Rechercher des projets européens

30 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Landmines and the cluster munitions still kill or maim civilians every day in an indiscriminate manner even long after conflicts are over. At the current rate of clearance of about 500,000 mines per year and assuming no additional mines are laid from now on, it could still take hundreds of years to find and clear all the landmines around the world.D-BOX will tackle the burning issue of anti-person ...
Voir le projet

 24

 TERMINÉ 

Hyperspectral imaging IED and explosives reconnaissance system (HYPERION)

Date du début: 1 août 2012, Date de fin: 31 oct. 2015,

The objective with the HYPERION project is to develop and test a system concept for the on-site forensic analysis of an explosion. The forensic tools and procedures used will in majority be at safe stand-off detection distances. This will also include tools for identification of unexploded IEDs. The on-site data provided by the HYPERION system will be the type and amount of explosive used in the a ...
Voir le projet

 13

 TERMINÉ 

European CYber Security Protection Alliance (CYSPA)

Date du début: 1 oct. 2012, Date de fin: 31 mars 2015,

The goal of CYSPA is to address trustworthy ICT through a European strategy to protect cyberspace, with target audiences ranging from research communities and industry to public authorities and infrastructure operators.This goal builds on the analysis that the entire cyberspace which embodies our connected society has been created by technology but evolving towards trustworthy ICT requires taking ...
Voir le projet

 21

 TERMINÉ 

Combined Model-based Analysis and Testing of Embedded Systems (MBAT)

Date du début: 1 nov. 2011, Date de fin: 31 déc. 2014,

"One of the most important strategic sectors in which Europe is developing, integrating and delivering high-quality products is the transportation domain. Here, high-class safety-related products as e.g. airplanes, cars and trains have a huge market impact. More and more of the market value of these vehicles is gained by embedded systems inside these products, and the number and importance of thes ...
Voir le projet

 42

 TERMINÉ 
Efficient deployment and management has been identified as one of the main problems for the acceptance of new technologies based on Cooperating Objects (COs). The goal of PLANET is to provide an integrated planning and maintenance platform that enables the deployment, operation and maintenance of heterogeneous networked COs in an efficient way. The main objective of the project particularly emphas ...
Voir le projet

 14

 TERMINÉ 
The protection of the national infrastructures is one of the main issues for national and international security. While FP7 MICIE project has proved that increasing cooperation among infrastructures increases their level of service and predictive capability, it is not enough to effectively counteract threats such as cyber attacks. Such attacks could be performed blocking communication from central ...
Voir le projet

 14

 TERMINÉ 
The objective of PRACTICE project is to improve the preparedness and resilience of the EU member states and associated countries to an attack from a terrorist group using non conventional weapons such as CBRN (Chemical, Biological, Radiological and/or Nuclear agents) materials. The existing situation is characterized by a fragmented structure as regards technology, procedures, methods and organiza ...
Voir le projet

 28

 TERMINÉ 
Facing the problem of enhancing the railway security with a systematic top-down approach (i.e. to search for an all-inclusive solution valid for all the conceivable threat scenarios) is judged by PROTECTRAIL members too ambitious even if it could generate potential economies of scale and effort rationalisation. The proposed PROTECTRAIL approach is therefore to split the problem of making the railw ...
Voir le projet

 31

 TERMINÉ 
"The goal of this project is to develop an advanced sensor system, that combines miniaturized Gas Chromatography (GC) as its key chemical separation tool, and Hollow-Fiber-based Infra Red Absorption Spectroscopy (HF-IRAS) as its key analytical tool to recognize and detect illicit drugs, key precursors and potential derivatives. The DIRAC sensor will be developed to: 1) be used on the field primari ...
Voir le projet

 12

 TERMINÉ 

Sea Border Surveillance (SeaBILLA)

Date du début: 1 juin 2010, Date de fin: 28 févr. 2014,

The SeaBILLA proposal aims to 1) define the architecture for cost-effective European Sea Border Surveillance systems, integrating space, land, sea and air assets, including legacy systems; 2) apply advanced technological solutions to increase performances of surveillance functions; 3) develop and demonstrate significant improvements in detection, tracking, identification and automated behaviour an ...
Voir le projet

 29

 TERMINÉ 
"Air traffic in Europe is expected to double by 2025 according to the last forecast of Eurocontrol. Future passenger and freight fleets will bring better efficiency and improved environmental performance, and will allow people to benefit from the connections that only air transport can deliver. In this context, an integrated aircraft communication system is of paramount importance to improve effic ...
Voir le projet

