Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Background The project targets a range of fauna species found in Ticino Park - 15 species listed in Annex I of the Birds Directive and Annex II, IV and V of the Habitats Directive. The park acts as a source of biodiversity for the whole Padana Plain, hosting most of the species of conservation interest related to this geographic area. Currently, it is the ...
Voir le projet

 3

 TERMINÉ 
Approximately one third of all food produced globally is wasted every year throughout the whole value chain-from farmers to consumers. To extract the significant amounts of valuable compounds contained in these wastes, AgriMax will combine affordable and flexible processing technologies (ultrasound assisted and solvent extraction, filtration, thermal and enzymatic treatments) for the valorization ...
Voir le projet

 30

 TERMINÉ 
The basic idea is to embed the waste from building demolition (fragmented bricks, fragmented plaster or concrete, fragmented glasses, machined wood from windows frame or from wood beams after demolition etc.) in a geopolymer matrix to produce prefabricated panels for different use.The main objective of InnoWEE is in fact the development of an optimized reuse of Construction and Demolition Waste (C ...
Voir le projet

 10

 TERMINÉ 
Rapid expansion of utilisation of solar thermal energy for increasing energy efficiency of buildings have been adopted in short/medium- and long-term Energy Strategies of EU countries in line with regional actions with the European climate energy objectives as defined in the European Union’s “20-20-20” targets and in the European Commission’s Energy Roadmap 2050.The overall objective of this proje ...
Voir le projet

 9

 TERMINÉ 

Safe Food and Feed through an Integrated ToolBox for Mycotoxin Management (MyToolBox)

Date du début: 1 mars 2016, Date de fin: 29 févr. 2020,

MyToolBox mobilises a multi-actor partnership (academia, farmers, technology SMEs, food industry and policy stakeholders) to develop novel interventions aimed at achieving a 20-90% reduction in crop losses due to fungal and mycotoxin contamination. MyToolBox will not only pursue a field-to-fork approach but will also consider safe use options of contaminated batches, such as the efficient producti ...
Voir le projet

 23

 TERMINÉ 

Advancing Smart Optical Imaging and Sensing for Health (ASTONISH)

Date du début: 1 juin 2016, Date de fin: 31 mai 2019,

The ageing population and related increase in chronic diseases put considerable pressure on both the healthcare system and the society, resulting in an unsustainable rise of healthcare costs. As a result there is an urgent need to improve efficiency of care and reduce hospitalisation time in order to control cost and increase quality of life. Addressing this need, medical applications need to beco ...
Voir le projet

 25

 TERMINÉ 

Ensuring the Integrity of the European food chain (FOODINTEGRITY)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2018,

Food Integrity “the state of being whole, entire, or undiminished or in perfect condition”.Providing assurance to consumers and other stakeholders about the safety, authenticity and quality of European food (integrity) is of prime importance in adding value to the European Agri-food economy. The integrity of European foods is under constant threat from fraudulently labelled imitations that try to ...
Voir le projet

 64

 TERMINÉ 

Governance and Tools for Work-Based Learning in Europe

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

GO.TO.WORK.IN.EUROPE intende aumentare la qualità di un apprendimento basato sul lavoro attraverso la definizione di un modello innovativo, modello ECLI, (acronimo di Expert, Classroom, Laboratory e Individual Experience) volto a promuovere e a mettere a sistema un insieme di percorsi integrati di WBL, progettati, attuati, verificati e valutati da parte delle istituzioni scolastiche in collaborazi ...
Voir le projet

 9

 TERMINÉ 

Improving students’ and teachers’ skills in home automation

Date du début: 1 sept. 2016, Date de fin: 31 août 2018,

Due to the climate change occured following great energy consumption,all the countries take measures of diminishing this situation worldwide.One of the methods is the automation of electrical installations in the houses,which results in more than 30% power saving at an average amount of energy used.The project is aimed at developing as well the basic key competences in the students in electrical i ...
Voir le projet

 6

 TERMINÉ 

ALCORCÓN EN EUROPA III

Date du début: 1 sept. 2016, Date de fin: 31 août 2018,

The towns of Alcorcón, Móstoles and their immediate surroundings recorded a high rate of youth unemployment which, as is the case with the rest of the Spanish state, is the result of the decline in economic activity in recent years. In this context, the local populaion presents a number of pressing needs related to lack of experience and job opportunities that justify the existence of the "ALCORCÓ ...
Voir le projet

