Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Robotics Enabling Fully-Integrated Logistics Lines for Supermarkets (REFILLS)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2020,

While online grocery stores are expanding, supermarkets continue to provide customers with the sensory experience of choosing goods while walking between display shelves. Therefore, retail and logistics companies are concerned with making the shopping experience more comfortable and exciting while, at the same time, using technology to reduce costs and improve efficiency. The REFILLS project aims ...
Voir le projet

 7

 TERMINÉ 

Platform-aware Model-driven Optimization of Cyber-Physical Systems (oCPS)

Date du début: 1 nov. 2015, Date de fin: 31 oct. 2019,

Many modern industrial systems fall in the realm of Cyber-Physical Systems (CPS) because of the tight interaction between computation, communication and control elements (the cyber part), and physical processes such as motion, heating/cooling, vibration, wear and tear (the physical part) within these systems. Traditional design methods involve multiple, often isolated, design phases involving diff ...
Voir le projet

 8

 TERMINÉ 

Vision Inspired Driver Assistance Systems (VI-DAS)

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

Road accidents continue to be a major public safety concern. Human error is the main cause of accidents. Intelligent driver systems that can monitor the driver’s state and behaviour show promise for our collective safety. VI-DAS will progress the design of next-gen 720° connected ADAS (scene analysis, driver status). Advances in sensors, data fusion, machine learning and user feedback provide the ...
Voir le projet

 16

 TERMINÉ 

5G MiEdge: Millimeter-wave Edge cloud as an enabler for 5G ecosystem (5G MiEdge)

Date du début: 1 juil. 2016, Date de fin: 30 juin 2019,

Current research efforts on 5G Radio Access Networks (RAN) strongly focus on mmWave access to realize enhanced mobile broadband (eMBB) services. However, there are many unsolved issues to deploy mmW ave 5G RAN. The most critical issue is backhauling since it is infeasible to provide 10 Gigabit Ethernet backhaul everywhere. Meanwhile, Mobile Edge Computing (MEC) have obtained much attention in 5G n ...
Voir le projet

 5

 TERMINÉ 
FUTEBOL composes a federation of research infrastructure in Europe and Brazil, develops a supporting control framework, and conducts experimentation-based research in order to advance the state of telecommunications through the investigation of converged optical/wireless networks. Current wireless trends (cell densification, coordinated communication, massive MIMO) pose a new set of challenges tha ...
Voir le projet

 5

 TERMINÉ 

Cloud Large Scale Video Analysis (Cloud-LSVA)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

Cloud-LSVA will create Big Data Technologies to address the open problem of a lack of software tools, and hardware platforms, to annotate petabyte scale video datasets. The problem is of particular importance to the automotive industry. CMOS Image Sensors for Vehicles are the primary area of innovation for camera manufactures at present. They are the sensor that offers the most functionality for t ...
Voir le projet

 12

 TERMINÉ 
Understanding properties of nanoparticles (and in general of nano-functionalized materials) and how they behave in living systems is a relatively new area of scientific study. The scientific community has not yet been able to derive harmful properties of nanomaterials from the properties of the bulk material. So a precautionary approach is required when handling and using these materials in circum ...
Voir le projet

 15

 TERMINÉ 
Fortissimo 2 will drive the uptake of advanced modelling, simulation and data analytics by European engineering and manufacturing SMEs and mid-caps. Such an uptake will deliver improved design processes, better products and services, and improved competitiveness. For the European Union as a whole this means improved employment opportunities and economic growth.The importance of advanced ICT to the ...
Voir le projet

 38

 TERMINÉ 

Next Generation I/O for Exascale (NEXTGenIO)

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2018,

The overall objective of the Next Generation I/O Project (NEXTGenIO) is to design and prototype a new, scalable, high-performance, energy efficient computing platform designed to address the challenge of delivering scalable I/O performance to applications at the Exascale. It will achieve this using highly innovative, non-volatile, dual in-line memory modules (NV-DIMMs). These hardware and systemwa ...
Voir le projet

