Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Integrating National Research Agendas on Solar Heat for Industrial Processes (INSHIP)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

Despite process heat is recognized as the application with highest potential among solar heating and cooling applications, Solar Heat for Industrial Processes (SHIP) still presents a modest share of about 0.3% of total installed solar thermal capacity. As of today’s technology development stage – economic competitiveness restricted to low temperature applications; technology implementation requiri ...
Voir le projet

 32

 TERMINÉ 

European Nuclear Science and Application Research 2 (ENSAR2)

Date du début: 1 mars 2016, Date de fin: 29 févr. 2020,

ENSAR2 is the integrating activity for European nuclear scientists who are performing research in three of the major subfields defined by NuPECC: Nuclear Structure and Dynamics, Nuclear Astrophysics and Nuclear Physics Tools and Applications. It proposes an optimised ensemble of Networking (NAs), Joint Research (JRAs) and Transnational Access Activities (TAs), which will ensure qualitative and qua ...
Voir le projet

 31

 TERMINÉ 
Society as a whole is increasingly exposed and vulnerable to natural disasters because extreme weather events, exacerbated by climate change, are becoming more frequent and longer. To increase the resilience of European citizens and assets to natural disaster we propose I-REACT: Improving Resilience to Emergencies through Advanced Cyber Technologies. The proposed system targets public administrati ...
Voir le projet

 20

 TERMINÉ 

Critical Infrastructure Protection using Adaptive MILS (CITADEL)

Date du début: 1 juin 2016, Date de fin: 31 mai 2019,

Critical infrastructures (CI) rely on complex safety- and security-critical ICT systems placed into unpredictable environments and forced to cope with unexpected events and threats while exhibiting safe adaptive behavior. Recent security trends stress continuous adaptation to increase attacker work factor and to confound reverse-engineering. Critical CI systems must undergo extensive and costly sc ...
Voir le projet

 14

 TERMINÉ 

Advanced European Infrastructures for Detectors at Accelerators (AIDA-2020)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2019,

Particle physics is at the forefront of the ERA, attracting a global community of more than 10,000 scientists. With the upgrade of the LHC and the preparation of new experiments, the community will have to overcome unprecedented challenges in order to answer fundamental questions concerning the Higgs boson, neutrinos, and physics beyond the Standard Model. Major developments in detector technology ...
Voir le projet

 38

 TERMINÉ 
Embedded systems have significantly increased in technical complexity towards open, interconnected systems. This has exacerbated the problem of ensuring dependability in the presence of human, environmental and technological risks. The rise of complex Cyber-Physical Systems (CPS) has led to many initiatives to promote reuse and automation of labor-intensive activities. Two large-scale projects are ...
Voir le projet

 32

 TERMINÉ 

All Solid-State Super-Twinning Photon Microscope (SUPERTWIN)

Date du début: 1 mars 2016, Date de fin: 28 févr. 2019,

The goal of the project is to develop the technology foundation for an advanced optical microscope imaging at a resolution beyond the Rayleigh limit, which is set by the photon wavelength. The proposed microscope technique is based on super-twinning photon states (N-partite entangled states) with the de Broglie wavelength equal to a fraction of the photon wavelength. Such microscopy technique will ...
Voir le projet

 9

 TERMINÉ 
A seamless interaction with the public administration (PA) is crucial to make the daily activities of companies and citizens more effective and efficient, saving time and money in the management of administrative processes. In particular, online public services have an enormous potential for reducing the administrative burden of companies and citizens, as well as for creating saving opportunities ...
Voir le projet

 10

 TERMINÉ 
The visually impaired and the elderly, often suffering from mild speech and/or motor disabilities, are experiencing a significant and increasing barrier in accessing ICT technology and services. Yet, in order to be able to participate in a modern, interconnected society that relies on ICT technologies for handling everyday issues, there is clear need also for these user groups to have access to IC ...
Voir le projet