 34

 TERMINÉ 
"Taking benefit from the previous and on-going efforts in the GMES context, the DOLPHIN project intends to develop the key technological and operational gap-filling innovations, leading in the mid-term to a full and sustainable operational exploitation of Earth Observation Satellites capabilities in the EU and MS maritime policies applications.DOLPHIN aims at developing new tools providing effecti ...
Voir le projet

 21

 TERMINÉ 

Drugs and Precursor Sensing by Complementing Low Cost Multiple Techniques (CUSTOM)

Date du début: 1 juin 2010, Date de fin: 30 nov. 2013,

A large number of techniques have been developed in the latest decades, which are able to screen and identify specific molecules for drug precursors detection even at very low concentration in lab testing.Nevertheless the objective to build up a system which proves to be easy to use, compact, able to provide screening over a large number of compounds and discriminate them with low false alarm (FA) ...
Voir le projet

 11

 TERMINÉ 

Silicon-Organic hybrid Fabrication platform for Integrated circuits (SOFI)

Date du début: 1 janv. 2010, Date de fin: 30 juin 2013,

In the SOFI project, new active optical waveguides and integrated optoelectronic circuits based on a novel silicon-organic hybrid technology are introduced. The technology is based on the low-cost CMOS process technology for fabrication of the optical waveguides - allowing for the convergence of electronics with optics. It is complemented by an organic layer that brings in new functionalities so f ...
Voir le projet

 8

 TERMINÉ 
"The main problem of First Responders (FR) (fire fighters, police, etc...) in case of crisis at critical infrastructures are the loss of communication and location and the lack of information about the environment (temperature, hazardous gases,etc.). Therefore, during the intervention, there is a gap between the First responders' situation (positioning, health,etc) and the overall view of at their ...
Voir le projet

 11

 TERMINÉ 

Virtualized dIstributed plaTfoRms of smart Objects (VITRO)

Date du début: 1 sept. 2010, Date de fin: 28 févr. 2013,

The quick growth of the Virtual Sensor Networking (VSN) domain has led to a highly dispersed gamut oftechnologies and approaches, which seriously jeopardize the long-term vision of an Internet of Thingssince very few of these solutions are able to mutually communicate. VITRO aims at providing this crucialbut missing link between highly heterogeneous wireless sensors and actuators platforms and hen ...
Voir le projet

 11

 TERMINÉ 

AiR Guidance and Surveillance 3D (ARGUS 3D)

Date du début: 1 déc. 2009, Date de fin: 28 févr. 2013,

"The project aims to improve the detection of manned and unmanned platforms by exploiting the treatment of more accurate information of cooperative as well as non-cooperative flying objects, in order to identify potentially threats. The scope will be reached by managing the 3D position data in region including extended border lines and large areas, 24 hours a day and in all weather conditions, der ...
Voir le projet

 13

 TERMINÉ 
...)-\t2 public Research institutes, leaders for RF-MEMS development over a large range of frequencies (LETI, FBK)-\t4 industrial end-users among the main players in Communication, Security & Safety: SELEX-SI for concealed weapon detection, EADS-Innovation Works for helicopters landing radar, Thales Alenia Space for satellites and S.R.F.Moyano for base-stations.
Voir le projet

 9

 TERMINÉ 

Strategic Crime and Immigration Information Management System (SCIIMS)

Date du début: 1 nov. 2009, Date de fin: 31 oct. 2012,

"People trafficking and People Smuggling has long been a problem for European Governments, adversely affecting the security of their citizens. In many cases women and children are exploited for the sex trade and labour exploitation. In formulating the SCIIMS project the consortium will focus upon an overarching question from which the developed system, demonstration and experimentation will answe ...
Voir le projet

 9

 TERMINÉ 
High-sensitivity gas sensors measure the presence of trace gases. They have a wide range of applications. Finnish SME Gasera has recently developed a MEMS-based mechanism for detecting the pressure waves created in photo-acoustic cells. This innovation can be used to realize infrared gas sensors of extreme sensitivity. Instead of the usual microphone (membrane with capacitive readout) the Gasera c ...
Voir le projet

 7

 TERMINÉ 

Cost-Efficient Methods and Processes for Safety Relevant Embedded Systems (CESAR)