 9

 TERMINÉ 
... reliable positioning subsystem. A good example of these new requirements can be witnessed in the increasing interest in navigation at lane-level, with applications such as enhanced driver awareness, intelligent speed alert and simple lane allocation. As well as the accuracy of positioning data being a big driver, there is also a question around the adaptability of navigation systems to these appl ...
Voir le projet

 10

 TERMINÉ 
The 5G CHAMPION project ambitions to deliver the first 5G system proof-of-concept in conjunction with the 2018 South Korean Winter Olympics. Key novel 5G building blocks will be developed and implemented into a new architectural approach providing an efficient end-to-end system performance encompassing cutting edge 5G radio-access, core-network and satellite technologies.It will be the first time ...
Voir le projet

 10

 TERMINÉ 
... The RealValue consortium is a truly cohesive partnership which has full participation and commitment from the whole energy supply chain. The consortium includes: technology developers (Glen Dimplex, Intel); energy system modelling specialists (UCD, DIW, RTU); energy market specialists (VTT); socio-economic experts (Oxford University); electricity network operators (ESBN, EirGrid) and energy utili ...
Voir le projet

 12

 TERMINÉ 

Seven Nanometer Technology (SeNaTe)

Date du début: 1 avr. 2015, Date de fin: 31 mars 2018,

The SeNaTe project is the next in a chain of thematically connected ENIAC JU KET pilot line projects which are associated with 450mm/300mm development for the 12nm and 10nm technology nodes. The main objective is the demonstration of the 7nm IC technology integration in line with the industry needs and the ITRS roadmap on real devices in the Advanced Patterning Center at imec using innovative devi ...
Voir le projet

 41

 TERMINÉ 
SMEs play a key role in European economies; they constitute the largest business block and provide the bulk of employment. They generate most of the innovative ideas for ICT and CPS-enabled IoT products, two areas which represent an inflection point for innovators and industry in Europe. EuroCPS is an ambitious project that aims to arm Europe with a network of design centres that will boost and i ...
Voir le projet

 15

 TERMINÉ 
The objective of SPEED-5G is to research and develop technologies that address the well-known challenges of predicted growth in mobile connections and traffic volume. A major challenge is the cost of meeting the objective, in terms of both infrastructure and deployment. Today, lack of dynamic control across wireless network resources is leading to unbalanced spectrum loads and a perceived capacit ...
Voir le projet

 10

 TERMINÉ 

MIcro KErneL virtualizAtioN for hiGh pErfOrmance cLOud and hpc systems (MIKELANGELO)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

MIKELANGELO is a project, targeted to disrupt the core underlying technologies of Cloud computing, enabling even bigger uptake of Cloud computing, HPC in the Cloud and Big Data technologies under one umbrella. The vision of MIKELANGELO is to improve responsiveness, agility and security of the virtual infrastructure through packaged applications, using lean guest operating system OSv and superfast ...
Voir le projet

 9

 TERMINÉ 
Key objectives of METIS-II are to develop the overall 5G radio access network design and to provide the technical enablers needed for an efficient integration and use of the various 5G technologies and components currently developed. The innovation pillars that will allow METIS-II to achieve this goal are • a holistic spectrum management architecture addressing the spectrum crunch, • an air interf ...
Voir le projet

 24

 TERMINÉ 
The overall objective of Flex5Gware is to deliver highly reconfigurable hardware (HW) platforms together with HW-agnostic software (SW) platforms targeting both network elements and devices and taking into account increased capacity, reduced energy footprint, as well as scalability and modularity, to enable a smooth transition from 4G mobile wireless systems to 5G.As it will be argued in the propo ...
Voir le projet

 19

 TERMINÉ 
5G will have to cope with a high degree of heterogeneity in terms of: (a) services (mobile broadband, massive machine and mission critical communications, broad-/multicast services and vehicular communications); (b) device classes (low-end sensors to high-end tablets); (c) deployment types (macro and small cells); (d) environments (low-density to ultra-dense urban); (e) mobility levels (static to ...
Voir le projet

 18

 TERMINÉ 
... users, supporting UHD/3D streaming, immersive applications and ultra-responsive cloud services.The consortium brings together major infrastructure vendors (Samsung, Ericsson, Alcatel-Lucent, Huawei, Intel, Nokia), major European operators (Orange, Telefonica), leading research institutes and universities (Fraunhofer HHI Institute, CEA-LETI, IMDEA Networks, Universities Aalto, Bristol, Chalmers an ...
Voir le projet

