Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Early-life stressors and LifeCycle health (LIFECYCLE)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2021,

Early life is an important window of opportunity to improve health across the full lifecycle. European pregnancy and child cohort studies together offer an unique opportunity to identify a wide range of early life stressors linked with individual biological, developmental and health trajectory variations, and to the onset and evolution of non-communicable diseases. LIFECYCLE will establish the Eur ...
Voir le projet

 19

 TERMINÉ 
The I4Future Programme is a novel international, interdisciplinary and inter-sectoral doctoral programme hosted at the University of Oulu. The programme is based on full exploitation of the possibilities of modern imaging and characterisation methods in cross-disciplinary work. The unique training programme aims to respond to the increasing need for skilled next-generation ESRs in the changing and ...
Voir le projet

 1

 TERMINÉ 

SUrvey Network for Deep Imaging Analysis and Learning (SUNDIAL)

Date du début: 1 avr. 2017, Date de fin: 31 mars 2021,

Though Big Data has become common in many domains nowadays, the challenges to develop efficient and automated mining of the ever increasing data sets by new generations of data scientists are eminent. These challenges span wide swathes of society, business and research. Astronomers with their high-tech observatories are historically at the forefront of this field, but obviously, the impact in e.g ...
Voir le projet

 9

 TERMINÉ 
The INFRAFRONTIER RI integrates European Mouse Clinics and the European Mouse Mutant Archive with the common goal to ensure access to mouse models for basic research of human health and disease, and to translate this knowledge into therapeutic approaches for the benefit of the European society. The expanded INFRAFRONTIER2020 network, coordinated by the INFRAFRONTIER GmbH, includes 3 SMEs and is st ...
Voir le projet

 33

 TERMINÉ 
Instruct-Ultra aims to advance the scope and efficiency of implementation of Instruct and consolidate the foundations for long-term sustainability. This will be achieved through specific objectives: expand Instruct membership to new Member States and increase global links; engage new user communities; improve efficiencies in service delivery; improve data capture and management; adjust the scale a ...
Voir le projet

 19

 TERMINÉ 

European Masters Programme in Software Engineering

Date du début: 1 août 2015, Date de fin: 31 juil. 2020,

REFERENCE: 564422-EPP-1-2015-1-IT-EPPKA1-JMD-MOB_EMSETITLE: European Masters Programme in Software Engineering, EMSEObjectiveThe European Masters Programme in Software Engineering (EMSE) aims at educating a new generation of software engineers and researchers who meet the requirements of European software ICT practice today.Course durationTwo years (120 ECTS credits).Brief descriptionEMSE is a mas ...
Voir le projet

 4

 TERMINÉ 
MAGIC Post Stroke Project Team has united members from across Europe, dedicated to enable significant change in the delivery of health & social care (H&SC) services for patients post stroke. The consortium has recognised a significant gap in care associated with the recovery of such patients & we need a new way of meeting the needs of 508,000 new post stroke EU citizens/ year. Demographic changes ...
Voir le projet

 14

 TERMINÉ 

Social Innovation in Marginalised Rural Areas (SIMRA)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2020,

SIMRA seeks to advance understanding of social innovation (SI) and innovative governance in agriculture, forestry and rural development (RD), and how to boost them, particularly in marginalised rural areas across Europe, with a focus on the Mediterranean region (including non-EU) where there is limited evidence of outcomes and supporting conditions. These objectives will be achieved by: 1. Develop ...
Voir le projet

 26

 TERMINÉ 

Connecting Science with Society (EU-PolarNet)

Date du début: 1 mars 2015, Date de fin: 29 févr. 2020,

The rapid changes occurring in the Polar Regions are significantly influencing global climate with consequences for global society. European polar research has contributed critical knowledge to identifying the processes behind these rapid changes but, in contrast to lower latitudes, datasets from the Polar Regions are still insufficient to fully understand and more effectively predict the effects ...
Voir le projet

 22

 TERMINÉ 
The goal of GenTree is to provide the European forestry sector with better knowledge, methods and tools for optimising the management and sustainable use of forest genetic resources (FGR) in Europe in the context of climate change and continuously evolving demands for forest products and services. To reach its goal, GenTree will make scientific, technological and implementation breakthroughs in: ( ...
Voir le projet

 22

 TERMINÉ 

Meaningful Integration of Data, Analytics and Services (MIDAS)

