisition of technical and professional skills. It allows the participants to acquire hard and soft skills as well as personal and linguistic skills that provide the young trainees with a professional and initiative knowledge that they can practise on both a local and international level. Within the mobility activities, the project plans to involve 25 ...
Voir le projet

 26

 TERMINÉ 

FOREnsic evidence gathering autonomous seNSOR (FORENSOR)

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

Covert evidence gathering has not seen major changes in decades. Law enforcement Agencies (LEAs) are still using conventional, manpower based techniques to gather forensic evidence. Concealed surveillance devices can provide irrefutable evidences, but current video surveillance systems are usually bulky and complicated, are often used as simple video recorders, and require complex, expensive infra ...
Voir le projet

 11

 TERMINÉ 

Next Station: Improving Professional Skills in Galicia

Date du début: 4 juil. 2016, Date de fin: 3 juil. 2018,

General Management of Education, Vocational Training and Educational Innovation in Council of Culture and Education in Galicia is in Santiago de Compostela and manages 205 schools with Vocational Training and 1204 schools in Galicia.Educational adviser and international program coordinator promotes and coordinates european projects with 19 Vocational Training schools with their international coor ...
Voir le projet

 38

 TERMINÉ 

Preparing R2 extension to 300mm for BCD Smart Power (R2POWER300)

Date du début: 1 juil. 2015, Date de fin: 30 juin 2018,

R2POWER300 is committed to challenge the following Objectives: • Development and manufacturing of a multi-KET Pilot Line (i.e. Nanoelectronics, Nanotechnology, Advanced Manufacturing) • Energy Efficiency and CO2 Reduction megatrends.The project aims to achieve the following Goals:1. Set the stage for the future extension to 300mm of the R2 Fab facility located in Agrate Brianza (Italy) - i.e. l ...
Voir le projet

 10

 TERMINÉ 
Heat management is a paramount challenge in many cutting edge technologies, including new GaN electronic technology, turbine thermal coatings, resistive memories, or thermoelectrics. Further progress requires the help of accurate modeling tools that can predict the performance of new complex materials integrated in these increasingly demanding novel devices. However, there is currently no general ...
Voir le projet

 7

 TERMINÉ 
The 3Ccar project will provide highly integrated ECS Components for Complexity Control in thereby affordable electrified cars. The new semiconductors for Complexity management (Control, reduction) will offer the next level of energy efficiency in transportation systems.3Ccar’s impact is maximizing pragmatic strategy: Use semiconductor technology innovations to manage functionality & complexity inc ...
Voir le projet

 47

 TERMINÉ 

Graphene-based disruptive technologies (GrapheneCore1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Voir le projet

 158

 TERMINÉ 

HARDWARE ENABLED CRYPTO AND RANDOMNESS (HECTOR)

Date du début: 1 mars 2015, Date de fin: 28 févr. 2018,

A single flipped bit or a weak random number generator can cause secure systems to fail. The main objective of this proposal is to close the gap between the mathematical heaven of cryptographic algorithms and their efficient, secure and robust hardware implementations. It requires integrating secure cryptographic primitives such as random number generators (RNGs) and physically uncloneable funct ...
Voir le projet

 9

 TERMINÉ 
SMEs play a key role in European economies; they constitute the largest business block and provide the bulk of employment. They generate most of the innovative ideas for ICT and CPS-enabled IoT products, two areas which represent an inflection point for innovators and industry in Europe. EuroCPS is an ambitious project that aims to arm Europe with a network of design centres that will boost and i ...
Voir le projet

 15

 TERMINÉ 

A Novel, Comprehensible, Ultra-Fast, Security-Aware CPS Simulator (COSSIM)

Date du début: 1 févr. 2015, Date de fin: 31 janv. 2018,

One of the main problems the CPS designers face is “the lack of simulation tools and models for system design and analysis”. This is mainly because the majority of the existing simulation tools for complex CPS handle efficiently only parts of a system while they mainly focus on the performance. Moreover, they require extreme amounts of processing resources and computation time to accurately simula ...
Voir le projet

 8

 TERMINÉ 

Pilot Optical Line for Imaging and Sensing (POLIS)

Date du début: 6 janv. 2014, Date de fin: 6 janv. 2018,

The KET pilot line project POLIS is aimed at maintaining and furthering the innovation capability of CMOS image and optical sensors in Europe. An existing ST CMOS high volume production line, unique in Europe, will serve as the basis of the proposed project. The strategy behind POLIS lies in the development of specific technological modules and to implement them at pilot line level on the existing ...
Voir le projet

 20

 TERMINÉ 

PANACHE

Date du début: 2 janv. 2014, Date de fin: 2 janv. 2018,

Pilot line for Advanced Nonvolatile memory technologies for Automotive microControllers, High security applications and general Electronics :The PANACHE project objective is to set-up a pilot line for embedded Flash technology design and manufacturing platform for the prototyping of innovative µcontrollers in Europe.The current 40nm technology platform as well as the already defined 55nm technolog ...
Voir le projet

 21

 TERMINÉ 

THINGS2DO (THINGS2D0)

Date du début: 1 janv. 2014, Date de fin: 1 janv. 2018,

Develop the FDSOI ecosystem in Europe, beyond the PLACES2BE Pilot Line, in order to increase the impact of this European technology. At the time of set up of the first KET pilot line the proof of FDSOI was mainly technological. In between then and now, the first realization of a complex silicon chip in FDSOI has shown to the worldwide microelectronics community the capabilities of this technology. ...
Voir le projet

 44

 TERMINÉ 

First Operational, Secured and Trusted galilEo Receiver for ITS (FOSTER ITS)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

The primary objective of FOSTER ITS is to design and develop the first secured GNSS module available on the market for ITS application.The FOSTER ITS products will be Galileo, EGNOS, GPS and GLONASS enabled and will offer greater resilience against the increasing range of GNSS threats by:• Detecting signal attack attempts (spoofing, meaconing and jamming);• Providing indicators to users about conf ...
Voir le projet

 4

 TERMINÉ 

Small cEllS coordinAtion for Multi-tenancy and Edge services (SESAME)

Date du début: 1 juil. 2015, Date de fin: 31 déc. 2017,

SESAME targets innovations around three central elements in 5G: the placement of network intelligence and applications in the network edge through Network Functions Virtualisation (NFV) and Edge Cloud Computing; the substantial evolution of the Small Cell concept, already mainstream in 4G but expected to deliver its full potential in the challenging high dense 5G scenarios; and the consolidation o ...
Voir le projet

 21