Rechercher des projets européens

28 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Multitech SeCurity system for intercOnnected space control groUnd staTions (SCOUT)

Date du début: 1 nov. 2014, Date de fin: 31 oct. 2017,

"The goal of the project is to study, design and analyze on a risk-based approach a security system relying on multiple technologies for the protection of space control ground stations (SCGSs) against physical and cyber attacks and for intelligent reconfiguration of the ground station network in the case that one or more nodes fail.The SCOUT system is composed of three subsystems:1) A distributed ...
Voir le projet

 9

 TERMINÉ 

Access CenTer for PHotonics innovAtion Solutions and Technology support (ACTPHAST)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2017,

ACTPHAST is a unique "one-stop-shop" European access centre for photonics innovation solutions and technology support (Access CenTre for PHotonics innovAtion Solutions and Technology support). ACTPHAST will support and accelerate the innovation capacity of European SMEs by providing them with direct access to the expertise and state-of-the-art facilities of Europe's leading photonics research cent ...
Voir le projet

 29

 TERMINÉ 

Integrated Reconfigurable silicon photonic based optical Switch (IRIS)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

IRIS aims at fabricating a highly integrated, scalable, transparent and high capacity WDM Photonic Switch used as an Transponder Aggregator (TPA),a novel function which will be added to existing ROADM nodes without disrupting their architecture while adding attributes such as colourless, directionless and contentionless. For Metro networks, this switch will provide flexibility, energy efficiency, ...
Voir le projet

 8

 TERMINÉ 
Our goal is to develop technology for fast optical communication using revolutionary concepts that challenge the mainstream approaches for photonics integration and packaging. The primary application is optical communication inside high performance computing systems, such as supercomputers and datacenters, but the technologies will also find use in many other applications.Power-efficient InP VCSEL ...
Voir le projet

 8

 TERMINÉ 

Federation for FIRE (Fed4FIRE)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2016,

A federation of experimentation facilities will significantly accelerate Future Internet research. Fed4FIRE will deliver open and easily accessible facilities to the FIRE experimentation communities, which focus on fixed and wireless infrastructures, services and applications, and combinations thereof. The project will develop a demand-driven common federation framework, based on an open architect ...
Voir le projet

 43

 TERMINÉ 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Voir le projet

 154

 TERMINÉ 

Cognitive Radio Experimentation World (CREW)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2015,

The main target of CREW is to establish an open federated test platform, which facilitates experimentally-driven research on advanced spectrum sensing, cognitive radio and cognitive networking strategies in view of horizontal and vertical spectrum sharing in licensed and unlicensed bands.The CREW platform incorporates 5 individual wireless testbeds (heterogeneous ISM @ iMinds-Gent, heterogeneous l ...
Voir le projet

 17

 TERMINÉ 

European Conferences on Networks and Communications (EuCNC) (EuConNeCts)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2015,

It is the purpose of EuConNeCts, a Supporting Action, to organise the following 2 editions, 2014 and 2015, of the EC sponsored conference in the area of communication networks and systems. The conference will be named EuCNC - European Conference on Networks and Communications. EuCNC will serve as a technical and scientific conference for researchers, namely European ones, to show their work in t ...
Voir le projet

 5

 TERMINÉ 

Community Networks Testbed for the Future Internet (CONFINE)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2015,

Community networks are an emerging and successful model for the Future Internet across Europe and far beyond. The CONFINE project complements existing FIRE infrastructure by establishing a new facility built on the federation of existing community IP networks constituted by more than 20,000 nodes and 20,000 Km of links. These community networks incorporate a large and wide variety of commodity ...
Voir le projet

 24

 TERMINÉ 
This proposal details activities that will ensure the continued enhancement and ongoing operation of the leading-edge GÉANT network, supporting a range of network and added-value services, targeted at users across the GÉANT service area.In the area of multi-domain network service operation, GN3plus plans to deliver fast, efficient provisioning of advanced services, develop operational support acro ...
Voir le projet

 72

 TERMINÉ 

REVerse engineering of audio-VIsual coNtent Data (REWIND)