Date du début: 1 nov. 2016, Date de fin: 29 févr. 2020,

The MIDAS consortium is a partnership involving health authorities in five EU countries and the U.S. and technical big data experts from research institutions, MNCs and SMEs. Managing big data for ‘health in all’ is a monumental challenge for policy makers. MIDAS is addressing this challenge by developing and delivering an integrated solution which will liberate knowledge from data silos and unify ...
Voir le projet

 17

 TERMINÉ 
South Asians, who represent one-quarter of the world’s population, are at high risk of type-2 diabetes (T2D). Intensive lifestyle modification (healthy diet and physical activity) is effective at preventing T2D amongst South Asians with impaired glucose tolerance, but this approach is limited by high-cost, poor scalability and low impact on T2D burden. We will complete a cluster-randomised clinica ...
Voir le projet

 13

 TERMINÉ 

Quality-Aware Rapid Software Development (Q-RAPIDS)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2019,

Context. Software quality is an essential competitive factor for the success of IT companies nowadays. Recent technological breakthroughs such as cloud technologies, the emergence of IoT and technologies such as 5¬G, pose demanding quality challenges in software development.Problem. Optimal software quality asks for the appropriate integration of quality requirements (QRs) in the software life-cyc ...
Voir le projet

 7

 TERMINÉ 

EPOS Implementation Phase (EPOS IP)

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2019,

The nations of Europe are distributed around some of the most complex and dynamic geological systems on the planet and understanding these is essential to the security of livelihoods and economic power of Europeans. Many of the solutions to the grand challenges in the geosciences have been led by European scientists – the understanding of stratigraphy (the timing and distribution of layers of sedi ...
Voir le projet

 48

 TERMINÉ 

Mathematics and Materials Science for Steel Production and Manufacturing (MIMESIS)

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2019,

The five partners EFD (Norway), SSAB, Outokumpu, and University of Oulu (Finland), and WIAS (Germany) propose an EID programme on Mathematics and Materials Science for Steel Production and Manufacturing, where eight PhD projects are jointly carried out, providing a unique interdisciplinary and inter-sectorial training opportunity. The research is focussed on three major topics - induction heating, ...
Voir le projet

 4

 TERMINÉ 

Transnational mobility & interdisciplinary STEM modules in the digital era

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

Moby Dig: Transnational mobility & interdisciplinary STEM modules in the digital eraThe integration of new and innovative teaching methods into higher education (HE) is inevitable in terms of EU modernisation agenda demanded objectives as increasing the excellence of teaching (enhance quality and develop new ways to deliver education), support the internationalisation, provide/deliver the right mi ...
Voir le projet

 3

 TERMINÉ 

Infrastructure for NMR, EM and X-rays for translational research (iNEXT)

Date du début: 1 sept. 2015, Date de fin: 31 août 2019,

Structural biology provides insight into the molecular architecture of cells up to atomic resolution, revealing the biological mechanisms that are fundamental to life. It is thus key to many innovations in chemistry, biotechnology and medicine such as engineered enzymes, new potent drugs, innovative vaccines and novel biomaterials.iNEXT (infrastructure for NMR, EM and X-rays for Translational rese ...
Voir le projet

 23

 TERMINÉ 

Connected Health Early Stage Researcher Support System (CHESS)

Date du début: 1 sept. 2015, Date de fin: 31 août 2019,

Changing demographics and increasing pressure on health related resources mean that new models of care must be found. Fortunately, technology developments and increasing digital literacy mean that we can now put the correct information in the correct hands at the correct time. This is connected health and it allows patients, clinicians, and planners to make better decisions. Ultimately, these d ...
Voir le projet

 8

 TERMINÉ 

Development and disease of the renal tract (RENALTRACT)

Date du début: 1 juin 2015, Date de fin: 31 mai 2019,

The renal tract (kidneys, the ureters, bladder) is a complex organ system crucial for maintaining the body homeostasis. This organ system arises from different precursor pools through a complex program of patterning, differentiation and morphogenesis in embryonic development. Alteration of this program leads to renal tract malformations (RTM) that are incompatible with a healthy life. While some o ...
Voir le projet

 8

 TERMINÉ 
The Gluco-Psychosocial Axis (GPA) concerns the interplay of factors determining glucose metabolism and insulin sensitivity and the neuroendocrine response resulting from exposure to psychosocial stress. A sub-optimal GPA influences the development of type 2 diabetes and related impairments with varying degrees of interplay between genetics and early growth (particularly adiposity and cognitive fun ...
Voir le projet