 8

 TERMINÉ 
REPLICATE will assemble a world-class team of creative thinkers from research and private sectors to:- Fuel the creative industries’ growing demand for high-quality content by developing a user-centric, mobile-based, 3D-acquisition tool to transform the real-world into new forms of creative-assets by recruiting and encouraging the involvement of everyone.- Establish rich and flexible forms of reus ...
Voir le projet

 7

 TERMINÉ 

Universal Nanotechnology Skills Creation and Motivation Development

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2018,

The objective of this Project consists of development of education materials (cirruculum, e-learning materials, mobile applications, guide , and course book preparation), and bringing together students of applied sciences and Professional nanotechnology scientists together, through workshops and seminars, where scientists will share their knowledge and applications. The guide and information relat ...
Voir le projet

 7

 TERMINÉ 

FOREnsic evidence gathering autonomous seNSOR (FORENSOR)

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

Covert evidence gathering has not seen major changes in decades. Law enforcement Agencies (LEAs) are still using conventional, manpower based techniques to gather forensic evidence. Concealed surveillance devices can provide irrefutable evidences, but current video surveillance systems are usually bulky and complicated, are often used as simple video recorders, and require complex, expensive infra ...
Voir le projet

 11

 TERMINÉ 
The use of advanced methods to solve practical and industrially relevant problems by computers has a long history. Whereas Symbolic Computation is concerned with the algorithmic determination of exact solutions to complex mathematical problems, more recent developments in the area of Satisfiability Checking tackle similar problems but with different algorithmic and technological solutions. Though ...
Voir le projet

 11

 TERMINÉ 
The number of available software applications in the form of web services, mobile apps, etc., is dramatically increasing over the years. This software exploits data collected through various sensors, and online data sources. Its users can access it through a variety of devices, mostly based on mobile technology. Software providers can hardly predict the acceptance of the applications they deliver. ...
Voir le projet

 8

 TERMINÉ 

Graphene-based disruptive technologies (GrapheneCore1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Voir le projet

 158

 TERMINÉ 

Monitoring Technology Enhanced Pedagogy

Date du début: 1 mars 2015, Date de fin: 28 févr. 2018,

MENTEP (MENtoring Technology-Enhanced Pedagogy), a policy experiment involving public authorities in 13 countries, coordinated by European Schoolnet, aims to:Develop a reliable, user-friendly and sustainable tool for teachers to self-assess progress in 1СГ competenceTest the tool's usefulness using rigorous counterfactual protocols, its effect on ICT competencies and peer learningBased on data fro ...
Voir le projet

 16

 TERMINÉ 
The function of a lower limb prosthetic is highly dependent upon the characteristics and anatomical profile of the residual limb. This is unique to each individual and changes depending on the activities being engaged in by the amputee. A poorly fitting prosthetic socket can cause significant trauma so it is important to consider how to optimise the fit to maximise the amputee's comfort whilst we ...
Voir le projet

 9

 TERMINÉ 
Concentrating Solar Thermal Energy encompasses Solar Thermal Electricity (STE), Solar Fuels, Solar Process Heat and Solar Desalination that are called to play a major role in attaining energy sustainability in our modern societies due to their unique features: 1) Solar energy offers the highest renewable energy potential to our planet; 2) STE can provide dispatchable power in a technically and eco ...
Voir le projet

 42

 TERMINÉ 
The WeLive project is devised to transform the current e-government approach by facilitating a more open model of design, production and delivery of public services leveraging on the collaboration between public administrations (PAs), citizens and entrepreneurs. WeLive applies the quadruple-helix approach based on the joint collaboration of 3 PAs, 4 research agents and 5 companies, constituing the ...
Voir le projet

 12

 TERMINÉ 

QT21: Quality Translation 21 (QT21)

Date du début: 1 févr. 2015, Date de fin: 31 janv. 2018,

A European Digital Single Market free of barriers, including language barriers, is a stated EU objective to be achieved by 2020. The findings of the META-NET Language White Papers show that currently only 3 of the EU-27 languages enjoy moderate to good support by our machine translation technologies, with either weak (at best fragmentary) or no support for the vast majority of the EU-27 languages. ...
Voir le projet