Date du début: 1 mai 2011, Date de fin: 30 avr. 2014,

With the rapid proliferation of inexpensive acquisition and storage devices multimedia objects can be easily created, stored, transmitted, modified and tampered with by anyone. During its lifetime, a digital object might go through several processing stages, including multiple analog-to-digital (A/D) and digital-to-analog (D/A) conversions, coding and decoding, transmission, editing (either aimed ...
Voir le projet

 8

 TERMINÉ 

Smart and Efficient Location, idEntification, and Cooperation Techniques (SELECT)

Date du début: 1 sept. 2010, Date de fin: 28 févr. 2014,

The project focus on studying innovative solutions enabling high-accuracy detection, identification, and location of objects/persons equipped with small ultra-low power tags using a network of intelligent self-configuring radio devices. Network functionalities will be enhanced to include the detection and tracking of moving objects/persons without tags eventually present in the same area.To achiev ...
Voir le projet

 9

 TERMINÉ 

PRE-industrial Photonic-based Radar dEsign (PREPARE)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2013,

The aim of PREPaRE is the design and the IPR selling of a radically new pre-industrial photonics-based radar for industrial exploitation. It steps from the ERC project PHODIR which aim was to demonstrate the feasibility and advanced properties of the photonics-based radar. PREPaRE will focus on a specific application, the integrated traffic control (air-side and land-side) in airports, where the a ...
Voir le projet

 1

 TERMINÉ 

PHOtonic-based full DIgital Radar (PHODIR)

Date du début: 1 déc. 2009, Date de fin: 30 nov. 2013,

"PHODIR project aims to study, design and realize a full digital transceiver radar demonstrator based on photonic technology both for signal generation and for RF received signal processing. Hybrid technologies merging second generation optical systems and conventional radar architecture could be the answer to issues deriving from electronic devices poor performances such high SFDR (Spurious Free ...
Voir le projet

 1

 TERMINÉ 

SmartSantander

Date du début: 1 sept. 2010, Date de fin: 30 nov. 2013,

SmartSantander proposes a unique in the world city-scale experimental research facility in support of typical applications and services for a smart city. Tangible results are expected to greatly influence definition and specification of Future Internet architecture design from viewpoints of Internet of Things and Internet of Services.This unique experimental facility will be sufficiently large, op ...
Voir le projet

 24

 TERMINÉ 

Open intelligent systems for Future Autonomous Vehicles (OFAV)

Date du début: 1 déc. 2008, Date de fin: 31 oct. 2013,

The objective of this proposal is the development of an open architecture for future autonomous vehicles to become a standard platform shared by car makers in the design of next generation intelligent vehicles. It is based on 360 degrees sensorial suite which includes perceptual and decision making modules, with the ultimate goal of providing the vehicle with autonomous driving capabilities and/or ...
Voir le projet

 1

 TERMINÉ 

Sensor for 3D Vision (3DV)

Date du début: 1 juin 2012, Date de fin: 31 oct. 2013,

"A low-cost sensor able to perceive 3D information would be a breakthrough for a number of applications. Automotive applications would benefit from a low-cost obstacle detector to increase road safety; agricultural vehicles would be able to sense the environment and perform precise (and even autonomous) maneuvers improving their effectiveness; efficient sensing would be a key also to future buildi ...
Voir le projet

 1

 TERMINÉ 

Medical Imaging Using Bio-inspired and Soft Computing (MIBISOC)

Date du début: 1 oct. 2009, Date de fin: 30 sept. 2013,

"Medical imaging (MI) is at the heart of many of today’s improved diagnostic and treatment technologies. Computer-based solutions are vastly more capable of both quantitative measurement of the medical condition and the pre-processing tasks of filtering, sharpening, and focusing image detail. Bio-inspired and Soft Computing (BC, SC) techniques have been successfully applied in each of the fundamen ...
Voir le projet

 8

 TERMINÉ 

FLexible Architecture for \nVirtualizable wireless future Internet Access (FLAVIA)

Date du début: 1 juil. 2010, Date de fin: 30 juin 2013,

Wireless networks importance for the Future Internet is raising at a fast pace as mobile devices increasingly become its entry point. However, today's wireless networks are unable to rapidly adapt to evolving contexts and service needs due to their rigid architectural design.We believe that the wireless Internet's inability to keep up with innovation directly stems from its reliance on the traditi ...
Voir le projet