 14

 TERMINÉ 

Development of 3D Histopathological Grading of Osteoarthritis (3D-OA-HISTO)

Date du début: 1 févr. 2014, Date de fin: 31 janv. 2019,

"Background: Osteoarthritis (OA) is a common musculoskeletal disease occurring worldwide. Despite extensive research, etiology of OA is still poorly understood. Histopathological grading (HPG) of 2D tissue sections is the gold standard reference method for determination of OA stage. However, traditional 2D-HPG is destructive and based only on subjective visual evaluation. These limitations induce ...
Voir le projet

 1

 TERMINÉ 

Grey and green in Europe: elderly living in urban areas (GRAGE)

Date du début: 1 déc. 2014, Date de fin: 30 nov. 2018,

The EU has to face many challenges in achieving a more balanced regional development and sustainable economic recovery. Many of those challenges have to do with the ageing population trend, urbanization and environment under distress. More liveable and efficient communities is a target to be reached in Europe, where the “silver hair” trends can become a challenging opportunity, from a social, econ ...
Voir le projet

 11

 TERMINÉ 

BIM4PLACEMENT European key competences in building and construction

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2018,

Building Information Modelling (BIM) can be defined as a process involving the generation and management of digital representations of physical and functional characteristics of places. BIM softwares are used to plan, design, construct, operate and maintain many kinds of buildings and infrastructures. In Europe BIM is becoming more and more studied in VET schools, VET courses and university course ...
Voir le projet

 6

 TERMINÉ 
Erasmus+ Programme aims to increase skills and employability, as well as in implementing innovations in the field of education and training, and support transnational partnerships. In particular "Cooperation for innovation and the exchange of good practices" is focused on collaborative projects aimed at development, sharing and transfer best practices and innovative approaches in the fields of edu ...
Voir le projet

 8

 TERMINÉ 
IbD® will create a holistic platform for facilitating process intensification in processes in which solids are an intrinsic part, the cornerstone of which will be an intensified-by-design® (IbD). The IbD approach is hinged on the use of robust data about a process to ‘redesign’, modify, adapt and alter that process in a continuous, intensified system, and will be the new paradigm in the intensific ...
Voir le projet

 23

 TERMINÉ 
The 5G CHAMPION project ambitions to deliver the first 5G system proof-of-concept in conjunction with the 2018 South Korean Winter Olympics. Key novel 5G building blocks will be developed and implemented into a new architectural approach providing an efficient end-to-end system performance encompassing cutting edge 5G radio-access, core-network and satellite technologies.It will be the first time ...
Voir le projet

 10

 TERMINÉ 
In recent years, various energy harvesting techniques have been realised to overcome shortcoming of batteries in terms of lifespan, overall cost-effectiveness and chemically safe electronics. Energy harvesters convert different forms of environmental energies into electricity thus making devices self-powered. However, with over a decade’s development, energy harvesters have not been able to overta ...
Voir le projet

 1

 TERMINÉ 

Quantum-Statistical Methods for Nuclear Singlet States in Complex Fluids (QUNS)

Date du début: 14 mars 2016, Date de fin: 13 mars 2018,

Nuclear magnetic resonance (NMR) and magnetic resonance imaging (MRI) are supremely important techniques with widespread applications in chemistry, physics and medicine. NMR methodology has until recently been limited by the time constant T1 for the decay of nuclear spin magnetization back to thermal equilibrium. Long-lived nuclear singlet states (LLS) have been shown to overcome this limit with a ...
Voir le projet

 1

 TERMINÉ 

Robotics Coordination Action for Europe Two (RockEU2)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2018,

The FP7 coordination action RockEU has been extremely successful in building a strong European robotics community, leading to the creation of euRobotics aisbl - the private partner of the SPARC PPP and development of the Strategic Research Agenda and the Multi-Annual Roadmap, which are the main guidelines for shaping European robotics R&D&I.RockEU2 builds on and extends this successful community i ...
Voir le projet

 17

 TERMINÉ 

Peer to Peer Smart Energy Distribution Networks (P2P-SmartTest) (P2P-SmarTest)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

