Rechercher des projets européens

32 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Advancing the European Multilingual Experience (ATHEME)

Date du début: 1 mars 2014, Date de fin: 28 févr. 2019,

"The project Advancing The European Multilingual Experience (AThEME) takes an integrated approach towards the study of multilingualism in Europe by incorporating and combining linguistic, cognitive and sociological perspectives; by studying multilingualism in Europe at three different levels of societal magnitude, viz. the individual multilingual citizen, the multilingual group, and the multilingu ...
Voir le projet

 18

 TERMINÉ 

LArge Scale Information Exploitation of Forensic Data (LASIE)

Date du début: 1 mai 2014, Date de fin: 31 oct. 2017,

The LASIE project will design and develop a novel framework to assist forensic analysts in their investigations. The envisaged framework will be based on automated technology for advanced data processing supported by an important human component in critical decision making stages, as well as, legal and ethical aspects. The framework will consist of tools to automatically manipulate, analyse and fu ...
Voir le projet

 18

 TERMINÉ 

Controlling domain wall dynamics for functional devices (WALL)

Date du début: 1 sept. 2013, Date de fin: 31 août 2017,

"WALL is a training network on the topic of domain walls in nanoscale magnetic structures, which will provide the next generation of researchers in this area of advanced technology. Domain walls (DWs) are the interfaces separating magnetic domains, their high speed manipulation in nanostructures will lead to the next generation of new and low power functional devices for computation and communicat ...
Voir le projet

 8

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 

Dependable Embedded Wireless Infrastructure (DEWI)

Date du début: 1 mars 2014, Date de fin: 28 févr. 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Voir le projet

 61

 TERMINÉ 

The Human Brain Project (HBP)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

Understanding the human brain is one of the greatest challenges facing 21st century science. If we can rise to the challenge, we can gain profound insights into what makes us human, develop new treatments for brain diseases and build revolutionary new computing technologies. Today, for the first time, modern ICT has brought these goals within sight. The goal of the Human Brain Project, part of the ...
Voir le projet

 116

 TERMINÉ 
"The MAN-MADE project aims at defining new socially sustainable workplaces where the human dimension is a key cornerstone. Workers are foreseen at the centre of the factory, on the one hand, in terms of workplace adaptation (and production planning, at large) to skills, expertise and characteristic of each single worker and, on the other hand, in terms of capability to make the most out of worker’ ...
Voir le projet

 9

 TERMINÉ 
Agricultural residues could represent a good source of biomass to convert into energy in particular wherever it is impractical to convert cropland to energy crop cultivation . According to FAO’s reportage (1997) , large quantities of ligneous biomass can be obtained from pruning operations carried out in Mediterranean fruit plantations. Agricultural residues therefore play an important role in any ...
Voir le projet

 19

 TERMINÉ 
International debates on climate change highlight the need to foster adaptation planning in Latin America where significant impacts are expected. However, little progress has been made due to the difficulty of managing environmental dynamics characterized by deep uncertainties and potential tensions at various scales.EcoAdapt is built on the outcomes of two rounds on regional consultation with Lat ...
Voir le projet

 9

 TERMINÉ 

Advances in Numerical and Analytical tools for DEtached flow prediction (ANADE)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2015,

The present project is based on existing collaborations in different national and international projects, a common research interest toward fluid dynamics applied to industrial problems and existing, although immature, common training programs between the partners. We all partners agree that the current skills of science graduates in the technologies covered by this project are still insufficient ...
Voir le projet

 10

 TERMINÉ 
Policy dialogue in science, technology and innovation has become an important vehicle for Latin America participation in EU-FP7 and ICT is currently in the bilateral and bi-regional political agendas. To ensure continuity and enhance collaborative ICT research and innovation (R&I) in Horizon 2020, LEADERSHIP will support the evolving dialogues on EU-LAC cooperation in ICT, by providing input, both ...
Voir le projet

 11

 TERMINÉ 
Insights gained in FI-PPP Phase 1 emphasize the need for novel ICT solutions that allow radical improvements for collaboration in business networks. Primary sectors demanding such solutions are Agri-Food and Transport & Logistics industries: several actors (incl. enterprises, authorities, service providers) need to exchange information & communicate across org. borders to conduct business. Current ...
Voir le projet

