Rechercher des projets européens

31 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The EU population is increasingly exposed to new physical and chemical agents in the environment, some of which may be detrimental to public health. Of these, electromagnetic fields (EMF) are one of the most ubiquitous, with new EMF technologies and novel applications being actively developed and commercialised. To address pertinent questions on EMF and health, GERoNiMO proposes an integrated appr ...
Voir le projet

 27

 TERMINÉ 
The Partnership for Modernisation between the European Union and Russia states as one of the priority areas to enhance cooperation in innovation, research and development. In this context the 24 consortium members of ERA.Net RUS Plus propose to implement a Single Joint Call for transnational and scientifically excellent research projects in the fields of Nanotechnologies/Materials/Production Techn ...
Voir le projet

 33

 TERMINÉ 
A new EU 7th Framework Programme project, “LEANWIND” (Logistic Efficiencies And Naval architecture for Wind Installations with Novel Developments) seeks to apply lean principles to the offshore wind farm project lifecycle. The primary LEANWIND objective is to provide cost reductions across the offshore wind farm lifecycle and supply chain through the application of lean principles and the developm ...
Voir le projet

 32

 TERMINÉ 

VitaminD3-Omega3-Home Exercise- HeALTHy Ageing and Longevity Trial (DO-HEALTH)

Date du début: 1 janv. 2012, Date de fin: 30 juin 2017,

As the European population is ageing rapidly, the growing number of seniors with age-related chronic diseases poses a challenge on European societies and health care systems. Therapeutic interventions that are effective, affordable and well-tolerated in the prevention of chronic disease are urgently needed and will have an outstanding impact on public health as a whole. Among the most promising in ...
Voir le projet

 25

 TERMINÉ 
SEA-EU-NET 2 will build upon and leverage strong EU-SEA S&T relationships developed through past support and coordination actions, to deepen engagement and build momentum in S&T cooperation. It broadens the scope of EU-SEA cooperation through stimulating sustainable innovation collaborations. SEA-EU-NET 2 will focus on three societal challenges: Health, Food security and safety, and Water manageme ...
Voir le projet

 23

 TERMINÉ 

Reconfigurable ROS-based Resilient Reasoning Robotic Cooperating Systems (R5-COP)

Date du début: 1 févr. 2014, Date de fin: 31 mars 2017,

European manufacturing industry faces increasing product variances resulting as a consequence of frequent innovation, short product lifecycles, small series production, and shrinking production cycles. At the same time, production cost must be continuously reduced.Agile, transformable and re-usable automation and robotics is be a key enabler to manage those trends. However, few robotic components ...
Voir le projet

 34

 TERMINÉ 

Increasing Value and Flow in the Marine Biodiscovery Pipeline (PHARMASEA)

Date du début: 1 oct. 2012, Date de fin: 31 mars 2017,

The PharmaSea project focuses on obstacles in marine biodiscovery research, development and commercialization and brings together a broad interdisciplinary team of academic and industry researchers and specialists to address and overcome these. The partners are ideally placed to demonstrate how to widen the bottlenecks and increase the flow of ideas and products derived from the marine microbiome ...
Voir le projet

 25

 TERMINÉ 
In 2007, heads of state and government from Africa and Europe launched the Joint Africa-EU Strategy (JAES) formulated in response to geopolitical changes, globalisation and the processes of integration in Africa and Europe. At the heart of the JAES is an overtly political relationship and among the features distinguishing JAES from previous Africa-Europe policy initiatives is the associated actio ...
Voir le projet

 27

 TERMINÉ 
The goal of METALOGUE is to produce a multimodal dialogue system that is able to implement an interactive behaviour that seems natural to users and is flexible enough to exploit the full potential of multimodal interaction. It will be achieved by understanding, controlling and manipulating system's own and users' cognitive processes. The new dialogue manager will incorporate a cognitive model bas ...
Voir le projet

 10

 TERMINÉ 
The importance of advanced simulation to the competitiveness of both large and small companies is well established. The principal objective of Fortissimo is to enable European manufacturing, particularly small to medium enterprises (SMEs), to benefit from the efficiency and competitive advantage inherent in the use of simulation. However, the simulation of, for example, high-pressure gas cylinders ...
Voir le projet

 96

 TERMINÉ 

From materials science and engineering to innovation for Europe (M-ERA.NET)

Date du début: 1 févr. 2012, Date de fin: 31 janv. 2016,

M-ERA.NET will be a real tool for developing a strong European RTD community on materials science and engineering and for supporting the European economy with respect to the challenges of the 21st century.M-ERA.NET will be a highly ambitious network involving a majority of European key players in national funding of materials science and engineering.M-ERA.NET will replace a number of smaller previ ...
Voir le projet

