Rechercher des projets européens

22 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 

Arrowhead (ARROWHEAD)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Voir le projet

 87

 TERMINÉ 

Critical System Engineering Acceleration (CRYSTAL)

Date du début: 1 mai 2013, Date de fin: 31 juil. 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr ...
Voir le projet

 70

 TERMINÉ 

DEvelopment platform for Safe and Efficient dRiVE (DESERVE)

Date du début: 1 sept. 2012, Date de fin: 29 févr. 2016,

According to a recent forecast published by ABI Research , a fast growth of the market of Advanced Driving Assistance Systems (ADAS) is foreseen in the next five years. For example, in 2016 the overall annual market for Lane Departure Warning systems is expected to reach 22 million units/year (corresponding to 14,3 billion dollars). This market growth will be possible only through the reduction of ...
Voir le projet

 28

 TERMINÉ 

Security and Safety Modelling (SESAMO)

Date du début: 1 mai 2012, Date de fin: 30 juin 2015,

"The SESAMO project addresses the root causes of problems arising with convergence of safety and security in embedded systems at architectural level, where subtle and poorly understood interactions between functional safety and security mechanisms impede system definition, development, certification, and accreditation procedures and standards. Intense market innovation is being held back by this r ...
Voir le projet

 21

 TERMINÉ 

European Library-based flow of Embedded Silicon and test Instruments (ELESIS)

Date du début: 1 juin 2012, Date de fin: 1 juin 2015,

This project aims to increase European Integrated Circuits (IC) quality and competitiveness by developing generic test instruments and interfaces which will drasticly improve the testability and reliability of ICs.Presently, production testing of ICs is done by large and expensive Automated Test Equipment (ATE). A disadvantage of this approach is that while the production cost of a transistor decr ...
Voir le projet

 16

 TERMINÉ 

Combined Model-based Analysis and Testing of Embedded Systems (MBAT)

Date du début: 1 nov. 2011, Date de fin: 31 déc. 2014,

"One of the most important strategic sectors in which Europe is developing, integrating and delivering high-quality products is the transportation domain. Here, high-class safety-related products as e.g. airplanes, cars and trains have a huge market impact. More and more of the market value of these vehicles is gained by embedded systems inside these products, and the number and importance of thes ...
Voir le projet

 42

 TERMINÉ 

Verification for heterogeneous Reliable Design and Integration (Verdi)

Date du début: 1 sept. 2011, Date de fin: 31 août 2014,

Systems of Systems (SoS) are heterogeneous whereby the functionality more and more rely on the interaction and interoperability between the analogue/mixed-signal (AMS), digital electronics, software and other physical domains.To achieve the required reliability, robustness and quality of SoS, mastering the heterogeneous behaviour across domains is the most essential part during the development pro ...
Voir le projet

 8

 TERMINÉ 

Energy Efficient and Intelligent Lighting Systems (ENLIGHT)

Date du début: 1 avr. 2011, Date de fin: 1 mars 2014,

The lighting industry is currently going through a radical transformation, driven by both the rapid progress of Solid State Lighting (SSL) and semiconductors technologies, and the changing societal needs like sustainability, energy efficiency and CO2 reduction.Therefore, we have to adapt rapidly by collaborating in a supportive open-innovation eco-system, which can drive research and development t ...
Voir le projet

 30

 TERMINÉ 
This project aims at developing architecture and technologies for implementing agile radio frequency (RF) transceiver capacities in future radio communication products. These new architecture and technologies will be able to manage multi-standard (multi-band, multi-data-rate, and multi-waveform) operation with high modularity, low-power consumption, high reliability, high integration, low costs, l ...
Voir le projet

 41

 TERMINÉ 

Semiconductor Equipment Assessment Leveraging Innovation (SEAL)

Date du début: 1 juin 2010, Date de fin: 30 sept. 2013,

Description Seal is an EC-funded project covering semiconductor equipment assessment to strengthen the European semiconductor equipment industry. SEAL is an integrated project consisting of 17 equipment assessment sub-projects in the area of semiconductor manufacturing equipment. The assessment th ...
Voir le projet

 39

 TERMINÉ 
...e STEP1. As longer term needs see increasing performances, a 12bit ADC beyond State-of-the-Art is then focused in the frame of the ""STEP2"" taking advantage of the advanced technology developed by Infineon. The total project is planned on 3 years. Specifications derived from advanced system level needs, proven design and radiation hardening expertise, high performance technology and related devic ...
Voir le projet

