Rechercher des projets européens

33 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The project will improve the Russia-Finland transport connection by developing the road Vyborg -Svetogorsk/Imatra and reconstructing the bridge over the river Storozhevaya.
Voir le projet

 4

 TERMINÉ 
Background Areas along the River Kokemäenjoki in Southwest Finland, from the river's ancient estuaries to the present estuary, including Lake Puurijärvi, Preiviikinlahti and Kokemäenjoen suisto, are among the most important for bird protection in Finland. They have been assessed as internationally valuable wetlands in many contexts. A number of species ...
Voir le projet

 8

 TERMINÉ 

ROADEX Network Implementing Accessibility 4.1 (ROADEX IV)

Date du début: 30 juin 2009, Date de fin: 29 juin 2012,

... low volume roads Lesson A complete and on website; Lesson B on website and being reviewed; Lesson C draft out for consultation; Lesson D being prepared; Translators appointed; Translations into Finnish, Icelandic, Greenlandic, Norwegian, Swedish commenced. The ROADEX Website – the website was launched on 15 June 2010 and has been populated will all ROADEX materials to date. This website aims t ...
Voir le projet

 11

 TERMINÉ 

BALTIC SEA INFORMATION MOTORWAYS (BaSIM)

Date du début: 31 août 2004, Date de fin: 30 déc. 2007,

Shipment of goods in the BSR increases and will grow in the future even faster. The concept of Baltic Sea Motorways along transnational transport corridors will be based on strong cooperations between players in the transportation field as well as on industry side. Improvement of productivity and competitiveness needs the development both physical and information infrastructure. The first being ad ...
Voir le projet

 29

 TERMINÉ 
... Expected Results: · executive summaries of the published ROADEX works and translations into local Partner languages for ease of use by local staff; Swedish, Norwegian, Finnish, Icelandic and Danish· individual training packages· trials of promising techniques and practices in new areas· a well organised website with good online information and interest group forum· i ...
Voir le projet

 9

 TERMINÉ 

SUSTAINABLE TRANSPORT IN THE BARENTS REGION - PHASE II (STBR II)

Date du début: 10 janv. 2006, Date de fin: 29 déc. 2007,

The objective of the STBR process is to develop a transport strategy for the whole of Barents Region jointly, and as an outcome propose and prepare concrete measures, which in due time can be included in national investment programs of each country. The strategy will rest on the realisation that the transport authorities of all countries need to see the Barents Region as a common transport area an ...
Voir le projet

 26

 TERMINÉ 

Main road 9127 Ukonlampi–Vartius

Date du début: 30 sept. 2006, Date de fin: 30 oct. 2007,

...ing through hills and strengthening the structural foundation of the roads layers. 50 percent of the project funding was received from the European Regional Development fund and 50 percent from the Finnish Road Administration. Achievements: The project was completed as ...
Voir le projet

 1

 TERMINÉ 

Management of wetlands along the Gulf of Finland migratory flyway (Gulf of Finland)

Date du début: 1 juil. 2003, Date de fin: 30 juin 2007,

Background Along the flyway of Northern Coastal Gulf of Finland, waterfowl and waders wintering in the southern part of the Baltic Sea and the coasts of the North Sea migrate in the spring to their breeding regions and in the autumn back to their wintering regions. The 12 project areas along the flyway are internationally valuable bird-rich wetlands in wh ...
Voir le projet

 17

 TERMINÉ 
...ove traffic flow at the border station as well the occupational safety of employees. 50 percent of the project funding was received from the European Regional Development fund and 50 percent from the Finnish Road Administration. Achievements: The telemetric traffic cont ...
Voir le projet

 1

 TERMINÉ 
...n, the existing road structures were to be reinforced throughout the traffic area. 50 percent of the project funding was received from the European Regional Development fund and 50 percent from the Finnish Road Administration. Achievements: The project’s road structures ...
Voir le projet

 1

 TERMINÉ 
...rocedures arerelated to the internationalisation of the Kuusamo border crossing point.50 percent of the project funding was received from the European Regional Development fund and 50 percent fromthe Finnish Road Administration. Achievements: The lane arrangements of ma ...
Voir le projet

