Rechercher des projets européens

15 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
sustainablySMART will make a change to the life cycle of mobile information and communication devices by developing new product design approaches (including enhanced end-of-life performance, re-use and re-manufacturing aspects; i.e. implementing “Design for a Circular Economy”) for smartphones and tablet computers on the product and printed circuit board level, and by new re-/de-manufacturing proc ...
Voir le projet

 17

 TERMINÉ 
To meet the high throughput demands envisaged for 5G networks, with increased user densification and bandwidth-hungry applications, while at the same time reducing energy consumption, iCIRRUS proposes an intelligent Cloud-Radio Access Network (C-RAN) that brings together optical fibre technology, low-cost but highly flexible Ethernet networking, wireless resource management for device-to-device (D ...
Voir le projet

 12

 TERMINÉ 

POINT: iP Over IcN - the betTer ip (POINT)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

The goal of POINT is to develop technology, innovations, and business value chains for commercially viable IP-over-ICN deployment, based on the hypothesis that many current IP-based applications can run ‘better’ on an ICN-based network than on current IP networks.To achieve this, we will first define a set of Key Performance Indicators (KPIs) to specify what exactly 'better' means. Then, we will s ...
Voir le projet

 9

 TERMINÉ 

Adaptive Data and Power Aware Transceivers for Optical Communications (ADDAPT)

Date du début: 1 nov. 2013, Date de fin: 30 avr. 2017,

Existing optical networks are driven by dynamic user demands but operate statically at their maximum performance and do not offer much adaptability. Thus the links are not energy-efficient. ADDAPT aims at the development and technology take-up of dynamic transceiver subsystems. By implementing performance and power adaptivity from system down to optical device, electrical circuit and transistor le ...
Voir le projet

 8

 TERMINÉ 

Network Functions as-a-Service over Virtualised Infrastructures (T-NOVA)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

Network Functions Virtualisation (NFV) is an emerging concept, which refers to the migration of certain network functionalities, traditionally performed by hardware elements, to virtualized IT infrastructures, where they are deployed as software components. NFV leverages commodity servers and storage, including cloud platforms, to enable rapid deployment, reconfiguration and elastic scaling of net ...
Voir le projet

 19

 TERMINÉ 

SECURity at the network EDge (SECURED)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

Protection of mobile devices from Internet threats is usually achieved by installing appropriate tools (e.g. anti-virus, personal firewall, parental control) on each device. However, this poses several issues: it requires privileged access on the device, appropriate protection tools may not exist on all the platforms or their capabilities may vary greatly across the different devices, and tools ma ...
Voir le projet

 8

 TERMINÉ 
CONTENT will focus on developing next generation high capacity end-to-end, heterogeneous infrastructure technologies to support the network of the future. The model proposed will be based on the Infrastructure as a Service (IaaS) paradigm and provide a technology platform interconnecting geographically distributed IT resources that can support a variety of Cloud services. This platform will includ ...
Voir le projet

 7

 TERMINÉ 

Socially Aware, collaboRative, scAlable Coding mEdia distributioN (SARACEN)

Date du début: 1 janv. 2010, Date de fin: 31 mars 2013,

The rapid progress in hardware/software media technologies has changed the role of individuals from passive content consumers to active content creator/producers. It is clear that in a few years everyone will be multimedia content producer (by publishing digital pictures, video recordings, remote e-health services, home surveillance, etc.), multimedia content mediator (by storing/forwarding strea ...
Voir le projet

 10

 TERMINÉ 

COntent Mediator architecture for content-aware nETworks (COMET)

Date du début: 1 janv. 2010, Date de fin: 31 mars 2013,

In recent years there has been a growing proliferation of user-generated Internet content. This increasing trend has led to an abundance of intermediaries (e.g. YouTube, Flickr, BitTorrent, etc.) which is expected to grow in the future with massive live content generation (e.g. TV channels, SopCast, etc.) The problem is that, currently users need to know the content location a priori and content h ...
Voir le projet

 6

 TERMINÉ 

Economics and Technologies for Inter-Carrier Services (ETICS)

Date du début: 1 janv. 2010, Date de fin: 31 mars 2013,

ETICS aims at creating a new ecosystem of innovative QoS-enabled interconnection models between Network Service Providers allowing for a fair distribution of revenue shares among all the actors of the service delivery value-chain. To this end, we will propose and analyze new business and regulatory models for converged infrastructures, taking into account applications' QoS constraints and incentiv ...
Voir le projet

 18

 TERMINÉ 
Internet traffic has been growing quickly for many years, despite adverse economic conditions and this growth will continue in the future. To cope with this evolution, the cost of today's network solutions is still too high.In addition, in line with the EC goal of reducing the overall emissions, energy efficiency should be widely improved, using whenever possible optics instead of electronics wher ...
Voir le projet

 19

 TERMINÉ 

Metro Architectures enablINg Sub-wavelengths (MAINS)

Date du début: 1 janv. 2010, Date de fin: 30 sept. 2012,

Metro Architectures Enabling Sub-Wavelengths is a project that directly addresses the central theme of the 4th Call for Pervasive & Trustworthy Network & Service Infrastructure. This central theme is the recognition worldwide that the network architectures of the last 20 years were never designed to cope with the new types of demands driven by phenomenon like the Internet, Video, Search, Social Ne ...
Voir le projet

 6

 TERMINÉ 

Advanced MIMO Systems for Maximum Reliability and Performance (MIMAX)

Date du début: 1 janv. 2008, Date de fin: 31 mars 2011,

MIMAX aims at developing of a pervasive, low-power consuming and low-cost MIMO network platform with reliable data-rate of up to 100 Mb/s in environments with strong multipath and coverage ranges up to several hundred meters. The current state-of-the-art performs the combining and processing of the complex antenna signal in the baseband. Since complete transmitter and receiver paths are required f ...
Voir le projet

 6

 TERMINÉ 
The use of mechanisms based on incentives for controlling and managing network traffic of overlay applications in the Internet is still in its early stages. Initial results have shown that such mechanisms do have the important property of scalability with respect to the number of players (i.e. providers, consumers, or peers), and lead to a more efficient network operation. In managing the traffic ...
Voir le projet

 9

 TERMINÉ 
T-SENIORITY objective is to significantly improve quality of life and ensure efficient health and social care for the ageing population by specifying and demonstrating innovative ICT enabled products and services.The proposal is based in the integration of digital services addressed to elders and info-marginated audiences that will be accessed by TV channels and where the important segment of peop ...
Voir le projet

 13