 22

 TERMINÉ 

Developing EU through online innovation

Date du début: 1 sept. 2015, Date de fin: 30 juin 2018,

Context/background of project It is essential to differentiate and modernize the study process in all education stages by making it more convenient and accessible to individuals. Distance education, especially distance learning is a mode of delivering education to students, often using personalized approach. This mode of studying continues to develop along with technological advancements. Distance ...
Voir le projet

 7

 TERMINÉ 
"The U-TURN project aims at addressing freight urban distribution, focusing on food logistics. The project will contribute to our understanding of freight distribution in urban areas, especially addressing the special requirements and needs of food transportation, and will suggest innovative collaboration practices and tools towards achieving more efficient operations from both an environmental an ...
Voir le projet

 9

 TERMINÉ 
Maritime disasters in recent years are a stark reminder of the imperative need for timely and effective evacuation of large passenger ships during emergency. The Lynceus2Market project addresses this challenge through delivering a revolutionary operational system for safe evacuation based on innovative people localisation technologies.The system consists of: 1) Localisable life jackets that can pr ...
Voir le projet

 16

 TERMINÉ 
The DISIRE project has been inspired by the real existing needs of multiple industrial sectors, including the world leading industrial partners in the non-ferrous, ferrous, chemical and steel industries that are highly connected and already affiliated with the SPIRE PPP and its objectives. The overall clear and measurable objective of the DISIRE project is to evolve the existing industrial process ...
Voir le projet

 15

 TERMINÉ 
Aim of the project is to develop in VET teachers functional skills to integrate systematically in the curricula entrepreneurship education to develop active citizenship and employability, supporting person-centered and experiential learning, through the creation of OER of "Digital storytelling ". Context: the project aims to involve multi-disciplinary teams of teachers, as "agents of change", and ...
Voir le projet

 10

 TERMINÉ 
Despite recent evolutions of tools/practices in the Architecture Engineering, Construction and Facility Management have already resulted in considerable advances, some limitations remain, related to the complexity and variability of building life cycles, addressing building end user awareness and participation, lack of new business models, life cycle fragmentation, limited interoperability of the ...
Voir le projet

 21

 TERMINÉ 
At a local level , the Mancomunidad de Municipios de la sierra de Cádiz, in partnership with the following vocational education centres CPD la Salle, IES Zaframagón, IES Alminares, IES Ntra. Sra. de los Remedios, IES Fuente Grande and IES Guadalpeña, submits this proposal of European mobility program. Our proposal has, as its source, our concern for the labour situation that nowadays suffer our y ...
Voir le projet

 22

 TERMINÉ 
One of the central ideas underlying European Lifelong Learning policies is that international mobility should become a natural part of education and training schemes. This helps learners to achieve higher qualification levels which are crucial for a successful first step into the labour market or for career improvements. The EU Member States are fully committed to helping young people take advanta ...
Voir le projet

 17

 TERMINÉ 

Projet 3-E "Europe, Emploi, Engagement"

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

This consortium is composed of Interechanges, and different Léo Lagrange institutions, based on several regions: East-Central, West and North-Ile de France. For all, we are part of the same economic and social unit of the Federation Léo Lagrange. Since 2008, we have become an international association, with the entry into our boards of European and African administrators. So there is a real desire ...
Voir le projet

 17

 TERMINÉ 
Background It is widely acknowledged that some of the best quality vitreous china sanitary ware comes from Europe, and in particular from Italy and Germany. The European ceramics’ sanitary ware sector employs around 22 000 people directly, and has an annual turnover of €4.5 billion. The industry is characterised by the concentration of large, multinat ...
Voir le projet

 4

 TERMINÉ 
INCONET-GCC2's overall goal is to support the institutional bi-regional policy dialogue in Science, Technology and Innovation, to strengthen the bi-regional cooperation between research and innovation actors, especially in the context of the upcoming Horizon 2020 programme and finally to monitor progress in the bi-regional STI cooperation.INCONET-GCC2 builds on the results of previous cooperation ...
Voir le projet