 14

 TERMINÉ 
We propose visionary research to develop modeling, computational, and ICT tools needed to predict and influence disease spread and other contagion phenomena in complex social systems. To achieve non-incremental advances we will combine large scale, realistic, data-driven models with participatory data-collection and advanced methods for Big Data analysis. In particular we will go beyond the one-di ...
Voir le projet

 8

 TERMINÉ 
The goal of MMT is to deliver a language independent commercial online translation service based on a new open-source machine translation distributed architecture. MMT does not require any initial training phase. Once fed with training data MMT will be ready to translate. MMT de-facto will merge translation memory and machine translation technology into one single product. Quality of translations ...
Voir le projet

 4

 TERMINÉ 
The European machine translation (MT) research community is experiencing increased pressure for rapid success – from the legal and political frameworks and schedules of the EU, such as the Digital Single Market, but also from the globalising business world. At the same time, the research community has to cope with a striking disproportion between the scope of the challenges and the available resou ...
Voir le projet

 7

 TERMINÉ 

Ubiquitous iNteroperable Care for Ageing People (UNCAP)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

The lack of ICT platforms based on open standards is regarded as one of the most significant market barriers to the creation of new care & assistance paradigms with global interconnection and interworking. UNCAP delivers an interoperable platform based on open industrial standards that leverages on existing technologies for biosensing, indoor/outdoor localisation and home-automation. The result is ...
Voir le projet

 23

 TERMINÉ 
"A scalable, replicable, high energy efficient, zero emissions and cost effective SYSTEM to refurbish existing public-owned non-residential buildings to achieve at least 50% energy consumption reduction through:a) A systemic methodology for optimal building retrofitting towards zero emissions, developed to ensure cost effectiveness, scalability and replicability of the interventions taking into ac ...
Voir le projet

 18

 TERMINÉ 
"Cultural Heritage (CH) is an integral element of Europe and vital for the creation of a common European identity and one of the greatest assets for steering Europe’s social, economic development and job creation. However, the current research training activities in CH are fragmented and mostly design to be of a single-discipline, failing to cover the whole lifecycle of Digital Cultural Heritage ( ...
Voir le projet

 14

 TERMINÉ 
"This proposal is for a European Industrial Doctorate on SECurity and Trust of Next Generation ENTerprise Information Systems (SECENTIS). In the near future, the security needs of enterprises and organizations will increase and be more varied, ranging from the protection of own resources to those managed on behalf of end-users and customers. These desiderata will be particularly important for ven ...
Voir le projet

 2

 TERMINÉ 
"The purpose of the project INSERT is to provide clinically relevant stratification and improved personalized radio-chemo therapy for brain tumour patients using a specifically developed multi-modality imaging tool. The system will also be used for early assessment of treatment efficacy. The initial focus will be on patients with glioma but there is future potential to target a range of tumours in ...
Voir le projet

 10

 TERMINÉ 

Female Empowerment in Science and Technology Academia (FESTA)

Date du début: 1 févr. 2012, Date de fin: 31 janv. 2017,

"FESTA is concerned with implementing changes in the working environment of academic researchers, to encourage female researchers to stay and make a career in the academy and to create organizational environments where their competence is valued and fostered. In particular, we address the working environment of researchers in the lower levels of their careers, to make it possible for them to advan ...
Voir le projet

 8

 TERMINÉ 

Indoor/outdoor LOCation and Asset management Through open gEodata (i-locate)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

The goal of i-locate is twofold. First it will create a virtual hub for indoor open geographical data regarding public spaces (hospitals, public offices, shopping malls, museums etc). This will have significant economic business impact and it will be enable a number of indoor/outdoor (based on existing open data) businesses.The second goal is to create a easy-to-integrate open middleware for indoo ...
Voir le projet