 39

 TERMINÉ 

Leone: From global measurements to local management (LEONE)

Date du début: 1 sept. 2012, Date de fin: 30 avr. 2015,

The Leone project is a 30-month long STREP targeting "Future Networks" within the 7th Framework programme. The project addresses "Novel Internet architectures, management and operation frameworks".The goal of the Leone project is to research and develop an innovative network management framework that has two novelties:• It is focused on Quality of Experience: Probes sited alongside end use ...
Voir le projet

 10

 TERMINÉ 
Motivation. The last decades brought an exponential increase in mobile traffic volume. This will continue and a 1000-fold increase by 2020 has been forecasted. Small-cells promise to provide the required data rates through an increased spatial utilisation of the spectrum.Problem statement. Due to strong inter-cell interference, small-cell deployments will require a high degree of coordination as o ...
Voir le projet

 12

 TERMINÉ 
Inspired by the merging of the artist’s studio with the research lab to create a hybrid creative space, STUDIOLAB proposes the creation of a new European platform for creative interactions between art and science. STUDIOLAB brings together major players in scientific research with centres of excellence in the arts and experimental design and leverages the existence of a new network of “hybrid” spa ...
Voir le projet

 14

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Voir le projet

 92

 TERMINÉ 

uBiquitous, secUre inTernet-of-things with Location and contExt-awaReness (BUTLER)

Date du début: 1 oct. 2011, Date de fin: 31 oct. 2014,

Recent ICT advances are bringing to reality a world where sensors, actuators and smart portable devices are interconnected into an Internet-of-Things (IoT) ecosystem reaching 50 Billion devices by 2015.The IoT major challenges are, from a systemic viewpoint, smart resource management and digital security; and from a user/service perspective, the pervasiveness (uniformity of performance anytime an ...
Voir le projet

 23

 TERMINÉ 
"Enhancing European Coordination for National Research Programmes in the Area of Security at Major Events – THE HOUSE is aimed at strengthening the ERA on Major Events security by applying the research coordination tools/methodologies developed during seven years of activity within the projects EU-SEC and EU-SEC II. THE HOUSE builds on the assumption that Major Events are “windows of opportunity” ...
Voir le projet

 25

 TERMINÉ 

Propellantless deorbiting of space debris by bare electrodynamic tethers (BETs)

Date du début: 1 nov. 2010, Date de fin: 31 janv. 2014,

"Concern about the growth of space debris, aggravated by the increase in the number of countries with direct access to space, made the SPA.2010.2.3-02 Call Topic suggest ""preventing generation of new debris and de-orbiting upper stages and spacecraft after mission completion"". The Project proposed involves Research and Technology Development of an efficient deorbit system, to be carried in the ...
Voir le projet

 7

 TERMINÉ 
GROUND-MED project will demonstrate geothermal heat pump (GSHP) systems for heating and cooling of measured SPF>5,0 in 8 demonstration sites of South Europe. As the SPF is determined not only by the heat pump unit, but by its operating conditions imposed to the heat pump by the ground heat exchanger and the heating/cooling system of the building as well, integrated systems incorporating the follow ...
Voir le projet

 24

 TERMINÉ 

SUPERSONIC DEPOSITION OF NANOSTRUCTURED SURFACES (SUPERSONIC)

Date du début: 1 déc. 2009, Date de fin: 30 nov. 2013,

"The basic scientific and technological concept of the project is to use agglomerated nanophased powders to be transferred onto a substrate in the form a coating with very little or none change of crystal structure. This will allow to obtain nano-structured coatings with a crystal size very close to the powder one. The concept will be extended to an important breakthrough concept that is the “Sup ...
Voir le projet

 12

 TERMINÉ 
"ADDRESS will research, develop and deploy technologies and processes to increase usage of Distributed Generation and Renewable Energy Resources thereby engaging in a new relationship between customers, generators and network operators. ADDRESS aims to develop new innovative architectures for Active Distribution Networks (ADN) able to balance in real time power generation and demand allowing netwo ...
Voir le projet

