Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The vision of EU-ToxRisk is to drive a paradigm shift in toxicology towards an animal-free, mechanism-based integrated approach to chemical safety assessment. The project will unite all relevant disciplines and stakeholders to establish: i) pragmatic, solid read-across procedures incorporating mechanistic and toxicokinetic knowledge; and ii) ab initio hazard and risk assessment strategies of chemi ...
Voir le projet

 43

 TERMINÉ 

ACTivating InnoVative IoT smart living environments for AGEing well (ACTIVAGE)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2020,

ACTIVAGE is a European Multi Centric Large Scale Pilot on Smart Living Environments. The main objective is to build the first European IoT ecosystem across 9 Deployment Sites (DS) in seven European countries, reusing and scaling up underlying open and proprietary IoT platforms, technologies and standards, and integrating new interfaces needed to provide interoperability across these heterogeneous ...
Voir le projet

 50

 TERMINÉ 

Optimising Agricultural Land Use to Mitigate Climate Change (OPAL-Life) (OPAL-Life)

Date du début: 1 sept. 2015, Date de fin: 31 mars 2020,

Background Emissions of nitrous oxide (N2O) and methane (CH4) from agricultural production and carbon dioxide (CO2) from agricultural land use constitute some 20% of the total greenhouse gas (GHG) emissions of Finland. According to the Climate Convention and Kyoto Protocol, the European Union has committed to reduce its GHG emissions. In Finland, reducing ...
Voir le projet

 7

 TERMINÉ 
The present situation of nuclear energy in Europe asks for a continuing effort in the field of Education and Training aimed to assure a qualified workforce in the next decades. In this scenario, the present proposal is aimed at enhancing and networking the Europe-wide efforts initiated in the past decades by different organisations belonging to academia, research centres and industry to maintain a ...
Voir le projet

 25

 TERMINÉ 

Future Sky Safety

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2018,

The EC Flight Path 2050 vision aims to achieve the highest levels of safety to ensure that passengers and freight as well as the air transport system and its infrastructure are protected. However, trends in safety performance over the last decade indicate that the ACARE Vision 2020 safety goal of an 80% reduction of the accident rate is not being achieved. A stronger focus on safety is required. T ...
Voir le projet

 32

 TERMINÉ 
...oeconomic implications will be assessed and policy relevant information will be communicated to policy makers and the public through a dedicated office for communication, stakeholder contact and international co-operation.
Voir le projet

 30

 TERMINÉ 

Joint Programs and Framework for Doctoral Education in Software Engineering

Date du début: 15 oct. 2015, Date de fin: 14 oct. 2018,

The software engineering (SE) is a young discipline introduced in 1968. The first educational SE programs were accredited in 2003, the body of knowledge for the SE was accepted as an international standard in 2005, and in 2010 only about 60 universities in the US offered SE programs. According to the United States Bureau of Labor Statistics, the job growth rate ranges from 38% to 56% across the co ...
Voir le projet

 11

 TERMINÉ 
The goal of the TRUST Project is to catalyse a global collaborative effort to improve adherence to high ethical standards around the world. Achieving equity in international research is one of the pressing concerns of the 21st century. Many international groups and organisations are working on governance frameworks and standards to guide research activities after progressive globalization. Howeve ...
Voir le projet

 13

 TERMINÉ 

History of Nuclear Energy and Society (HoNESt)

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

...t debate on future energy sources and the transition to affordable, secure, and clean energy production.Civil society's interaction with nuclear developments changes over time, and it is locally, nationally and transnationally specific. HoNESt will embrace the complexity of political, technological and economic challenges; safety; risk perception and communication, public engagement, media framing ...
Voir le projet

 26

 TERMINÉ 

Enhancing ecoSysteM sERvices mApping for poLicy and Decision mAking (ESMERALDA)

Date du début: 1 févr. 2015, Date de fin: 31 juil. 2018,

...ents in relation to the requirements for planning, agriculture, climate, water and nature policy. This methodology will build on existing ES projects and databases (e.g. MAES, OpenNESS, OPERAs, national studies), the Millennium Assessment (MA) and TEEB. ESMERALDA will identify relevant stakeholders and take stock of their requirements at EU, national and regional levels. The objective of ESMERALDA ...
Voir le projet