 12

 TERMINÉ 
The Internet is not run by a single organization; indeed, this is a key characteristic of the Internet architecture, and a key reason behind its success as a platform for innovation in communications. Instead, the management, safety, and trustworthiness of each domain of the network are the responsibility of that domain; cooperation among these domains is largely done on a personal, and somewhat i ...
Voir le projet

 13

 TERMINÉ 
The White Paper on EU Transport Policy for 2010 states a key objective: 50% reduction of casualties due to road accidents by the end of 2010. Improvements on road safety are achievable increasing the EU market penetration of eSafety systems, currently limited by performance and cost of sensor technologies.According to ICT-2009.6.1, 2WIDE_SENSE addresses research challenges in the area of "Intellig ...
Voir le projet

 7

 TERMINÉ 

Integrating Research in Interactive Storytelling (IRIS)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2011,

Description Virtual Centre of ExcellenceInteractive Storytelling is a major endeavour to develop new media which could offer a radically new user experience, with a potential to revolutionise digital entertainment. European research in Interactive Storytelling has played a leading role in the development of the field, and this creates a u ...
Voir le projet

 11

 TERMINÉ 

NEtwork of Excellence in Wireless COMmunications++ (NEWCOM++) (NEWCOM++)

Date du début: 1 janv. 2008, Date de fin: 30 avr. 2011,

NEWCOM++ is the acronym of a proposed Network of Excellence in Wireless COMmunications, submitted to Call 1 of the VII Framework Programme under the Objective ICT-2007.1.1: The Network of the Future, mainly in its target direction "Ubiquitous network infrastructure and architectures". The current proposal draws inspiration, shape/form, and substantive direction from its successful predecessor, t ...
Voir le projet

 35

 TERMINÉ 
VAALID project aims at creating new tools and methods that facilitate and streamline the process of creation, design, construction and deployment of technological solutions in the context of AAL assuring that they are accessible and usable for senior citizens. The main objective of the project is to develop a 3D-Immersive Simulation Platform for computer aided design and validation of User-Interac ...
Voir le projet

 9

 TERMINÉ 

OPTImisation of Multimedia over wireless Ip links via X-layer design (OPTIMIX)

Date du début: 1 mars 2008, Date de fin: 28 févr. 2011,

The OPTIMIX project will focus on studying innovative solutions enabling enhanced video streaming in an IP based wireless heterogeneous system, based on cross layer adaptation of the whole transmission chain.To achieve this goal, it is proposed to develop a scheme including all elements of major importance in a point to multi point video streaming chain, in particular video coding, networking mo ...
Voir le projet

 9

 TERMINÉ 

Deployment of Remote Instrumentation Infrastructure (DORII)

Date du début: 1 févr. 2008, Date de fin: 31 juil. 2010,

The DORII project aims to deploy e-Infrastructure for new scientific communities, where on the one hand the ICT technology is still not present at the appropriate level, but on the other hand it is demanded to empower its daily work. We deal with a group of scientific users, and this is a reference for DORII, with experimental equipment and instrumentation that are not integrated or integrated onl ...
Voir le projet

 13

 TERMINÉ 

Genetic Message Oriented Secure Middleware (GEMOM)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2010,

The core scientific focus of GEMOM is the significant and measurable increase in end-to-end intelligence and resilience of complex, distributed information systems. GEMOM's definition of intelligence and resilience include:- Insensitivity or significant reduction in sensitivity to individual and sometimes multiple faults in the system. Fault is defined as any deterioration of the functional profil ...
Voir le projet

 10

 TERMINÉ 

Privacy-aware Secure Monitoring (PRISM)

Date du début: 1 mars 2008, Date de fin: 31 mai 2010,

Passive network monitoring is required for the operation and maintenance of communication networks as well as to detect frauds and attacks. Typically, raw packet-level traffic traces are collected using suitable traffic probe devices and fed to monitoring applications (IDSs, antivirus, etc..) for analysis, with potential risks for the legitimate privacy rights of the customers. This projects aims ...
Voir le projet

 8