Rechercher des projets européens

23 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Internet of Food and Farm 2020 (IoF2020)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

The IoF2020 project is dedicated to accelerate adoption of IoT for securing sufficient, safe and healthy food and to strengthen competitiveness of farming and food chains in Europe.It will consolidate Europe’s leading position in the global IoT industry by fostering a symbiotic ecosystem of farmers, food industry, technology providers and research institutes.The IoF2020 consortium of 73 partners, ...
Voir le projet

 72

 TERMINÉ 
The main objective of this project is to move forward the current waste management practices into a circular economy motto, demonstrating the value of integrating and validating a set of 20 eco-innovative solutions that cover all the waste value chain. The benefits of these solutions will be enhanced by a holistic waste data management methodology, and will be demonstrated in 4 complementary urban ...
Voir le projet

 19

 TERMINÉ 
5G will realise a true Internet of Things, a network capable of supporting potentially trillions of wireless connected devices and with overall bandwidth one thousand times higher that today’s wireless networks. Current 4G technology is approaching the limits of what is possible with this generation of radio technology and to address this, one of the key requirements of 5G will be to create a netw ...
Voir le projet

 11

 TERMINÉ 
The ehcoBUTLER Idea:Nowadays, it is a fact that Europe is ageing. A common characteristic of elders is the frequent occurrence of either physical or mild cognitive impairments. This situation brings new challenges in how to improve the independence and quality of life of elderly people and promote their good health in different ways. The ehcoBUTLER project addresses this challenge by developing an ...
Voir le projet

 14

 TERMINÉ 

Towards transparencY and Privacy in the onlinE advertising businesS (TYPES)

Date du début: 1 mai 2015, Date de fin: 31 oct. 2017,

Online advertising generated in 2013 $42B worth of revenue and more than 3.4 million direct and indirect jobs in Europe in 2012 alone. It supports some of the most important Internet services such as search, social media and user generated content sites. However, the lack of transparency regarding tracking techniques and the type of information companies collect about users is creating increasing ...
Voir le projet

 10

 TERMINÉ 
The mmMAGIC (Millimetre-Wave Based Mobile Radio Access Network for Fifth Generation Integrated Communications) project will develop and design new concepts for mobile radio access technology (RAT) for mm-wave band deployment. This is envisaged as a key component in the 5G multi-RAT ecosystem and will be used as a foundation for global standardization. The project will thus enable ultrafast mobile ...
Voir le projet

 19

 TERMINÉ 

An integrated development environment for portable network applications (NetIDE)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

While most of programmable network gear vendors support OpenFlow nowadays, a number of fragmented control plane solutions exist for proprietary software-defined networks. Thus, network applications developers need to re-code their solutions every time they target a network infrastructure based on a different controller. Moreover, different network developers adopt different solutions as abstract c ...
Voir le projet

 10

 TERMINÉ 
TUCAN3G is built upon the basic premise that considers information and communications as a key factor of human development. The diffusion of ICT in developing countries has been very asymmetric between densely populated urban areas and isolated rural areas. Geographical conditions have often conditioned solutions for Internet connectivity in rural areas, often based on wireless 2G cellular technol ...
Voir le projet

 9

 TERMINÉ 
Motivation. The last decades brought an exponential increase in mobile traffic volume. This will continue and a 1000-fold increase by 2020 has been forecasted. Small-cells promise to provide the required data rates through an increased spatial utilisation of the spectrum.Problem statement. Due to strong inter-cell interference, small-cell deployments will require a high degree of coordination as o ...
Voir le projet

 12

 TERMINÉ 

Live Video-to-Video Supporting Interactive City Infrastructure (LiveCity)

Date du début: 1 avr. 2012, Date de fin: 31 janv. 2015,

The aim of LiveCity is to empower the citizens of a city to interact with each other in a more productive, efficient and socially useful way by using high quality video-to-video (v2v) over the Internet. Video-to-video can be used to save patients' lives, improve city administration, reduce fuel costs, reduce carbon footprint, enhance education and improve city experiences for tourists and cultural ...
Voir le projet

 18

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Voir le projet

 92

 TERMINÉ 

Harmonised eCall European Pilot - Phase 2 (HeERO2)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2014,

The overall objective of HeERO 2 is "To extend HeERO to new Member States or associated countries to demonstrate the scalability of the HeERO solution and to widen the acceptance of eCall."To support this objective there are three aims:(1) to prepare the necessary infrastructure to realize interoperability of "eCall" at European level, (2) to boost Member States investment in the PSAP infrastructu ...
Voir le projet

 42

 TERMINÉ 

European Coordinating Body in Maths, Science and Technology Education (ECB) (ECB)