 25

 TERMINÉ 
AFLoNext is a four year EC L2 project with the objective of proving and maturing highly promising flow control technologies for novel aircraft configurations to achieve a quantum leap in improving aircraft’s performance and thus reducing the environmental footprint. The project consortium is composed by forty European partners from fifteen countries. The work has been broken down into seven work p ...
Voir le projet

 41

 TERMINÉ 

Smart Nano-objects for Alteration of Lipid-bilayers (SNAL)

Date du début: 1 avr. 2014, Date de fin: 31 mars 2018,

"SNAL is a multidisciplinary programme specially designed to provide scientific and transferable skill training and career development for early stage researchers and experienced researchers in membrane research. Working in a multidisciplinary network will give the researchers a broad perspective on their research field as well as the basic ability of pursuing a research project from basic science ...
Voir le projet

 10

 TERMINÉ 
... aimed at contribution to current reform of Ukrainian system of QA in higher education. The consortium plans to solve the following problems and needs that are crucial for the partner country both at national and institutional levels:-Need in tools ensuring effective functioning of internal and external QA systems-Need in capacity building of HEIs and national QA body through training of staff to ...
Voir le projet

 18

 TERMINÉ 

"Training in neurodegeneration, therapeutics intervention and neurorepair" (TINTIN)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

"Dopamine neurons play a central role in major illnesses, such as anxiety and mood disorders, schizophrenia, autism-spectrum disorders, Parkinson’s disease, epilepsy, and dementia. A multidisciplinary approach must be taken by European researchers to discover the molecular basis of dopamine neurodegeneration and how new technologies will lead to repair and regeneration of neuronal systems in the b ...
Voir le projet

 8

 TERMINÉ 
Compulsivity is characterized by a repetitive, irresistible urge to perform a behavior, the experience of loss of voluntary control over this intense urge, the diminished ability to delay or inhibit thoughts or behaviors, and the tendency to perform repetitive acts in a habitual or stereotyped manner. Compulsivity is a cross-disorder trait underlying phenotypically distinct psychiatric disorders t ...
Voir le projet

 13

 TERMINÉ 

TransAfrican Network Development (TANDEM)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2017,

...ld to the socio-economic development of the West and Central African Region. To this end, TANDEM is structured around three objectives:1. Enhance the dialogue between WACREN and policy makers, international donors and regulating authorities, in order to promote connectivity and obtain political and financial support;2. Enhance the dialogue between WACREN, end users, national research and education ...
Voir le projet

 9

 TERMINÉ 
BUTERFLI is a project in response to the invitation to tender from European Commission FP7 within Call FP7-AAT-2013 RTD-Russia.BUTERFLI is the acronym of BUffet and Transition delay control investigated within Europe-Russia cooperation for improved FLIght performances. The Project Topic will focus on experimental and numerical flow control investigations of different phenomena: the buffet on a lam ...
Voir le projet

 13

 TERMINÉ 

Integrated Approaches to Food Allergen and Allergy Risk Management (IFAAM)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

Up to 20 million European citizens suffer from food allergy. However management of both food allergy (by patients and health practitioners) and allergens (by industry) is thwarted by lack of evidence to either prevent food allergy developing or protect adequately those who are already allergic. iFAAM will develop evidence-based approaches and tools for MANAGEMENT of ALLERGENS in FOOD and integrate ...
Voir le projet

 46

 TERMINÉ 

High Altitude Ice Crystals (HAIC)

Date du début: 1 août 2012, Date de fin: 31 janv. 2017,

... 34 partners representing the European stakeholders of the aeronautical industry from eleven European countries and 5 partners from Australia, Canada and the United States.HAIC will also develop international cooperation and collaboration thanks to the involvement of key international organisations and companies as partners of the project or through the HAIC Advisory Board.Letters of support from ...
Voir le projet

 40

 TERMINÉ 
... ALFRED project, mainly to what concerns E&T, supporting Infrastructures and Regulatory aspects (and integrating – for the R&D needs – the outcomes of other research projects in a common frame of National and Regional needs); on the other hand, it investigates the existing National and Regional supporting structures – with a particular attention to the ones in Romania and in all the participating ...
Voir le projet

 28

 TERMINÉ 

STI International Cooperation Network for Central Asian Countries (INCONET CA)

