Rechercher des projets européens

24 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
...ception and risk communication concerning microbial influences in geological disposal, will improve awareness of microbial issues on a broader level. The programme will help the EU claim international leadership in the understanding of the impact of microbial processes on geodisposal, and indeed other technological areas pertinent to the exploitation of the subsurface.
Voir le projet

 15

 TERMINÉ 

Helix Nebula – The Science Cloud (HNSciCloud)

Date du début: 1 janv. 2016, Date de fin: 30 juin 2018,

... project will bring Europe’s technical development, policy and procurement activities together to remove fragmentation and maximise exploitation. The alignment of commercial and public (regional, national, and European) strategies will increase the rate of innovation. Through a competitive series of design, prototype and pilot steps, HNSciCloud will contract suppliers to deliver a 5% scale deploym ...
Voir le projet

 11

 TERMINÉ 

Robotic Manipulation for Nuclear Sort and Segregation (RoMaNS)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

...he-art understanding of mixed initiative planning, variable autonomy and shared control approaches.4) Deliver a TRL 6 demonstration in an industrial plant-representative environment at the UK National Nuclear Lab Workington test facility.
Voir le projet

 6

 TERMINÉ 

solving CHAllenges in Nuclear DAta (CHANDA)

Date du début: 1 déc. 2013, Date de fin: 30 nov. 2017,

"The CHANDA project main objective is to address the challenges in the field of nuclear data for nuclear applications and its acronym stands for solving CHAllenges in Nuclear DAtaThe project will prepare a proposal for an organization that will coordinate the nuclear data research program, and the infrastructures and capabilities of the EU Member States in a stable structure, well integrated with ...
Voir le projet

 35

 TERMINÉ 

European Supply of SAfe NUclear Fuel (ESSANUF)

Date du début: 1 sept. 2015, Date de fin: 31 oct. 2017,

The overall aim of the project is to create greater security of energy supply and contribute to the security of supply of nuclear fuel for Russian designed pressurized water reactors (VVER) operating in the EU by diversification of fuel sources in the short / medium term and in full compliance with nuclear safety standards. By that, the project addresses the topic NFRP 16 – 2015. The scientific ob ...
Voir le projet

 10

 TERMINÉ 

Materials’ Innovations for a Safe and Sustainable nuclear in Europe (MATISSE)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2017,

...II systems, Oxide Dispersed Strengthened steels, refractory composites for the high temperature applications, development of predictive capacities. MatISSE will foster the link between the respective national research programmes through networking and integrating activities on material innovations for advanced nuclear systems, sharing partners best practices and setting-up efficient communication ...
Voir le projet

 32

 TERMINÉ 

Preparing ESNII for HORIZON 2020 (ESNII plus)

Date du début: 1 sept. 2013, Date de fin: 31 août 2017,

...ensure the review of the different advanced reactor solutions.The project will involve private and public stakeholders, including industry, research and academic communities, with opened door to international collaboration, involving TSO.
Voir le projet

 37

 TERMINÉ 
...the project partners will define a programmatic plan, insuring that the demonstrators can be built, tested, and reach the established ambitious objectives, this with a clear organization between international partners and with costs shared in a sustainable way. DEMOCRITOS aims to form a cluster around NEP related technologies by organizing an international workshop and invite external stakeholders ...
Voir le projet

 8

 TERMINÉ 

Preparing NUGENIA for HORIZON2020 (NUGENIA-PLUS)

Date du début: 1 sept. 2013, Date de fin: 30 sept. 2016,

...integrate European research on safety of the Gen II and III nuclear installations in order to better ensure their safe long term operation, integrating private and public efforts, and initiating international collaboration that will create added value in its activity fields.The project consists of two parts, the first part being a Coordination and Support Action and the second part a Collaborative ...
Voir le projet

 52

 TERMINÉ 

MyrrhA Research Infrastructure Support Action (MARISA)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

... overall coordination of the MYRRHA projects will be defined and developed.• Strategic and consortium planning. As part of this work package, a roadmap will be developed for integrating different national and international initiatives in support of the MYRRHA development.• Legal aspects. In the framework of the MARISA project, the appropriate legal framework for the MYRRHA undertaking will be iden ...
Voir le projet

 17

 TERMINÉ 

Advanced fuelS for Generation IV reActors: Reprocessing and Dissolution (ASGARD)

Date du début: 1 janv. 2012, Date de fin: 30 juin 2016,

Nuclear power issues have been attracting research interest for decades even since the actual use of power reactors using oxide fuels was considered a mature science. It has mainly been due to one of the great drawbacks of nuclear power, the waste handling. Presently, there is a renaissance in nuclear power research focused on a new generation of reactor concepts utilising more of the inherent ene ...
Voir le projet

 16

 TERMINÉ 

Safety of ACtinide Separation proceSSes (SACSESS)

Date du début: 1 mars 2013, Date de fin: 30 juin 2016,

"Nuclear power plays a key role in limiting EU’s greenhouse gases emissions, and makes an important contribution to improve European Union’s independence, security and diversity of energy supply. However, its social acceptance is closely linked to an enhanced safety in the management of long-lived radioactive waste contributing to resource efficiency and cost-effectiveness of this energy and ensur ...
Voir le projet

 26

 TERMINÉ 

Cooperation in education and training In Nuclear CHemistry (CINCH-II)

