Rechercher des projets européens

20 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Imaging the Force of Cancer (FORCE)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

Cancer is the second leading cause of mortality in EU member states with ~90% of all cancer deaths caused by metastatic spread. Despite its significance, measuring metastatic potential as well as potential indicators of therapy efficacy remain unmet clinical challenges. Recently, it has been demonstrated in vitro, that aggressive metastatic cells pull on their surroundings suggesting that metastat ...
Voir le projet

 18

 TERMINÉ 

Smart Resilience Indicators for Smart Critical Infrastructures (SmartResilience)

Date du début: 1 mai 2016, Date de fin: 30 avr. 2019,

...icators cube”, including the resilience matrix). (#4) By developing the interactive “SCI Dashboard” tool. (#5) By applying the methodology/tools in 8 case studies, integrated under one virtual, smart-city-like, European case study. The SCIs considered (in 8 European countries!) deal with energy, transportation, health, water…Results #2, #3, #4 and #5 are a breakthrough innovation.This approach wil ...
Voir le projet

 21

 TERMINÉ 

The European Open Science Cloud for Research Pilot Project. (EOSCpilot)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2018,

The EOSCpilot project will support the first phase in the development of the European Open Science Cloud (EOSC) as described in the EC Communication on European Cloud Initiatives [2016]. • It will establish the governance framework for the EOSC and contribute to the development of European open science policy and best practice; • It will develop a number of pilots that integrate service ...
Voir le projet

 39

 TERMINÉ 
...w controlled and cost effective solutions.IMPRESS will also develop a new Iterative Design Methodology, which will incorporate all stages of the Design-Construct-Install-Operate process. This will be integrated with a BIM cloud based database focussing on the interoperability between software tools required for the prefabricated process. Furthermore, new penalty based business models will be inves ...
Voir le projet

 16

 TERMINÉ 

City Logistics in Living Laboratories (CITYLAB)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

Goods, waste and service trips in urban areas impose negative traffic and environmental impacts, and there is a need for further roll-out of cost-effective and sustainable solutions. The CITYLAB objective is to develop knowledge and solutions that result in roll-out, up-scaling and further implementation of cost effective strategies, measures and tools for emission free city logistics in urban cen ...
Voir le projet

 25

 TERMINÉ 

Transfer-print operations for heterogeneous integration (TOP HIT)

Date du début: 2 févr. 2015, Date de fin: 1 févr. 2018,

Smart systems technologies are evolving towards ever increasing functionality and miniaturisation through the heterogeneous integration of separate components. The ideal integration requires precision placement of multiple types of devices on a substrate to allow their inter-connection. We propose to solve this integration challenge through an exciting new technique called micro-Transfer-Printing ...
Voir le projet

 8

 TERMINÉ 
...es addressing this building operation phase will have a major impact in the building life cycle cost.Energy IN TIME (EiT) project goes beyond existing building control techniques, developing an integrated control & operation approach, that will combine state of the art modelling techniques with the development of an innovative simulation-based control technique with the overarching objective of au ...
Voir le projet

 13

 TERMINÉ 
...so implemented that will allow the selection of the best possible retrofitting mix, customised to the needs of the particular building.Several remarkable innovative technologies and materials will be integrated in the retrofitting process:- Envelope Retrofitting: Ventilated Facades, Aerogel-based Superinsulating mortar, Wooden Insulating Wall Panel and VIP Panel- Integration of RES: PV Energy, The ...
Voir le projet

 27

 TERMINÉ 

European 450mm Equipment Demo Line (E450EDL)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

The aim of the E450EDL project is to continue the engagement of the European semiconductor equipment and materials industry in the 450mm wafer size transition that started with the ENIAC JU EEMI450 initiative and proceeded with subsequent projects funded with public money, amongst others NGC450, SOI450, EEM450PR. The demo line resulting from this project will be such that it will enable first crit ...
Voir le projet

 44

 TERMINÉ 

Friendly and Affordable Sustainable Urban Districts Retrofitting (FASUDIR)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

...ry building-retrofitting market mobilization in Europe to fulfill EU-targets in 2020 and 2050, new business models and financial supporting tools need to be developed. FASUDIR will provide an Integrated Decision Support Tool (IDST) based on a new methodology supported by a software tool that will help decision makers to select the best energy retrofitting strategy to increase the sustainability of ...
Voir le projet