Date du début: 11 sept. 2013, Date de fin: 10 sept. 2016,

The project aims to support the advancement of the bi-regional STI policy dialogue between the EU MS/AC and the Central Asian countries, with an explicit focus on the Societal Challenges that have been identified to be of mutual interest for the two regions, namely Climate Change, Energy and Health. In particular the project will identify actions and stakeholders and will implement innovative pilo ...
Voir le projet

 18

 TERMINÉ 
The main objective of RESEARCH project is the definition of an electrical architecture for Flight Control System capable of controlling a flight control surface on an Aircraft with the help of electrically operated actuators, thus replacing the hydraulic actuators commonly used in current Aircraft designs.This architecture will be designed with the main objective of being electrical, as this is th ...
Voir le projet

 7

 TERMINÉ 
Each year more than 63,000 new cases of kidney cancer are diagnosed in the European Union. Approx. 50% of all patients have metastasized renal cell cancer (mRCC) at presentation or develop metastases during follow-up. 5-year relative survival of mRCC has been extremely poor: between 5 and 10%. In the past few years, so-called targeted therapies that suppress angiogenesis have changed the clinical ...
Voir le projet

 15

 TERMINÉ 
OPTiMiSE (OPtimization of Treatment and Management of Schizophrenia in Europe) will focus on two goals: optimising current treatments in Schizophrenia and explore novel therapeutic options for schizophrenia. The project intends to both address basic, but so far unanswered, questions in the treatment of schizophrenia and develop new and experimental interventions. It is expected that the project wi ...
Voir le projet

 25

 TERMINÉ 

Safety of ACtinide Separation proceSSes (SACSESS)

Date du début: 1 mars 2013, Date de fin: 30 juin 2016,

"Nuclear power plays a key role in limiting EU’s greenhouse gases emissions, and makes an important contribution to improve European Union’s independence, security and diversity of energy supply. However, its social acceptance is closely linked to an enhanced safety in the management of long-lived radioactive waste contributing to resource efficiency and cost-effectiveness of this energy and ensur ...
Voir le projet

 26

 TERMINÉ 

Attention Deficit Hyperactivity Disorder Drugs Use Chronic Effects (ADDUCE)

Date du début: 1 nov. 2010, Date de fin: 30 avr. 2016,

Attention deficit hyperactivity disorder (ADHD) is one of the most common neurodevelopmental disorders in children, affecting approximately 5% children in Europe. Methylphenidate (MPH) is the most-commonly prescribed medication for ADHD children; it is also increasingly used in ADHD adults. In 2007, the European Commission requested a referral to the Committee for Medicinal Products for Human Use ...
Voir le projet

 17

 TERMINÉ 

PLANT AND FOOD BIOSECURITY (PLANTFOODSEC)

Date du début: 1 févr. 2011, Date de fin: 31 janv. 2016,

...ioweapons programmes.In the mean time, natural outbreaks of diseases demonstrate the destructive potential of an agroterroristic attack.Recent trends in biosecurity recommend a shift from a largely national approach to biosecurity towards greater international cooperation. Current capabilities to detect and respond to agroterrorism are limited and spread among many organizations, with a correspond ...
Voir le projet

 14

 TERMINÉ 

Tourism Paths of the Black Sea Region (BSB-TOUR)

Date du début: 31 déc. 2013, Date de fin: 30 déc. 2015,

The overall objective of the project is to establish a strong cooperation between the partners' organizations from different social, economical and regional aspect countries in order to achive economic, social and tourism development based on common resources. Achievements: ...
Voir le projet

 9

 TERMINÉ 

Aviation Noise Research Network and Coordination (X-NOISE EV)

Date du début: 1 déc. 2010, Date de fin: 30 nov. 2015,

The X-NOISE EV Coordination Action, through its network structure and comprehensive workplan involving experts groups, scientific workshops, international cooperation seminars and a common information system, addresses the noise challenges faced by Aviation. To this end, it will more specifically:- Evaluate EU-funded projects results and assess their contribution to the state-of-the-art.- Formulat ...
Voir le projet

 28

 TERMINÉ 

Access to cultural heritage networks for Europeana (AthenaPlus)

Date du début: 1 mars 2013, Date de fin: 31 oct. 2015,

...her cultural institutions in their work to making available digital content through Europeana.The best practice network created by AthenaPlus (41 partners from 21 Member States countries and 1 International Observer) is in a strategic position to address this challenge, due to: its high institutional value (hundreds of European institutions are involved or associated with the project); the large a ...
Voir le projet