P2P-SmartTest project investigates and demonstrates a smarter electricity distribution system integrated with advanced ICT, regional markets and innovative business models. It will employ Peer-to-Peer (P2P) approaches to ensure the integration of demand side flexibility and the optimum operation of DER and other resources within the network while maintaining second-to-second power balance and the ...
Voir le projet

 9

 TERMINÉ 

Researchers Changing Society (CHANGE)

Date du début: 1 mai 2016, Date de fin: 31 déc. 2017,

The CHANGE project aims to foster collaboration between the public and researchers in Finland in order to improve our everyday life in a rapidly changing world. This project brings together 9 universities, 1 research institute and two expert organisations for science communication. It spans many facets of research in Finland and covers numerous individual researchers with diverse backgrounds and r ...
Voir le projet

 11

 TERMINÉ 
In European Union approximately 5 million people suffer from psychotic disorders. Between 30-50% can be considered resistant to treatment, and 10-20% ultra-resistant. These patients present persistent positive symptomatology, require extensive periods of hospital care, and have a greater risk of excess mortality and multi-morbidity. In addition, a high proportion of the total cost for treating sch ...
Voir le projet

 15

 TERMINÉ 

Printed Electroceramics with Ultimate Compositions (ULTIMATE CERAMICS)

Date du début: 1 févr. 2012, Date de fin: 31 oct. 2017,

The ultimate goal of this research is to make extremely advanced leap enabling processing of wide variety of ceramic materials at ultra low temperatures denoted as ULTIMATE CERAMICS(200-500 oC). The project has its risks, but advantages like utilization of pure ceramic materials on challenging substrates like plastic and paper could offer novel scientific results as well as business opportunities ...
Voir le projet

 1

 TERMINÉ 
"The objective is to deliver a trans-European network of industrially oriented specialists fully trained in the development and application of microbioreactor (MBR) technology to support development of innovative bio-based manufacturing processes. The specialistis will be trained by leaders in the field and with state of the art equipment and methodologies. MBRs are a promising tool for screening ...
Voir le projet

 13

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2016, Date de fin: 30 sept. 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 
An estimated 500.000 sudden cardiac deaths (SCD) occur each year in the European Union. Patients at risk for SCD may benefit from prophylactic treatment with an implantable cardioverter-defibrillator (ICD). ICD implantations have dramatically increased in recent years leading to multi-billion Euros of costs with significant regional disparities across Europe. Information on risks, benefits and cos ...
Voir le projet

 27

 TERMINÉ 

intelligent Knowledge-as-a-Service Platform (iKaaS)

Date du début: 1 oct. 2014, Date de fin: 30 sept. 2017,

iKaaS – (intelligent Knowledge-as-a-Service) Platform, will develop an intelligent, privacy preserving and secure Smart City Platform based on a Big Data resource and an analytics engine built atop heterogeneous cloud platforms with data collected from a variety of sensors from Internet of Things (IoT) environments deployed as mobile terminals, smart devices, and smart homes. We envisage that thes ...
Voir le projet

 9

 TERMINÉ 
EURenOmics will integrate several established consortia devoted to rare kidney diseases with eminent need and potential for diagnostic and therapeutic progress (i.e. steroid resistant nephrotic syndrome, membranous nephropathy, tubulopathies, complement disorders such a haemolytic uraemic syndrome, and congenital kidney malformations). The Consortium has access to the largest clinical cohorts asse ...
Voir le projet

 29

 TERMINÉ 

Experimental Nuclear Magneto-Optic Spectroscopy (NMOSPEC)

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2017,

This project aims at building a world-unique instrument for measuring novel nuclear magneto-optic spectroscopy (NMOS) phenomena. In NMOS, the differential optical response to polarized nuclear spins is probed. The project aims at observing effects both in the dispersive spectral range, such as Nuclear Spin-induced Cotton-Mouton effect in strong magnetic field (NSCM-B) and Nuclear Quadrupole-induce ...
Voir le projet

 1

 TERMINÉ 

European Conferences on Networks and Communications (EuCNC) (EuConNeCts 2)

Date du début: 1 mars 2015, Date de fin: 31 août 2017,

It is the purpose of EuConNeCts 2, a Supporting Action, to organise the following 2 editions, 2016 and 2017, of the EC sponsored conference in the area of communication networks and systems (EuCNC - European Conference on Networks and Communications). EuCNC will serve as a technical and scientific conference for researchers, namely European ones, to show their work in the area of Telecommunicatio ...
Voir le projet

 4