 27

 TERMINÉ 
"The aim of the SILENTWOOD project is to develop and validate a novel, price-competitive, certificable exterior wooden-based door with enhanced acoustic performance to attend the growing demand and comply with increasingly stringent building legislations for residential, educational and sanitary premises. It will also cope with the broadest range of aesthetic and architectonic variables and applic ...
Voir le projet

 11

 TERMINÉ 

Action for the Science of complex SYtems for Socially intelligent icT (ASSYST)

Date du début: 1 janv. 2009, Date de fin: 31 mars 2012,

Description ASSYST will coordinate research around the call Science of complex systems for socially intelligent ICT (COSI-ICT) in the context of the wider science of complex systems (CS).ASSYST will make Complex Systems science and the potential of COSI-ICT better understood by scientific policy makers and funders at national and internation ...
Voir le projet

 15

 TERMINÉ 

Natural Antimicrobials For Innovative and Safe Packaging (NAFISPACK)

Date du début: 1 nov. 2008, Date de fin: 31 déc. 2011,

"The main objective of the present project is to develop novel packaging technologies that will avoid/reduce and detect the growth of pathogens and spoilage microoganism responsible for product lost in perishable food products of interest: fresh fish, fresh chicken and minimally processed vegetables (MPVs). The target foods were selected among many, for different reasons: the consumption of MPVs i ...
Voir le projet

 17

 TERMINÉ 

COllaboration and INteroperability for networked enterprises (COIN)

Date du début: 1 janv. 2008, Date de fin: 31 déc. 2011,

"By 2020 enterprise collaboration and interoperability services will become an invisible, pervasive and self-adaptive knowledge and business utility at disposal of the European networked enterprises from any industrial sector and domain in order to rapidly set-up, efficiently manage and effectively operate different forms of business collaborations, from the most traditional supply chains to the m ...
Voir le projet

 28

 TERMINÉ 

Managing the complexity of the open source infrastructure (MANCOOSI)

Date du début: 1 févr. 2008, Date de fin: 31 mai 2011,

Description Software is everywhere. And it needs maintenance: upgrades, fixes, new versions... But how can you be sure that a software installation will not break something which was working previously? Did you ever install an upgrade on your PC, just to find out afterwards that something very imp ...
Voir le projet

 10

 TERMINÉ 

New biocontrol agents for powdery mildew on grapevine (BCA_grape)

Date du début: 1 juil. 2008, Date de fin: 31 mars 2011,

The main goal of the BCA_grape project is to develop prototypes of new commercial Biological Control Agents (BCAs) against Erysiphe necator, the fungus causing the powdery mildew of grapevine. The interest of the participating SMEs rises from the fact that this disease matches with their strategic need to increase the offer for crops and diseases not targeted by their currently available products: ...
Voir le projet

 6

 TERMINÉ 
Experimentally driven research is key to success in today's Internet. Many test beds support research and development, and product prototyping in communication networks. However, they tend to specialise in particular access technologies or services, or explore near term product offerings, often with limited availability and openness. An open and sustainable large-scale shared experimental facility ...
Voir le projet

 30

 TERMINÉ 

Generic Responsive Adaptive Personalized Learning Environment (GRAPPLE)

Date du début: 1 févr. 2008, Date de fin: 31 janv. 2011,

Description GRAPPLE has delivered a truly generic and extensible technical infrastructure to support life-long adaptive learningProject GoalTo deliver to learners a technology-enhanced learning environment that guides them through a life-long learning experience, automatically adapting to personal preferences, prior knowledge, skills and ...
Voir le projet

 16

 TERMINÉ 
"The plastic processing industry faces many challenges, although the use of plastics grows with new opportunities and applications To take advantage, SMEs have to innovate and diversify their business offer. Clusters assist this process by joining technical centres to monitor technological development, and suppliers of equipment and materials to improve competitiveness. The plastic processing indu ...
Voir le projet

 11

 TERMINÉ 

Identifying the Needs of Medical First Responder in Disasters (NMFRDisaster)

Date du début: 1 mai 2008, Date de fin: 30 juin 2009,

Identifying the Needs of Medical First Responder in Disasters (NMFRDisaster) is a project coordinating medical first responders with research institutes in order to identify need for further research in the following areas: 1) Training methodology and technology used to train medical first responders for disasters. 2) Understanding the human impact of disaster on first responders. 3) Ethical and ...
Voir le projet

 10