Rechercher des projets européens

13 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Massive InteGRATion of power Electronic devices (MIGRATE)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

By 2020, several areas of the HVAC pan-European transmission system will be operated with extremely high penetrations of Power Electronics(PE)-interfaced generators, thus becoming the only generating units for some periods of the day or of the year – due to renewable (wind, solar) electricity. This will result in i) growing dynamic stability issues for the power system (possibly a new major barrie ...
Voir le projet

 24

 TERMINÉ 

PROMOTioN - Progress on Meshed HVDC Offshore Transmission Networks (PROMOTION)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

... linking off-shore wind parks and on-shore grids in different countries. HVDC technology is envisaged but the deployment of meshed HVDC offshore grids is currently hindered by the high cost of converter technology, lack of experience with protection systems and fault clearance components and immature international regulations and financial instruments. PROMOTioN will overcome these barriers by dev ...
Voir le projet

 35

 TERMINÉ 
"A group of eight Transmission System Operators with a generator company, manufacturers and research organisations, propose 5 demonstration projects to remove, in 4 years, several barriers which prevent large-scale penetration of renewable electricity production in the European transmission network. The full scale demonstrations led by industry aim at proving the benefits of novel technologies cou ...
Voir le projet

 39

 TERMINÉ 
...lity criteria are compared and presented to the TSO community and regulatory authorities who establish the robustness of the results. Dissemination activities of the new reliability criteria are supported by a Reference Group of TSOs and address all the key electricity market stakeholders. An implementation roadmap is delivered for the deployment of the resulting technical and regulatory solutions ...
Voir le projet

 20

 TERMINÉ 
Fast, accurate forecasting of spatiotemporal data is needed in critical industrial domains such as energy (prediction of spatiotemporal patterns in renewable generation, usage and traffic) as well as in public policy. The task is so challenging in scale and scope however as to have been confined mainly to research, while past prize competitions have been limited to forecasts of single dimensional ...
Voir le projet

 4

 TERMINÉ 
The basic assumption of the project is that the difficult public acceptance of Electric Power System (EPS) infrastructures are due to several reasons: i) the lack of trustworthiness in the relationship between Transmission System Operators (TSOs) and the stakeholders and general public; ii) the difficulty in comparing the new EPS infrastructures benefits, which are on a global, with the impacts , ...
Voir le projet

 11

 TERMINÉ 
With the growing relevance of distributed renewable energy sources (DRES) in the generation mix and the increasingly pro-active demand for electricity, power systems and their mode of operation need to evolve. evolvDSO will define future roles of distribution system operators (DSOs) on the basis of scenarios which will be driven by different DRES penetration levels, various degrees of technologica ...
Voir le projet

 16

 TERMINÉ 

Innovative Tools for Electrical System Security within Large Areas (iTESLA)

Date du début: 1 janv. 2012, Date de fin: 31 mars 2016,

... future operations of the pan-European electricity transmission network, thus favouring increased coordination/harmonisation of operating procedures among network operators. Under the coordination of RTE, new concepts, methods and tools are developed to define security limits of the pan European system and to quantify the distance between an operating point and its nearest security boundary: this ...
Voir le projet

 23

 TERMINÉ 

Modular Development Plan of the Pan-European Transmission System 2050 (e-HIGHWAY2050)

Date du début: 1 sept. 2012, Date de fin: 31 déc. 2015,

Eight Transmission System Operators (BE, CZ, FR, DE, IT, PT, CH, PL) and ENTSO-E, together with 4 associations of technology manufacturers, and 16 RTD performers propose a 3-year R&D project to develop and to apply a methodology for the long-term development of the Pan-European transmission network. The project aims at delivering a top-down methodology to support the planning from 2020 to 2050. F ...
Voir le projet

 28

 TERMINÉ 
A group of 6 Transmission System Operators (Belgium, Denmark, France, Germany The Netherlands and Spain) with 2 generator companies, 5 manufacturers and research organisations, propose 6 demonstration projects to remove, in 3 years, several barriers which prevent the electric system from welcoming more wind electricity, and wind electricity from contributing more to the electric system. The full s ...
Voir le projet

 29

 TERMINÉ 
...roject to compare pros and cons of new market designs aiming at the integration of massive intermittent energy sources dispersed in several regional power markets. Under the technical coordination of RTE, they will implement a novel network/system/market modelling approach to provide the consortium with an open simulation platform able to exhibit the comparative benefits of several market design o ...
Voir le projet

 15

 TERMINÉ 
The integration of wind generation into power systems is affected by uncertainties in the forecasting of expected power output. Misestimating of meteorological conditions or large forecasting errors (phase errors, near cut-off speeds etc), are very costly for infrastructures (i.e. unexpected loads on turbines) and reduce the value of wind energy for end-users. The state of the art in wind power fo ...
Voir le projet

 21

 TERMINÉ 

Pan European Grid Advanced Simulation and state Estimation (PEGASE)

Date du début: 1 juil. 2008, Date de fin: 30 juin 2012,

"PEGASE is a four year project dealing with the High and Extra High Voltage transmission and sub-transmission networks in Europe (designated as ETN) and implemented by a Consortium composed of 20 Partners including TSOs, expert companies and leading research centre’s in power system analysis and applied mathematics. Its overall objectives are to define the most appropriate state estimation, optimi ...
Voir le projet

 25