 12

 TERMINÉ 
The importance of advanced simulation to the competitiveness of both large and small companies is well established. The principal objective of Fortissimo is to enable European manufacturing, particularly small to medium enterprises (SMEs), to benefit from the efficiency and competitive advantage inherent in the use of simulation. However, the simulation of, for example, high-pressure gas cylinders ...
Voir le projet

 96

 TERMINÉ 

Smart Intelligent Aircraft Structures (SARISTU)

Date du début: 1 sept. 2011, Date de fin: 31 août 2015,

...dge, the trailing edge and thewinglet on a full-size external wing by aerodynamic and structural testing.Operational requirements on morphing surfaces necessitate the implementation of an independent,integrated shape sensing system to ensure not only an optimal control of the aerodynamic surfacebut also failure tolerance and robustness. Developments made for structural health monitoring willbe ada ...
Voir le projet

 68

 TERMINÉ 
"Due to barriers that exist in when considering the sustainability of the built environment, optimising energy efficiency in buildings is often a management issue and not one of design. In many cases, it is the organisation responsible for the building that makes the decision with respect to where best to invest their limited resources. For this reason, decision support tools, providing informat ...
Voir le projet

 12

 TERMINÉ 

European E&M 450mm Pilotline Readiness (EEM450PR)

Date du début: 1 avr. 2012, Date de fin: 1 mars 2015,

...the required capabilities new sophisticated equipment for the Chemical Mechanical Polishing process step as well as very advanced equipment for final cleaning procedures will be developed and will be integrated in a 450mm wafer line.Next to technology development also a 450mm equipment development pilot line facility will be prepared by developing state-of-the-art facilities readiness, including s ...
Voir le projet

 32

 TERMINÉ 

OPtimisation for low Environmental Noise impact AIRcraft (OPENAIR)

Date du début: 1 avr. 2009, Date de fin: 30 sept. 2014,

...reduction and will result in the development and validation up to TRL 5 of “2nd Generation” technology solutions. OPENAIR’s multidisciplinary approach and composition is suited to the projected integrated, lightweight solutions. The process includes a down-selection in mid project. The selected technologies will be subjected to scaled rig tests, and the resulting data will support assessment of th ...
Voir le projet

 51

 TERMINÉ 
... be achieved by building a new risk management paradigm for emerging risks, which is a set of principles supported by a common language, commonly agreed tools & methods and Key Performance Indicators integrated into a single framework. As main impact, it will reduce time-to-market for the lead market EU technologies and promote safety, security, environmental friendliness and social responsibility ...
Voir le projet

 67

 TERMINÉ 

Spectrum and energy efficiency through multi-band Cognitive Radio (SACRA)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2012,

...he innovation and impact brought by SACRA project are in the combination of innovative approaches on Radio Frequency (RF) front-end and base band components design with new cognitive radio techniques integrated into a demonstrator platform. The major outcome of SACRA project is a proof-of-concept able to communicate jointly and cognitively in two separate frequency bands, which corresponds to conc ...
Voir le projet

 11

 TERMINÉ 
Major water using and discharging industries are of significant European economic importance, generating >€1500 billion turnover and employing >7.5 million people in 220,000 companies (90% SMEs). With continued European growth in demand for water, finite reservoirs of readily-treatable water, rising energy costs and increased environmental legislation, EU industry is experiencing significant compe ...
Voir le projet

 9

 TERMINÉ 

Strategic Crime and Immigration Information Management System (SCIIMS)

Date du début: 1 nov. 2009, Date de fin: 31 oct. 2012,

"People trafficking and People Smuggling has long been a problem for European Governments, adversely affecting the security of their citizens. In many cases women and children are exploited for the sex trade and labour exploitation. In formulating the SCIIMS project the consortium will focus upon an overarching question from which the developed system, demonstration and experimentation will answe ...
Voir le projet

 9

 TERMINÉ 

Agile Photonic Integrated Systems-on-Chip enabling WDM Terabit Networks (APACHE)

Date du début: 1 avr. 2008, Date de fin: 30 sept. 2011,

The APACHE project will develop new compact, scalable and cost-optimized photonic integrated components that will be capable of generating, regenerating and receiving amplitude- (OOK) and phase- (DPSK, QPSK) encoded optical signals for high capacity (>100Gb/s) WDM networks. The APACHE concept is based on developing devices having both multi-functionality and agility in order to reach Terabit capac ...
Voir le projet

 7