 40

 TERMINÉ 

Integrated non-CO2 Greenhouse gas Observing System (INGOS)

Date du début: 1 oct. 2011, Date de fin: 31 déc. 2015,

InGOS will support and integrate the observing capacity of Europe for non-CO2 greenhouse gases (NCGHG: CH4, N2O, SF6, H2 and halocarbons). The emissions of these gases are very uncertain and it is unknown how future climate change will feedback into the land use coupled emissions of CH4 and N2O. The NCGHG atmospheric abundances will increase further in the future and the emissions of these gases a ...
Voir le projet

 39

 TERMINÉ 
Insights gained in FI-PPP Phase 1 emphasize the need for novel ICT solutions that allow radical improvements for collaboration in business networks. Primary sectors demanding such solutions are Agri-Food and Transport & Logistics industries: several actors (incl. enterprises, authorities, service providers) need to exchange information & communicate across org. borders to conduct business. Current ...
Voir le projet

 39

 TERMINÉ 

Development of a bioartificial liver therapy in acute liver failure (BALANCE)

Date du début: 1 juin 2012, Date de fin: 31 mai 2015,

In BALANCE, the companies Hep-Art, Pharmacell and BioPredic join forces with academic partners Amsterdam Medical Centre and University of Edinburgh to offer Acute Liver Failure (ALF) patients a bioartificial liver-support system for bridging the waiting period for liver transplantation or recovery of the diseased liver.ALF is a highly lethal disorder and liver transplantation is the only life-savi ...
Voir le projet

 5

 TERMINÉ 

Novel Biocatalysts for the Production of Glycosides (NOVOSIDES)

Date du début: 1 déc. 2010, Date de fin: 30 nov. 2014,

This project aims to develop novel biocatalysts for the production of glycosides (NOVOSIDES). Glycosylated compounds have a wide range of applications, but very few enzymes are able to glycosylate small organic molecules cost-efficiently at the industrial scale. Therefore, glycosylation reactions catalysed by transglycosidases, glycoside phosphorylases and glycoside hydrolases will be explored in ...
Voir le projet

 6

 TERMINÉ 

Metastatic tumours facilitated by hypoxic tumour micro-environments (METOXIA)

Date du début: 1 févr. 2009, Date de fin: 31 juil. 2014,

"Recent research suggests that the hypoxic micro-environment of tumours is one of the major drivers of metastatic spread of cancer. Furthermore, hypoxic tumour micro-environments may result in treatment resistance of cancer cells, therefore causing a double effect of reducing the potential of a successful treatment of the cancer patient. This project seeks to clarify the roles and functions of the ...
Voir le projet

 21

 TERMINÉ 
The vision of E2ReBuild is to transform the retrofitting construction sector from the current craft and resource based construction towards an innovative, high-tech, energy efficient industrialised sector.E2ReBuild aims to- investigate, promote and demonstrate cost effective and advanced energy efficient retrofit strategies that create added value for existing apartment buildings and endorse end-u ...
Voir le projet

 21

 TERMINÉ 

Cooperative Cities extend and validate mobility services (Co Cities)

Date du début: 1 janv. 2011, Date de fin: 30 avr. 2014,

Current EU cooperative systems projects like CVIS, SAFESPOT & COOPERS have demonstrated technical feasibility and positive user acceptance of cooperative mobility services.In the In-Time project common traveller information services based on distributed regional data sources accessible via one commonly agreed data interface have been developed.These common mobility services include dynamic navigat ...
Voir le projet

 14

 TERMINÉ 
TailorCrete will initiate a transition from the rectangular monotony of today’s industrialised concrete buildings that dominate the European landscape, to new industrialised unique concrete structures without the need for expensive and labour-intensive manual construction processes. This will be achieved by developing new industrialised processes for concrete, and thus play a significant role in t ...
Voir le projet

 14

 TERMINÉ 

Semiconductor Equipment Assessment Leveraging Innovation (SEAL)

Date du début: 1 juin 2010, Date de fin: 30 sept. 2013,

Description Seal is an EC-funded project covering semiconductor equipment assessment to strengthen the European semiconductor equipment industry. SEAL is an integrated project consisting of 17 equipment assessment sub-projects in the area of semiconductor manufacturing equipment. The assessment th ...
Voir le projet

 39

 TERMINÉ 
"Photoprotection against excess absorbed light energy is an essential and universal attribute of oxygenic photosynthetic organisms. This requirement has been a strong force in the evolution of plants and micro-organisms, and a diverse range of solutions have arisen. It has determined survival, productivity and habitat preference, and it determines the ceiling on the efficiency of energy conversion ...
Voir le projet