 19

 TERMINÉ 

DEEP Extended Reach (DEEP-ER)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2017,

... more applications increasing scientific throughput, and the loss of computational work through system failures will be substantially reduced.DEEP-ER will build a prototype with the second generation Intel® Xeon Phi processor, a uniform high-speed interconnect across Cluster and Booster, non-volatile memory on the compute nodes, and network attached memory providing high-speed shared memory access ...
Voir le projet

 17

 TERMINÉ 

An integrated development environment for portable network applications (NetIDE)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

While most of programmable network gear vendors support OpenFlow nowadays, a number of fragmented control plane solutions exist for proprietary software-defined networks. Thus, network applications developers need to re-code their solutions every time they target a network infrastructure based on a different controller. Moreover, different network developers adopt different solutions as abstract c ...
Voir le projet

 10

 TERMINÉ 
Providing broadband wireless communications to a majority of European citizens is a major objective of the EC at the horizon of 2020. With a current annual growth rate in the range of 70%, the mobile data traffic of smartphones, tablets, machine-to-machine and other portable devices dramatically challenges the 4G wireless cellular network currently under deployment. To sustain this growth, high da ...
Voir le projet

 15

 TERMINÉ 
Flexible spectrum usage is a promising enabler of spectral efficiency for next generation wireless broadband networks. In order to deliver the next order of magnitude gains in terms of overall spectral and radio efficiency envisioned for 2020, wireless access will have to be revisited both from a policy as well as from a technology innovation perspective. On the policy side, with the emergence of ...
Voir le projet

 8

 TERMINÉ 

Tomorrow's Elastic, Adaptive Mobility (TEAM)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2016,

TEAM aims at developing systems for participants in transportation networks, which help them to behave better – by explicitly taking into account the needs and constraints of other participants and the network itself. Focus will be placed upon decision-making in a time interval, above what is commonly associated with reactive safety (typically less than 5 seconds) and below long-term planning appl ...
Voir le projet

 27

 TERMINÉ 

Semiconductor Equipment Assessment for Key Enabling Technologies (SEA4KET)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

SEA4KET (Semiconductor Equipment Assessment for Key Enabling Technologies) is an IP proposal taking the consequent step from equipment R&D to equipment assessment experiments. The strategic objective is to effectively combine resources and expertise in a joint assessment of novel equipment for key enabling technologies to foster and accelerate the successful transfer of novel European equipment in ...
Voir le projet

 26

 TERMINÉ 

PRACTICE: Privacy-Preserving Computation in the Cloud (PRACTICE)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

The traditional computing paradigm is experiencing a fundamental shift: organizations no longer completely control their own data, but instead hand it to external untrusted parties - cloud service providers, for processing and storage. There currently exist no satisfactory approach to protect data during computation from cloud providers and from other users of the cloud.PRACTICE has assembled the ...
Voir le projet

 20

 TERMINÉ 

European 450mm Equipment Demo Line (E450EDL)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

The aim of the E450EDL project is to continue the engagement of the European semiconductor equipment and materials industry in the 450mm wafer size transition that started with the ENIAC JU EEMI450 initiative and proceeded with subsequent projects funded with public money, amongst others NGC450, SOI450, EEM450PR. The demo line resulting from this project will be such that it will enable first crit ...
Voir le projet

 44

 TERMINÉ 

EXascale Algorithms and Advanced Computational Techniques (EXA2CT)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

Numerical simulation is a crucial part of science and industry in Europe. The advancement of simulation as a discipline relies on increasingly compute intensive models that require more computational resources to run. This is the driver for the evolution to exascale. Due to limits in the increase in single processor performance, exascale machines will rely on massive parallelism on and off chip, w ...
Voir le projet

 10

 TERMINÉ 
The importance of advanced simulation to the competitiveness of both large and small companies is well established. The principal objective of Fortissimo is to enable European manufacturing, particularly small to medium enterprises (SMEs), to benefit from the efficiency and competitive advantage inherent in the use of simulation. However, the simulation of, for example, high-pressure gas cylinders ...
Voir le projet