Date du début: 1 févr. 2011, Date de fin: 31 oct. 2014,

The European Coordinating Body in Maths, Science and Technology Education (ECB) is a large-scale strategic response to the FP7 call to reinforce links between science education and science and technology careers in the private sector through reinforcing the partnership industry/education.The overall aim of the ECB is to increase young Europeans’ interest in mathematics, science and technology (MST ...
Voir le projet

 29

 TERMINÉ 

Complete Ambient Assisted Living Experiment – Market Validation (CAALYX-MV)

Date du début: 1 févr. 2011, Date de fin: 31 janv. 2014,

Description The objective of Caalyx-MV is to widely validate an innovative and efficient ICT-based solution focused on improving the quality of life of the elderly. This is to be achieved through prolonging the time they can safely remain autonomous and independent at home through monitoring and controlling their social and health status and ...
Voir le projet

 9

 TERMINÉ 

Multidimensional context-aware adaptation of Service Front-ends (Serenoa)

Date du début: 1 sept. 2010, Date de fin: 30 sept. 2013,

Serenoa is aimed at developing a novel, open platform for enabling the creation of context-sensitive service front-ends (SFEs). A context-sensitive SFE provides a user interface (UI) that exhibits some capability to be aware of the context and to react to changes of this context in a continuous way. As a result such a UI will be adapted to a person's devices, tasks, preferences, and abilities, thu ...
Voir le projet

 7

 TERMINÉ 

Building the PaaS Cloud of the Future (4CaaST)

Date du début: 1 juin 2010, Date de fin: 31 août 2013,

To survive in today's economy; short time-to-market and efficiency are paramount for the creation of innovative products and to survive in the current economic climate. This is especially true for IT services which will dominate the way people work and live in the future.Cloud computing is essentially changing the way services are built, provided and consumed. Despite simple access to Clouds, buil ...
Voir le projet

 18

 TERMINÉ 

FLexible Architecture for \nVirtualizable wireless future Internet Access (FLAVIA)

Date du début: 1 juil. 2010, Date de fin: 30 juin 2013,

Wireless networks importance for the Future Internet is raising at a fast pace as mobile devices increasingly become its entry point. However, today's wireless networks are unable to rapidly adapt to evolving contexts and service needs due to their rigid architectural design.We believe that the wireless Internet's inability to keep up with innovation directly stems from its reliance on the traditi ...
Voir le projet

 12

 TERMINÉ 

Integrated Network for Completely Assisted Senior citizen's Autonomy (inCASA)

Date du début: 1 avr. 2010, Date de fin: 30 juin 2013,

Description The aim of INCA is to validate and to start a pragmatic Initial Deployment in Europe, of inclusive friendly and engaging multi-channel “patient-centric” communication care Networks of integrated socio-sanitary care e-Services (integration of the whole personalised care chain provision of health care, social care, long-term and se ...
Voir le projet

 13

 TERMINÉ 

SAIL: Scalable & Adaptive Internet soLutions (SAIL)

Date du début: 1 août 2010, Date de fin: 28 févr. 2013,

SAIL's objective is the research and development of novel networking technologies using proof-of-concept prototypes to lead the way from current networks to the Network of the Future.SAIL leverages state of the art architectures and technologies, extends them as needed, and integrates them using experimentally-driven research, producing interoperable prototypes to demonstrate utility for a set of ...
Voir le projet

 26

 TERMINÉ 

Field Operational Tests of Aftermarket and Nomadic Devices in Vehicles (TELEFOT)

Date du début: 1 juin 2008, Date de fin: 30 nov. 2012,

Description TeleFOT project will assess the impacts of functions provided by aftermarket and nomadic devices in vehicles and raise wide awareness of their traffic safety potential. The objectives of the TeleFOT project are to assess the impacts of functions provided by aftermarket and nomadic devi ...
Voir le projet

 29

 TERMINÉ 

A Metropolis of Ubiquitous Services (m:Ciudad)

Date du début: 1 déc. 2007, Date de fin: 30 nov. 2010,

Description The final goal of the m:Ciudad project is to set up the basis for the engineering of a complete new service infrastructure, a metropolis of truly ubiquitous services...M:CIUDAD's primary goal is to set up the basis for the engineering of a complete new service infrastructure, a metropolis of truly ubiquitous services with the ...
Voir le projet

 10

 TERMINÉ 

4WARD - Architecture and Design for the Future Internet (4WARD)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2010,

Today's network architectures are stifling innovation, restricting it mostly to the application level while the need for structural change is increasingly evident. The absence of adequate facilities to design, optimize and interoperate new networks currently forces a convergence to an architecture that is suboptimal for many applications and that cannot support innovations within itself, the Inter ...
Voir le projet

 39

 TERMINÉ 
The WebPOL project will develop a virtual learning environment for European police personnel, with a particular focus upon three profiles, namely, police officer, inspector and official. The project will initially undergo an analysis of the training needs for the three local police services selected for the pilot (Valencia, Bologna and Bremen). Further activities will include the development of th ...
Voir le projet

 14