 18

 TERMINÉ 
The Black Sea Catchment is internationally known as one of ecologically unsustainable development and inadequate resource management, which has led to severe environmental, social and economic problems. EnviroGRIDS @ Black Sea Catchment aims at building the capacities of regional stakeholders to use new international standards to gather, store, distribute, analyze, visualize and disseminate crucia ...
Voir le projet

 30

 TERMINÉ 
Medically related Life Sciences use the mouse as a model system to understand the molecular basis of health and disease in humans (>95% similarity of genes in humans and mice). An essential task for Biomedical Sciences in the 21st century will be the functional analysis of mouse models for every gene in the mammalian genome. The major bottlenecks identified by the user community will be proper ...
Voir le projet

 29

 TERMINÉ 

Distributed Dynamic Diversity Databases for Life (4D4Life)

Date du début: 1 mai 2009, Date de fin: 31 juil. 2012,

A coherent classification and species checklist of the world's plants, animals, fungi and microbes is fundamental for accessing information about biodiversity. The Catalogue of Life provides the world with a unique service: a dynamically updated global index of validated scientific names, synonyms and common names integrated within a single taxonomic hierarchy.The Catalogue of Life was initiated a ...
Voir le projet

 40

 TERMINÉ 

EUROPEAN DRUG INITIATIVE ON CHANNELS AND TRANSPORTERS (EDICT)

Date du début: 1 févr. 2008, Date de fin: 30 juin 2012,

"The European Drug Initiative on Channels and Transporters, EDICT, allies for the first time, partners with world-class expertise in both the structural and functional characterisation of membrane channels and transporters. State-of-the-art facilities and personnel for X-ray crystallography, Electron Microscopy and Nuclear Magnetic Resonance and the latest throughput technology, will provide infra ...
Voir le projet

 28

 TERMINÉ 
"The interstate integration of power grids provides multiple advantages concerning operation security, integration of renewable energy as well as energy trading. Due to this fact the UCTE interconnection expands continually since its establishment. Consideration is given to different scenarios of joint operation of UCTE and NORDEL with power grids on the territory of the former USSR. Due to the fa ...
Voir le projet

 22

 TERMINÉ 

Extend FRAMEwork architecture for cooperative systems (E-FRAME)

Date du début: 7 mai 2008, Date de fin: 6 nov. 2011,

The E-FRAME project will provide support for the creation of inter-operable and scalable Cooperative Systems throughout the European Union. It will provide a centre of knowledge that is commercially and politically neutral, and which serves everyone's long term interests. The project will extend the European ITS Framework (FRAME) Architecture to include Cooperative Systems, show how it can be us ...
Voir le projet

 8

 TERMINÉ 

SMART Container Chain Management (SMARTCM)

Date du début: 1 août 2008, Date de fin: 31 oct. 2011,

SMART_CM aims to do advanced technology implementation and research in order to overhaul the complete container door-to-door transport chain so that it is more efficient, secure, market driven, and competitive. It systematically analyses current processes and systems, produces new innovative concepts for processes and technologies, and demonstrates all these in a set of 2 world scale Demonstrators ...
Voir le projet

 31

 TERMINÉ 

Learning 4 Security (L4S)

Date du début: 1 juil. 2009, Date de fin: 31 juil. 2011,

"Effective collaboration dynamics are at the core of crisis management in the transportation sector. Nevertheless, in today’s global environment, a very large number of crisis management initiatives fail to deliver the value expected, as the collaboration challenges in crisis are very high. This is because of the complexity of the knowledge integration processes as well as the diversity and distri ...
Voir le projet

 11

 TERMINÉ 

Intelligent MegaSwapBoxes for Advanced Intermodal Freight Transport (TelliBox)

Date du début: 1 avr. 2008, Date de fin: 31 mars 2011,

Faced with a trend towards increasing freight transport, a global market that is constantly growing and the need for a resource-saving transport system, it is mandatory that European transport policy shifts the balance between all transport systems.`Intelligent MegaSwapBoxes for Advanced Intermodal Freight Transport’ (TelliBox) as an all-purpose loading unit will actively promote the EU’s objectiv ...
Voir le projet

 10

 TERMINÉ 

Changing Perceptions of Security and Interventions (CPSI)

Date du début: 1 avr. 2008, Date de fin: 31 mars 2010,

"The goal of the present project is to provide governments and related organizations with a methodology to increase insight into the determinants of actual and perceived security, and into which interventions are effective for increasing security. The deliverables of this project represent practical and ready-to-use tools, which can be employed by policy makers and other end-users, to formulate po ...
Voir le projet

 10