 41

 TERMINÉ 
The overall scope of the DAPhNE project is to develop and demonstrate a package of integrated solutions for energy intensive processes (ceramics, cement and glass), based on tuning micro-wave technologies to the material characteristics and on intelligent control systems, to provide real time information about the energy consumption as well as the product quality.Microwave heating is now a well e ...
Voir le projet

 18

 TERMINÉ 

Introducing diagnostic applications of ‘3Gb-testing’ in human genetics (3GB-TEST)

Date du début: 1 sept. 2013, Date de fin: 31 août 2015,

...impending change and potential impact on practice. The Consortium will inform the healthcare community and make recommendations to the European Commission, the European Society of Human Genetics, and national organizations relevant to this field. A key output will be a validated roadmap for the implementation of diagnostic genome sequencing in Europe.
Voir le projet

 11

 TERMINÉ 

Smart Intelligent Aircraft Structures (SARISTU)

Date du début: 1 sept. 2011, Date de fin: 31 août 2015,

The project proposal concerns the challenges posed by the physical integration of smart intelligentstructural concepts. It addresses aircraft weight and operational cost reductions as well as animprovement in the flight profile specific aerodynamic performance.This concerns material concepts enabling a conformal, controlled distortion of aerodynamicallyimportant surfaces, material concepts enablin ...
Voir le projet

 68

 TERMINÉ 
The aim of the project was to enable a cohesive, post high school, Northern European education for Decontamination and CSSD staff (Central Sterile Supply Dept.)The objective was to establish a mutual syllabus and curriculum for a formal VET for Decontamination and CSSD staff. The consortium consisted of participants from the Sterilization Associations, Infection Control Departments and Educational ...
Voir le projet

 10

 TERMINÉ 

Suicidality: Treatment Occurring in Paediatrics (STOP)

Date du début: 1 nov. 2010, Date de fin: 30 avr. 2015,

The emergence of suicidality in patients receiving drug treatment is of concern because of the overall burden and the possible link with completed suicide. The lack of uniform requirements for defining, detecting and recording suicidality and the presence of disease related confounders create major problems. It is possible that Medication-Related Suicidality (MRS) differs from Psychopathology-Rela ...
Voir le projet

 19

 TERMINÉ 
...ills required to deliver a program of research that meets all the call’s requirements and who have access to / will collect a number of unique European samples. The partners in EU-GEI represent the nationally funded schizophrenia / mental health networks of the UK, Netherlands, France, Spain, Turkey and Germany as well as other partners.
Voir le projet

 27

 TERMINÉ 

Paediatric European Risperidone Studies (PERS)

Date du début: 1 mai 2010, Date de fin: 30 avr. 2015,

"Second-generation antipsychotics are increasingly being prescribed to children and adolescents. Their use, however, is mostly off-label, and adequate and sufficient data about efficacy and particular safety are lacking. This proposal focuses on two indications, the use of risperidone in children and adolescents with conduct disorder who are not mentally retarded, and the use of risperidone in ado ...
Voir le projet

 22

 TERMINÉ 

A Roadmap for Mental Health Research in Europe (ROAMER)

Date du début: 1 oct. 2011, Date de fin: 31 mars 2015,

"On the regional level, Europe has one of the highest levels of resources for mental health care. Despite this, the high burden and impact of mental disorders in Europe is expected to rise. “ROAdmap for Mental health Research” (ROAMER) is designed to develop a comprehensive, consensus-based roadmap to promote and integrate mental health and well-beingresearch in Europe. Research advances and innov ...
Voir le projet

 15

 TERMINÉ 

Small-molecule Inhibitor Leads Versus emerging and neglected RNA viruses (SILVER)

Date du début: 1 oct. 2010, Date de fin: 31 mars 2015,

... on promising compounds or compound classes will be presented to the interested pharmaceutical industry. The SILVER consortium will be well placed to play a major role in contributing to the international effort to develop strategies to improve world health.
Voir le projet

 25

 TERMINÉ 
"This project aims at Improving Human Health and Animal Production in developing countries through Integrated Control of Neglected Zoonoses in animals, based on Scientific Innovation and Public Engagement. Neglected zoonoses, such as anthrax, rabies, brucellosis, bovine TB, zoonotic trypanosomiasis, echinococcosis, cysticercosis and leishmaniasis, are major causes of ill-health in developing coun ...
Voir le projet

 23