 96

 TERMINÉ 

Millimetre-wave Evolution for Backhaul and Access (MiWEBA)

Date du début: 1 juin 2013, Date de fin: 31 mai 2016,

Due to the popularization of smart phones and tablets in recent years, the traffic of data on conventional networks are predicted to be increased by 1000 times in the next 10 years. To face the severe issue of system capacity shortage due to the increasing data traffic in cellular networks, standardization on heterogeneous networks with overlay deployment of low-power base stations in the service ...
Voir le projet

 5

 TERMINÉ 

Unifying Cloud and Carrier Networks (UNIFY)

Date du début: 1 nov. 2013, Date de fin: 30 avr. 2016,

Telecom providers struggle with low service flexibility, increasing complexity and related costs. Although cloud computing and networking have been two very active fields of research, there is currently little integration between the vast networking assets and data centres of telecom providers. UNIFY addresses this by considering the entire network, from home networks up to data centre, as a "unif ...
Voir le projet

 16

 TERMINÉ 
European IC manufacturers are on the way to become suppliers of customized products for OEM companies, which means high flexibility and product diversity. The project aims at conducting research to support the development of new manufacturing procedures, new organizations and new information and control tools to enable IC production lines to efficiently manage a high product and technology mix and ...
Voir le projet

 29

 TERMINÉ 

Dynamical Exascale Entry Platform (DEEP)

Date du début: 1 déc. 2011, Date de fin: 31 août 2015,

...eral purpose Exascale performance supercomputers in Europe. The DEEP concept is based on the duality of an advanced multi-core Cluster system with InfiniBand interconnect complemented by a Booster of Intel many-core MIC processors connected through a Terabit EXTOLL network. A novel open source system software stack along with Cluster Booster adapted programming models, libraries, and performance t ...
Voir le projet

 18

 TERMINÉ 
Product and production engineering in companies are typically fragmented across different functional units, distributed across companies along the value chain, requiring input from experts from a variety of disciplines using different methods and tools. This leads to a high coordination effort to synergise work and information transfer as well as to sub-optimal decisions and unused knowledge and e ...
Voir le projet

 15

 TERMINÉ 

European E&M 450mm Pilotline Readiness (EEM450PR)

Date du début: 1 avr. 2012, Date de fin: 1 mars 2015,

Aim of the EEM450PR project is to continue the engagement of the European semiconductor equipment and materials industry in the 450mm wafer size transition that started with the ENIAC JU EEMI450 initiative. It will also bring about the start of a vision to place an equipment development pilot line in the imec facility in Leuven. This will provide Europe with a complementary activity for 450mm equi ...
Voir le projet

 32

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Voir le projet

 92

 TERMINÉ 

Digital Preservation for Timeless Business Processes and Services (TIMBUS)

Date du début: 1 avr. 2011, Date de fin: 31 déc. 2014,

Description TIMBUS extends traditional digital preservation approaches by introducing the need to analyse and preserve services, and by aligning preservation actions with business continuity management.A primary motivation for TIMBUS is the declining use of centralised in-house business processes. Based on the concept of software as a ser ...
Voir le projet

 12

 TERMINÉ 
Manufacturing is the driving force of Europe's economy, providing over €6,553 billion in GDP. However against a background of climate change legislation, volatile energy prices and increased environmental awareness, modern manufacturing must encompass a focus on eco-efficiency. Given the current economic situation, this must be achieved without the need for large capital expenditure. Adding inform ...
Voir le projet

 15

 TERMINÉ 

Production Logistics and Sustainability Cockpit (PLANTCockpit)

Date du début: 1 sept. 2010, Date de fin: 31 déc. 2013,

...ntegration standards such as ISA 95, OAGIS, OPC Unified Architecture, MTConnect will be used as starting points.The well-balanced consortium of PLANTCockpit includes world-leading system providers (INTEL, SAP), technology leaders (Iconics), strong academic partners (EPFL, TECNALIA, POLIMI, TUD, TUT), and high-profile end-users (ACCIONA, BMW, COMAU, DOEHLER).
Voir le projet

 13