Date du début: 1 mars 2009, Date de fin: 30 juin 2012,

"The embedded safety-critical systems design and development industry is facing increasing complexity and variety of systems and devices, coupled with increasing regulatory constraints while costs, performances and time to market are constantly challenged.This has led to a profusion of enablers (new processes, methods and tools), which are neither integrated nor interoperable because they have bee ...
Voir le projet

 54

 TERMINÉ 

Aftermath Crisis Management System-of-systems Demonstration (ACRIMAS)

Date du début: 1 févr. 2011, Date de fin: 31 mai 2012,

"Crisis management (CM) is a core capability of modern societies, but a highly diversified and heterogeneous area. Current CM in the EU can be regarded as a “system-of-systems” integrating diverse organisations and components with different cultures, policies and assets, and various stakeholders and procurement schemes. ACRIMAS understands the term “system-of-systems” that it incorporates technolo ...
Voir le projet

 15

 TERMINÉ 

EUropean software defined radio for WireLEss in joint secuRity operations (EULER)

Date du début: 1 mars 2009, Date de fin: 30 avr. 2012,

The EULER project proposal gathers major players in Europe in the field of wireless systems communication integration and software defined radio (SDR), is supported by a strong group of end-users, and aims to define and actually demonstrate how the benefits of SDR can be leveraged in order to drastically enhance interoperability and fast deployment in case of crisis needed to be jointly resolved. ...
Voir le projet

 19

 TERMINÉ 

Underwater Acoustic Network (UAN)

Date du début: 1 oct. 2008, Date de fin: 30 sept. 2011,

The UAN project aims at conceiving, developing and testing at sea an innovative and operational concept for integrating in a unique system submerged, surface and aerial sensors with the objective of protecting critical infrastructures, such as off-shore platforms and energy plants. The security of such economically vital infrastructures requires an integrated approach involving underwater and land ...
Voir le projet

 7

 TERMINÉ 

Optically Driven Terahertz Amplifiers (OPTHER)

Date du début: 1 avr. 2008, Date de fin: 30 sept. 2011,

This proposal focuses on the development of an application-specific component that works in the Terahertz (THz) regime; in this context, we propose to realize a THz source with innovative features specific for monitoring systems for safety and security. Until now the use of THz monitoring system has been strongly limited due to the very low power and the large dimensions of the existing sources ...
Voir le projet

 6

 TERMINÉ 
Scalability, reconfigurability, and security are three aspects of paramount importance in developing efficient, predictable and safe control architectures for large-scale networked industrial automation. CHAT is about developing core components (algorithms, protocols and procedures) of the next-generation of distributed control systems, able to tackle the supervision and control of larger and mor ...
Voir le projet

 9

 TERMINÉ 

INcreasing Security and Protection through Infrastructure REsilience (INSPIRE)

Date du début: 1 nov. 2008, Date de fin: 31 janv. 2011,

The INSPIRE proposal aims at enhancing the European potential in the field of security by assuring the protection of critical information infrastructures through the identification of their vulnerabilities and the development of innovative techniques for securing networked process control systems.To increase the resilience of such systems INSPIRE will develop traffic engineering algorithms, self-r ...
Voir le projet

 9

 TERMINÉ 
"NANORAY aims to realize an innovative device capable to generate X-rays by means of a novel concept of cold cathode, based on carbon nanotubes selectively grown upon ad-hoc synthesized nanostructures (such as vertically oriented nanotubes on metallic tips, selected deposition of CNTs on predetermined areas, array of oriented bundles, etc..) Its performances can be wrapped up by mentioning some of ...
Voir le projet

 10

 TERMINÉ 

Simulation of Crisis Management Activities (SICMA)

Date du début: 1 mars 2008, Date de fin: 31 août 2010,

"The proposal focuses on computer assisted decision making for Health Service crisis managers; it will aim at improving decision-making capabilities through an integrated suite of modelling and analysis tools providing insights into the collective behaviour of the whole organisation in response to crisis scenarios. Decision Support has to be provided in the following phases: - preparation: assisti ...
Voir le projet

 10

 TERMINÉ 
"OPERAMAR is meant to provide the foundations for pan-European Maritime Security Awareness by addressing the insufficient interoperability of European and national assets with a view to generating unified data models for seamless exchange and contributing to address the discrepancies of the behavioural, organisational, and cultural issues. It is today recognized, that effective management of Marit ...
Voir le projet

 10