 20

 TERMINÉ 
The aim of the project is to develop novel systems to monitor earth structures exposed to climate hazard. Following completion of this research and concept demonstration project and subject to additional industry or commercial funding for the development of the technology, this effort is expected to eventually result in new commercial instruments and data management systems which it is in turn ex ...
Voir le projet

 7

 TERMINÉ 
The building envelope (roof, façade and basements) is the key element to address in order to achieve the energy efficiency in the retrofitting of buildings, where the façade represent the largest part of the heat transmission surface and includes a number of critical components (like windows, balconies, ventilation units,etc) and thermal bridge phenomena.The present project aims to develop an ener ...
Voir le projet

 18

 TERMINÉ 
CONTEXT VET@WORK project looks at one of the main challenge of the Europe 2020 Strategy: to reduce Early School Leaving (ESL) to less than 10% and contribute to increasing attainment in tertiary education to at least 40% by 2020. Completing upper secondary education is recommended as the minimum entrance qualification when making the crucial transition from education to the labour market. ESL is a ...
Voir le projet

 27

 TERMINÉ 
Embryonic stem (ES) cells have the potential to differentiate into any type of cell as well as to renew indefinitely in culture. They hold great potential for the development of personalized medicines. However, the molecular mechanisms underpinning cell fate decisions by individual cells are poorly understood. There is compelling evidence that two large multi-protein machines, the Nucleosome Remod ...
Voir le projet

 13

 TERMINÉ 

Mobility in Europe for Vocational Training

Date du début: 1 nov. 2014, Date de fin: 31 oct. 2016,

The project aims to implement a European dimension of learning in the vocational training system and in the business system on the territory of Como, through the implementation of mobility for different targets in the catering and hotel sector and in the wellness industry. Objectives - Increase the chances of employment for young people in the local and European labor market through the enhancemen ...
Voir le projet

 22

 TERMINÉ 

QUALITY - W 2014

Date du début: 1 nov. 2014, Date de fin: 31 oct. 2016,

Even if the tourism and services sectors are now facing difficult times, many areas in Italy have the requirements to set up centres for a new development model, based on the aware and sustainable use of local resources. The main resource to count on is the human one, especially formed in prospect of the new generations who will have to be provided with suitable knowledge and skills, both professi ...
Voir le projet

 26

 TERMINÉ 

Digital Innovation in Training

Date du début: 1 nov. 2014, Date de fin: 31 oct. 2016,

The project DIGIT– Digital Innovation in Training – is addressed to 100 students attending the ultimate and pen-ultimate year of secondary school in the Province of Macerata and it aims at strengthening, within their educational and training path, the use of innovative and flexible methodologies, in order to link school preparation with practical activities, through the experience of transnationa ...
Voir le projet

 45

 TERMINÉ 

Recycling, Resources, entrepeneurship: systemic inclusion and exclusion of garbage

Date du début: 1 nov. 2014, Date de fin: 31 oct. 2016,

The project is promoted by a consortium of 6 High Schools in Rome and its municipalities: 1. I.P.S.S.S. "E. De Amicis” vocational school for opticians, dental technicians, and healthcare assistants (Applicant Organisations) 2. I.P.S.I.A. "C. Cattaneo” vocational school for mechanical engineering 3. I.I.S.S. "Margherita di Savoia" High School Human Science 4. Science High school "Democrito" 5. Agr ...
Voir le projet

 15

 TERMINÉ 

DOMUS FUTURA

Date du début: 1 nov. 2014, Date de fin: 31 oct. 2016,

The Project DomusFutura wants to propose an VET mobility to 60 students of 4th and 5th years, attending the technical network high schools: ITI ‘G. Marconi’ in Bari, ITI ‘G. Ferraris ‘in Molfetta, I.T.C. ‘D. Romanazzi ‘ in Bari. The catchment belong to the regional cluster of mechatronics (MEDIS), which finds its epicenter in the regional chief town. The students come from technology sectors (Mec ...
Voir le projet

 20

 TERMINÉ 

REthinking Sport to Enhance Talents: lifelong sporting

Date du début: 1 nov. 2014, Date de fin: 31 oct. 2016,

The project was born from the desire to create a link between the world of education and the labor market, with reference to the professional categories working in the organization of sporting events. In the education ,in particular, the latest provisions of the Council of Ministers expect that the school will give more space to the topic of Sports. In fact, with the Presidential Decree No. 1 of 0 ...
Voir le projet