Date du début: 1 juin 2013, Date de fin: 31 mai 2016,

...n and training needs, including the high-level training of research workers, of the European Union.The CINCH-II consortium includes partners from all key European nuclear countries; both academia and national nuclear laboratories are represented, supported by an “outer shell” of Associated Partners. Networking on the national level and with existing platforms in Europe, such as the ENEN, as well a ...
Voir le projet

 11

 TERMINÉ 
...CTINET-6 and ACTINET-I3, TALISMAN will foster the networking between existing European infrastructures in actinide sciences open them widely to any European scientists by offering and supporting transnational access to unique facilities.To meet its objectives, TALISMAN will animate and organize a network of actinide facilities across the EU that will increase our knowledge for a safer management o ...
Voir le projet

 12

 TERMINÉ 
...ion in Europe, Russia, and the USA. On the other hand, this technological development requires important financial efforts. Such a development should thus take place in the frame of an international collaboration as this has been the case, e.g. for the International Space Station. Among concepts that allow going to Mars are the very high power chemical propulsion or the nuclear propulsion. Megawat ...
Voir le projet

 6

 TERMINÉ 

Validation of Numerical Engineering Simulations: Standardisation Actions (VANESSA)

Date du début: 1 févr. 2013, Date de fin: 31 juil. 2014,

Engineering simulation is an essential feature of the design and manufacture of all engineered products at all scales. However such simulations are not routinely validated, at least in part because technology for rapid, cost-effect validations has not been available. Two previous projects, SPOTS and ADVISE have led to the development of appropriate technology. The goal of the VANESSA project is t ...
Voir le projet

 8

 TERMINÉ 

Accurate Nuclear Data for nuclear Energy Sustainability (ANDES)

Date du début: 1 mai 2010, Date de fin: 31 oct. 2013,

"According to the recent publications of the European Technological Platform for a Sustainable Nuclear Energy (SNETP) (Vision report and Strategic Research Agenda) the sustainability require the combination of the present LWR, future Advanced Fast reactors and the waste minimization in closed cycles with Partitioning and Transmutation. To implement these new nuclear systems and their fuel cycles i ...
Voir le projet

 21

 TERMINÉ 

New MS Linking for an Advanced Cohesion in Euratom Research (NEWLANCER)

Date du début: 1 nov. 2011, Date de fin: 31 oct. 2013,

...to identify and implement effective and efficient actual solutions leading to enlarged NMS involvement in future Euratom Framework Programmes by strengthening and catalyzing the full R&D potential at national level, by increasing cohesion between New Member States institutions, and by improving their cooperation with Old Member States research centres.The specific sub-objectives of the project are ...
Voir le projet

 19

 TERMINÉ 

Severe Accident Research Network of Excellence 2 (SARNET2)

Date du début: 1 avr. 2009, Date de fin: 31 mars 2013,

...courses on severe accidents for students and researchers, and training courses for specialists; - Promoting personnel mobility amongst various European organizations; - Organizing yearly a large international conference on Severe Accident research (ERMSAR). After the first phase (2004-2008), and the four-year proposed second phase, co-funded by the EC, the network will evolve toward self-sustainab ...
Voir le projet

 45

 TERMINÉ 
"Gas-Cooled Reactors (GCR), RBMK and some Material Test Reactors (MTR) make use of graphite as moderator of the fuel, structures of the core and/or thermal columns. During operation, the graphite and other carbonaceous materials like carbon brick, pyrocarbon and silicon carbide coatings are contaminated by fission products and neutron activation. These irradiated carbonaceous wastes are problemati ...
Voir le projet

 30

 TERMINÉ 
The objective of the proposal is based on the outcome of PATEROS CA to assess more in depth the regional approach to P&T implementation. It will respond to one of the key-topics put forward by the Strategic Research Agenda of SNETP. The project intends to look at the economical aspects of the most realistic scenario for P&T with the hypothesis: limit the MA bearing fuel transport and limit the MA ...
Voir le projet

 11

 TERMINÉ 

European Gas Cooled Fast Reactor (GoFastR)

Date du début: 1 mars 2010, Date de fin: 28 févr. 2013,

Fast reactors have the unique ability to be sustainable by, not only being able to generate their own fuel, but through being able to burn minor actinides to reduce the quantity and radiotoxicity of nuclear wastes. The latter ability enables fast reactors to not only burn the minor actinides produced by themselves but, in addition, the minor actinides arising from legacy wastes and thermal reactor ...
Voir le projet

 22

 TERMINÉ 

Cooperation in education In Nuclear CHemistry (CINCH)

Date du début: 1 févr. 2010, Date de fin: 31 janv. 2013,

The renaissance of nuclear power will require a significant increase of the numbers of the respective specialists, among others also nuclear chemists. Because the current situation in nuclear chemistry education and training in Europe is quite diverse, the project aims at its coordination. The system developed should enable formation of a long-term Euratom Fission Training Scheme (EFTS) providing ...
Voir le projet

 8

 TERMINÉ 

Actinide reCycling by SEParation and Transmutation (ACSEPT)

Date du début: 1 mars 2008, Date de fin: 30 sept. 2012,

"Actinide recycling by separation and transmutation is considered worldwide and particularly in several European countries as one of the most promising strategies to reduce the inventory of radioactive waste, thus contributing to make nuclear energy sustainable. Consistently with potentially viable recycling strategies, the Collaborative Project ACSEPT will provide a structured R&D framework to de ...
Voir le projet

 35