 1

 TERMINÉ 

Widening the bridges on main road 89 between motorway 5 and Vartius

Date du début: 31 janv. 2005, Date de fin: 30 déc. 2006,

...and and Russia in particular, as well as having an obvious effect on traffic safety. 50 percent of the project funding was received from the European Regional Development fund and 50 percent from the Finnish Road Administration. Achievements: The bridges and bridge emba ...
Voir le projet

 1

 TERMINÉ 

North East Cargo Link (NECL)

Date du début: 31 déc. 2002, Date de fin: 2 déc. 2006,

Rail and road transports in the Northern Europe and the southern part of the Nordic Countries are presently hampered by congestion, causing traffic infarcts, high pollution, slow transport speeds and a threat to economic competitiveness. These problems are becoming more severe with the increasing traffic load.North East Cargo Link (NECL) is aiming at promoting and marketing new, speedy and safe in ...
Voir le projet

 45

 TERMINÉ 

Widening the bridges on main road 89 between motorway 5 and Vartius, phase II

Date du début: 17 avr. 2005, Date de fin: 30 oct. 2006,

...project application was submitted and funding consequently received for the project. 50 percent of the project funding was received from the European Regional Development fund and 50 percent from the Finnish Road Administration. Achievements: The bridges were widened as ...
Voir le projet

 1

 TERMINÉ 

A Conversion Training Programme on Russian culture and language

Date du début: 31 déc. 2001, Date de fin: 29 juin 2006,

The departments of the University of Oulu in Kajaani make up an important base with regard to know-how about Russia. Th e implementation of cooperative strategies devised with the Russian parties requires academically educated people with Russian language skills. Already some years ago, there was an initiative made to the University of Oulu about an education programme in relationships, know-how a ...
Voir le projet

 7

 TERMINÉ 

SUSTAINABLE TRANSPORT IN THE BARENTS REGION (STBR) (STBR )

Date du début: 9 mars 2003, Date de fin: 8 janv. 2006,

General objectives for STBR project are to strengthen transport planning cooperation in the Barents Region; increase the common understanding of transport problems in the region; help decision makers, planners, authorities and companies to see the region as a single transport area and to promote sustainable development in the region.These goals will be achieved by improving region-wide transport i ...
Voir le projet

 25

 TERMINÉ 

Bothnian Arc - Arctic Coastal Tourism Region (BothnianArc-ACTion )

Date du début: 25 juin 2002, Date de fin: 24 sept. 2005,

Bothnian Arc is a Swedish-Finnish coastal zone in the northern part of the Gulf of Bothnia with a sub-arctic climate. Thanks to the Gulf Stream, it has four distinct seasons and offers exotic tourism destinations in an arctic coast and archipelago milieu. However the tourism profile of the region and tourism competence there have to be strengthened. A trans-national co-operation for the developmen ...
Voir le projet

 33

 TERMINÉ 

Constructing the fast lanes on main road 70 at the Niirala border station

Date du début: 30 avr. 2004, Date de fin: 30 août 2005,

... standards as well as the level required by EU’s border traffic practices. 50 percent of the project funding was received from the European Regional Development fund and 50 percent from the Finnish Road Administration. Achievements: The Niirala border station lane arran ...
Voir le projet

 1

 TERMINÉ 
Roadex proposes a 3-year trans-national technical collaboration across the Northern Periphery to develop ways for interactive and innovative road management of low traffic volume roads. The project will deal directly with road and transport issues raised by the unique combinations of remoteness, climate, ground conditions, low traffic volumes and long distances to markets. The main issues to be ad ...
Voir le projet

 10

 TERMINÉ 

Improving the safety of the Niirala border traffic

Date du début: 31 mars 2004, Date de fin: 30 janv. 2005,

The main road 70 leads to Niirala border crossing station. The quantity of traffic passing through Niirala increases steadily. As a result of the increasing traffic volume also the traffic safety risks increase. The project will improve traffic safety by completing road lighting in risky places on the main road 70 and on the road 486 between Onkam and Niirala as well as between Puhos and Tohmajärv ...
Voir le projet

 1

 TERMINÉ 
Background The project addressed two major environmental problems that exist in every European country with significant industry and construction activities. Firstly, environmental damage is caused to the ecological system, landscape and ground water resources when non-renewable natural stone materials are used to construct roads, landfills and other civi ...
Voir le projet