 14

 TERMINÉ 

GREEN VALLEY -Nuove frontiere per l’economia delle valli Agno – Chiampo

Date du début: 1 nov. 2014, Date de fin: 31 oct. 2016,

Green Valley project is related to initiative titled ‘From Valle del Chiampo to Green Valley’ coordinated by the Chamber of Commerce of Vicenza and aimed to suggest solutions to the crisis that has hardly hit an area of great export and industrial tradition, especially in local key sectors like tanning, mechanics and metallurgy. the title of the project evokes the transformation of the geograph ...
Voir le projet

 22

 TERMINÉ 

RE-NERGY 2014 – Building the sustainable economy

Date du début: 1 nov. 2014, Date de fin: 31 oct. 2016,

The RE-NERGY Project, with the proposal of 5 weeks transnational mobility, renews its commitment in the field of vocational training by focusing on new themes, but always starting from the needs of the cluster, as a response to the training needs of the productive sectors of the eastern provinces Piedmont (especially Alessandria Province). The focus then becomes polarized toward the handicraft s ...
Voir le projet

 20

 TERMINÉ 

FORINS 2014

Date du début: 1 nov. 2014, Date de fin: 31 oct. 2016,

The project FORINS 2014 is aimed at 115 students attending the long established network of five Technical / technological secondary schools, that also includes an Economic sector, located in an area called “Alto Vicentino”, in the province of Vicenza. The program includes five weeks of internships, the first of which is used for enhancing linguistic and social inclusion and will take place in Ge ...
Voir le projet

 23

 TERMINÉ 

SMART MOBILITY - MOVE BETTER, LEARN FASTER

Date du début: 1 nov. 2014, Date de fin: 31 oct. 2016,

The partners have identified the needs of the beneficiaries, that are at the base of the project, through interviews and focus groups, which showed some problematic elements: - ability to organize in autonomy the work; communicate effectively; availability for work mobility and passion for the profession; - lack of knowledge of the labor market and of motivation towards school and work; difficulti ...
Voir le projet

 32

 TERMINÉ 

Let's Go! Mobilità Trasnazionali e Formative per i Giovani

Date du début: 1 nov. 2014, Date de fin: 31 oct. 2016,

The project Let's Go inserts in the wide context of the objectives of Europe 2020 with the aim of integrating policies for education and training in the Strategy, the mandate that the European Union has given to all operators in the sector. Two key aspects of the Strategy: 1) the promotion of a "sustainable, smart and inclusive" economic growth; 2) the reduction of early dropout in charge of young ...
Voir le projet

 38

 TERMINÉ 

TEAching and Managing of learning groups

Date du début: 1 nov. 2014, Date de fin: 31 oct. 2016,

Total number of Sending Partners: 8 Total number of Participating Organisations: 12 Total number of beneficiary: 80 Length of mobility: 1 week Partner countries: Italy, France, Malta, Spain The purpose of the project TEA.M. are designed to fill the gap currently existing in the italian higher secondary school system where the penetration of cooperative learning systems is still very limited. The p ...
Voir le projet

 22

 TERMINÉ 
One of the central ideas underlying European Lifelong Learning policies is that international mobility should become a natural part of education and training schemes. This helps learners to achieve higher qualification levels which are crucial for a successful first step into the labour market or for career improvements. The EU Member States are fully committed to helping young people take advanta ...
Voir le projet

 18

 TERMINÉ 

Critical System Engineering Acceleration (CRYSTAL)

Date du début: 1 mai 2013, Date de fin: 31 juil. 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr ...
Voir le projet

 70

 TERMINÉ 

Efficient Systems and Propulsion for Small Aircraft (ESPOSA)

Date du début: 1 oct. 2011, Date de fin: 30 juin 2016,

The ESPOSA project will develop and integrate novel design and manufacture technologies for a range of small gas turbine engines up to approx. 1000 kW to provide aircraft manufacturers with better choice of modern propulsion units. It will also deal with engine related systems which contribute to the overall propulsion unit efficiency, safety and pilot workload reduction. Through the newly develop ...
Voir le projet

 45