 6

 TERMINÉ 
"The objective of POLLUX is to develop a distributed real time embedded systems platform for next generation electric vehicles, by using a component and programming-based design methodology. Reference designs and embedded systems architectures for high efficiency innovative mechatronics systems will be addressed with regard to requirements on composability, networking, security, robustness, diagno ...
Voir le projet

 37

 TERMINÉ 
Security has always been a stepchild to the developers of embeddedsystems. In the past they were able to rely on physicalprotection. Due to the connectivity and ubiquity of today's embeddedsystems this is no longer possible. The aim of SecFutur is to developand establish a security engineering process for embedded systems. Inorder to achieve this overall goal SecFutur will provide a set ofimplem ...
Voir le projet

 11

 TERMINÉ 
The ENIAC JU project ESiP is addressing the issues of reliability, failure analysis and testing in innovative system-in-package (SiP) solutions. Highly integrated systems with greater miniaturisation and increased functionality open new markets and improve the quality of life through a wide range of applications. In particular, higher systems integration technologies using multi-chip packaging, th ...
Voir le projet

 40

 TERMINÉ 

Reduced Certification Costs for Trusted Multi-core Platforms (RECOMP)

Date du début: 1 avr. 2010, Date de fin: 31 mars 2013,

"The proposed RECOMP (Reduced certification cost for trusted multi-core platforms) research project will establish methods, tools and platforms for enabling cost-efficient certification and re-certification of safety-critical systems and mixed-criticality systems, i.e. systems containing safety-critical and non-safety-critical components.RECOMP recognizes the fact that the increasing processing po ...
Voir le projet

 40

 TERMINÉ 

Spectrum and energy efficiency through multi-band Cognitive Radio (SACRA)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2012,

As highlighted in the Work Programme, energy efficiency and flexibility in the use of spectrum resources are two major research challenges for the development of future wireless communications technologies.To address these challenges, SACRA project proposes to develop a multi-band cognitive radio technology. In SACRA, new techniques for the global efficiency of wireless systems will be developed i ...
Voir le projet

 11

 TERMINÉ 

Cost-Efficient Methods and Processes for Safety Relevant Embedded Systems (CESAR)

Date du début: 1 mars 2009, Date de fin: 30 juin 2012,

"The embedded safety-critical systems design and development industry is facing increasing complexity and variety of systems and devices, coupled with increasing regulatory constraints while costs, performances and time to market are constantly challenged.This has led to a profusion of enablers (new processes, methods and tools), which are neither integrated nor interoperable because they have bee ...
Voir le projet

 54

 TERMINÉ 

Cognitive Radio Oriented Wireless Networks (CROWN)

Date du début: 1 mai 2009, Date de fin: 30 avr. 2012,

Europe is in the midst of a communications revolution facilitated, in part, by advances in wireless communications, such as wireless internet and leading to the next generation of systems. Both power and spectrally efficient techniques are major design objectives for next generation wireless networks. Recent studies have indicated that many licensed frequency bands remain unused 90% of the time. I ...
Voir le projet

 7

 TERMINÉ 

E3Car -> Nanoelectronics for an energy efficient electrical car (E3CAR)

Date du début: 1 févr. 2009, Date de fin: 1 janv. 2012,

The objective of the project is the development of nanoelectronics technologies, devices, circuits architectures and modules for electrical cars/vehicles and demonstration of these modules in a final systems.Emissions from road vehicles have to be reduced substantially in the future. The ultimate goal of most car manufacturers is to get to a completely electric vehicle, protecting the environment ...
Voir le projet

 32

 TERMINÉ 

Home Gigabit Access (Omega)

Date du début: 1 janv. 2008, Date de fin: 31 mars 2011,

Gigabit Home Access Networks are a pivotal technology to be developed if the EU Vision of the Future Internet is to be realised. Consumers will require such HANs to be simple to install, without any new wires, and easy enough to use so that information services running on the HAN will be just another utility, as, for instance, electricity, water and gas are today. The OMEGA HAN is centred round th ...
Voir le projet

 24

 TERMINÉ 
The main objective of the project is to foster a harmonised technology for managing in real time the energy consumption of appliances at home, interworking this information to communication devices over the home network and virtualising it with the final aim of making it available to users through home communication networks in the form of standalone or network operator services.Behind this scope, ...
Voir le projet

 12