Rechercher des projets européens

19 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Recent developments in omics technologies demand implementation of systems biology approaches to facilitate analysis and interpretation of the generated complex datasets.This is essential for biotechnological as well as preclinical and clinical applications. In comparison to previous approaches, most cancer relevant studies are confined to pattern recognition or at best modelling of single pathway ...
Voir le projet

 9

 TERMINÉ 
MELODIC will enable data-intensive applications to run within defined security, cost, and performance boundaries seamlessly on geographically distributed and federated cloud infrastructures. Serving the user’s needs and constraints, MELODIC will realise the potential of Cloud computing for big data and data-intensive applications by transparently taking advantage of distinct characteristics of ava ...
Voir le projet

 7

 TERMINÉ 
OpenDreamKit will deliver a flexible toolkit enabling research groups to set up Virtual Research Environments, customised to meet the varied needs of research projects in pure mathematics and applications and supporting the full research life-cycle from exploration, through proof and publication, to archival and sharing of data and code.OpenDreamKit will be built out of a sustainable ecosystem of ...
Voir le projet

 17

 TERMINÉ 
The AFib-TrainNet consortium will enable promising young scientists to become excellent research leaders of the future, capable of fighting the challenges that Atrial Fibrillation (AF) presents to the European population. AF is the most common sustained cardiac arrhythmia, occurring in between 1-2% of the general population. More than 6 million Europeans suffer from this arrhythmia and its prevale ...
Voir le projet

 7

 TERMINÉ 

Measurement and Architecture for a Middleboxed Internet (MAMI)

Date du début: 1 janv. 2016, Date de fin: 30 juin 2018,

Recent revelations about large-scale pervasive surveillance of Internet traffic have led to a rapidly expanding deployment of encryption in order to protect end-user privacy. At the same time, network operators and access providers rely on increasing use of in-network functionality provided by middleboxes and network function virtualization (NFV) approaches to improve network operations and manage ...
Voir le projet

 7

 TERMINÉ 

Live Action Data Input and Output (LADIO)

Date du début: 1 déc. 2016, Date de fin: 31 mai 2018,

Modern film production relies heavily on digital acquisition and transformation. Blending real-world cinematography and computer graphics necessitates a tight integration between the shooting set and post-production. Today, editing and color grading are more and more frequently initiated directly on set to enable interactions between the shooting crew and the creative team. To facilitate communica ...
Voir le projet

 5

 TERMINÉ 
"The objective of the CROWN project is to increase researchers’ mobility between EU countries and China to obtain better understanding of green cooperative cognitive radio for future mobile Internet infrastructure. In particular, the transfer of knowledge, mainly as a result of researcher’s mobility, will focus on a new vision of green Cooperative CR paradigm or CCR. This new vision advocates the ...
Voir le projet

 3

 TERMINÉ 

A New, Evolutive API and Transport-Layer Architecture for the Internet (NEAT)

Date du début: 1 mars 2015, Date de fin: 28 févr. 2018,

At the 2011 OECD High-Level Meeting “The Internet Economy: Generating Innovation and Growth”, Vint Cerf, VP and Chief Internet Evangelist at Google, said that one of the biggest issues with the Internet is “keeping the network as open as possible to invite as much innovation as we can with as little barrier to that innovation as possible, so that new Googles and Amazons and PayPals and Skypes can ...
Voir le projet

 9

 TERMINÉ 

Measuring Mobile Broadband Networks in Europe (MONROE)

Date du début: 1 mars 2015, Date de fin: 28 févr. 2018,

There is a strong need for objective data about stability and performance of Mobile Broadband (MBB) networks, and for tools to rigorously and scientifically assess their performance. In particular, it is important to measure and understand the quality as experienced by the end user. Such information is very valuable for many parties including operators, regulators and policy makers, consumers and ...
Voir le projet

 8

 TERMINÉ 
Uncertainty is intrinsic in Cyber-Physical Systems (CPSs) due to novel interactions of embedded systems, networking equipment, cloud infrastructures, and humans. CPSs have become predominant in critical domains and necessitate the implementation of proper mechanisms to deal with uncertainty during their operation at an acceptable cost avoiding unwarranted threats to its users and environment. One ...
Voir le projet

 9

 TERMINÉ 
... international and inter-sector collaborative project comprising R&D activities and secondments between the SME BioModics (BM), the University of Minho (UMinho), the Bar-Ilan University (BIU) and the Simula Research Laboratory (Simula). The consortium has identified the RISE programme as a suitable vehicle for overcoming the identified major challenges and for bridging the knowledge gap, while hel ...
Voir le projet

 4

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 
Heart failure (HF) is one of the major health issues in Europe affecting 6 million patients and growing substantially because of the ageing population and improving survival following myocardial infarction. The poor short to medium term prognosis of these patients means that, treatments such as cardiac re-synchronisation therapy and mitral valve repair can have substantial impact. However, these t ...
Voir le projet

 9

 TERMINÉ 

Previz for On-set Production - Adaptive Realtime Tracking (POPART)

Date du début: 1 janv. 2015, Date de fin: 30 juin 2016,

European film makers are well-known for their creative innovation in selecting themes, their original way of storytelling and their art of cinematography. Like elsewhere in the world, they use computer-generated visual effects to achieve the intended visual experience and quality.To achieve the best interaction between the creative team on set and the post-production team, it is important to achie ...
Voir le projet

 6

 TERMINÉ 

EU-Ukrainian Mathematicians for Life Sciences (EUMLS)

Date du début: 1 avr. 2012, Date de fin: 31 mars 2016,

"The goal of the project is to establish a structured and sustainable research partnership of mathematicians working on applications in life sciences, consisting of researchers from Ukraine as an eligible ICPC country and several research groups from EU member states and associated countries (MS/AC).There is a sizable – but currently still unstructured – group of Ukrainian researchers from various ...
Voir le projet

 4

 TERMINÉ 

Reducing Internet Transport Latency (RITE)

Date du début: 1 nov. 2012, Date de fin: 30 nov. 2015,

The present Internet limits the performance of applications that need real-time interaction. In part this is because the design of the network has been optimised to boost throughput, maximising efficiency for bulk applications. There is evidence that large buffers throughout the network have added to the end-to-end latency, with excessive delays severely impacting the quality experienced by users. ...
Voir le projet

 9

 TERMINÉ 
The objective of the EVANS project is to increase researchers’ mobility between EU countries and China to obtain better understanding of network virtualisation for future Internet infrastructure. In particular, the knowledge transfer, as a result of researcher’s mobility, will focus on the management aspects of the virtualised network resources rather than the virtualisation techniques themselves. ...
Voir le projet

 4

 TERMINÉ 

Open Platform for EvolutioNary Certification Of Safety-critical Systems (OPENCOSS)

Date du début: 1 oct. 2011, Date de fin: 31 mars 2015,

Safety assurance and certification are amongst the most expensive and time-consuming tasks in the development of safety-critical embedded systems. European innovation and productivity in this market is curtailed by the lack of affordable (re)certification approaches. Major problems arise when evolutions to a system entail reconstruction of the entire body of certification arguments and evidence. F ...
Voir le projet

 21

 TERMINÉ 

Nanoscale Silicon-Aware Network-on-Chip Design Platform (NaNoC)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2012,

Description The objective of this project is to develop an innovative network-on-chip oriented design platform constituting a toolkit for the construction of NoC-based multi-core systems in nanoscale technologies The NaNoC project aims at developing an innovative design platform for future Network ...
Voir le projet

 8