 2

 TERMINÉ 

Main road 9131 Isopalo–Lehtovaara

Date du début: 31 mai 2004, Date de fin: 30 déc. 2004,

...quipment from Russia to Finland via the border crossing point would be made easier. Fifty percent of the project funding was received from the European Regional Development fund and 50 % from the Finnish Road Administration. Achievements: In order to enable easier year- ...
Voir le projet

 1

 TERMINÉ 

Main road 866 Jussinpuro–Pahalampi

Date du début: 31 déc. 2002, Date de fin: 30 déc. 2004,

Main road 866 leads to Russia through the Kuusamo border crossing point. Th e road is 46 km long and it bears logging traffi c from Paanajärvi in the direction of Finland. Th e road has been improved along several diff erent sections since 1995. Th e improvement work was completed to prepare for the needs of traffi c crossing the border when the Kuusamo border crossing point was to become internat ...
Voir le projet

 1

 TERMINÉ 

Main road 70 Niirala border guard station land-use planning

Date du début: 31 janv. 2003, Date de fin: 30 août 2004,

... A master plan was created regarding the border area expansion and traffic arrangements, which can be used to determine the future land-use areas necessary for development. Customs, the Finnish Border Guard, Vrtsil Municipality, the Regional Council of North Karelia, Senate Properties and the Finnish Road Administration all actively participated in the planning process. During the pl ...
Voir le projet

 1

 TERMINÉ 
... would be created for the road arrangements and inspection point completion phasing. 50 percent of the project funding was received from the European Regional Development fund and 50 percent from the Finnish Road Administration. Achievements: The Oulu Road Region began ...
Voir le projet

 1

 TERMINÉ 

Improving traffic safety and flow on main road 70 Onkamo–Niirala

Date du début: 31 mars 2002, Date de fin: 29 sept. 2003,

...jonniemi school, to add bypass areas to intersections and to increase road lighting. 50 percent of the project funding was received from the European Regional Development fund and 50 percent from the Finnish Road Administration. Achievements: The planned procedures were ...
Voir le projet

 1

 TERMINÉ 

Main road 866 Sirola crossroads–Jussinpuro

Date du début: 9 sept. 2001, Date de fin: 30 déc. 2002,

...n as improving the reliability of deliveries as well as decreasing transport costs. 50 percent of the project funding was received from the European Regional Development fund and 50 percent from the Finnish Road Administration. Achievements: The renovation and repair wo ...
Voir le projet

 1

 TERMINÉ 
The objective: The increasing problems due to heavy traffic, especially, need to be reduced by improving the existing road in stages. In one of the most problematic stretches between Kauriansalmi in Suomenniemi and Ostolahti in Ristiina the safety and fluency of traffic will be improved by adding overtaking lanes (2), by rearranging private roads, and by means of erecting elk fences and clearing w ...
Voir le projet

 1

 TERMINÉ 
The objective: The central task is to improve the E 18 main road 7 between Virojoki and Vaalimaa. Main road 7 is part of the European road E 18 conveying international and national traffic along the south coast of Finland. The road is the most important link for passenger and freight traffic between Finland and Russia
Voir le projet

 1

 TERMINÉ 
The aim of the project is to widen and improve the Lakijänkä overpass, which is situatedat main road no. 82 between Kursu and Salmivaara in the Municipality of Salla. Theimprovement will also enhance visibility while the widening will especially promote thesafety and fluency of heavy traffic passing through the border-crossing point atKelloselkä.
Voir le projet

 1

 TERMINÉ 
The purpose of the project is to implement a planting arrangement plan for thesurroundings of Kelloselkä border-crossing station.
Voir le projet

 1

 TERMINÉ 
A central measure is E 18, improvement of the main road 7 between Virojoki and Vaalimaa.Road 7 is part of the European Road E 18, which carries international and national traffic along the south coast of Finland. The road is the most important passenger and goods vehicle traffic connection between Finland and Russia. Border traffic and new business originating from it have increased, resulting in ...
Voir le projet

 1

 TERMINÉ 
The aim of the project is to ease night-time traffic at the border-crossing station throughgate arrangements. At the same time, traffic arrangements in the area and the facilitiesin the local rest area will be improved so as to enhance the overall safety andpleasantness of the area.
Voir le projet

 1