 25

 TERMINÉ 
In the milk industry, one of most pressing unmet needs is the timely detection of mycotoxins that originate from animal feed and are secreted into milk. In particular, milk and dairy products can be contaminated by aflatoxin M1, a potent carcinogen. The aflatoxin contamination represents a hazard for human health and an economic loss for the dairy industry. The available technology for aflatoxin d ...
Voir le projet

 10

 TERMINÉ 

Advanced Software Protection: Integration, Research and Exploitation (ASPIRE)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

Traditional security solutions based on custom hardware like smart cards, set-top boxes, and dongles, are not convenient on mobile devices like smartphones and tablets. Software protection is therefore utterly important; it can be a maker and breaker in domains like multi-screen mobile TV, software licensing, and credentials and sensitive data stored on mobile devices. However, current software pr ...
Voir le projet

 8

 TERMINÉ 

CIVIS

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

Smart grids make current energy networks more intelligent and accessible; new ways of producing energy will soon make citizens not only energy users but also energy producers. The CIVIS project explores the potential of social networks and communities to significantly reduce energy use and carbon emissions. We'll enable this by developing business models for the resulting energy value system and s ...
Voir le projet

 12

 TERMINÉ 

Subject-Orientation for People-Centred Production (SO-PC-Pro)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

European production companies face a variety of challenges arising from the increasingly complex and dynamic environment in which they operate. These challenges have been understood mostly in economic terms based on the time-cost-quality triangle. The main approach to tackling these challenges has been to rationalise production processes through standardised work procedures and automated systems, ...
Voir le projet

 12

 TERMINÉ 

Steering towards Green and Perceptive Mobility of the Future (STREETLIFE)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

The goal of the STREETLIFE project is the reduction of carbon emissions through a sustainable mobility concept in cities based on ICT. In particular, the aim of the project is to reduce the number of car trips by i) informing commuters about the existing transport alternatives and their real value (in terms of time, cost, carbon footprint), ii) enhancing public transport to meet the needs of the c ...
Voir le projet

 13

 TERMINÉ 

Collaborative Network for Training in Electronic Skin Technology (CONTEST)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2016,

"Future electronic systems will be bendable and conformable. They will be wearable, disposable, and ubiquitous. CONTEST will train young researchers in the fast expanding field of flexible and large area electronics with emphasis on “wearable” devices.Training will be implemented through well-defined work packages covering critical aspects of flexible electronics, converging towards an electronica ...
Voir le projet

 7

 TERMINÉ 

Future INternet and Open Data EXpansion (FINODEX)

Date du début: 1 juin 2014, Date de fin: 31 août 2016,

FINODEX is a project born to provide new economic and societal value to the European society, through the promotion and the support of innovative ICT services based on FI-PPP technologies and the massive reuse of open data while involving the SMEs and Web entrepreneurs on their creation. They will be able to take advantage of the availability of open data and FI-PPP technologies to create, in a fa ...
Voir le projet

 14

 TERMINÉ 

Critical System Engineering Acceleration (CRYSTAL)

Date du début: 1 mai 2013, Date de fin: 31 juil. 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr ...
Voir le projet

 70

 TERMINÉ 

High energy density Mg-Based metal hydrides storage system (EDEN)

Date du début: 1 oct. 2012, Date de fin: 30 juin 2016,

EDen aims at building a forefront scientific, technological and industrial expertise in energy storage and recovery system. In the past years hydrogen has been indicated as an advantageous energy carrier under many points of view, mainly environment preservation and high energy density.The necessity of hydrogen on specific mobile applications and energy backup system is promoted by the growing dem ...
Voir le projet

 7

 TERMINÉ 

Centre for ExcelleNce in TerRItorial management and Cadastre (CENTRIC)

Date du début: 1 juin 2015, Date de fin: 31 mai 2016,

Unlike most European countries, Romania does not have yet a general cadastre. Such a deficiency represents a critical element for the economy of the country, since it makes legal contracts, such as land purchasing, very difficult to be implemented. Starting from such a complex scenario, CENTRIC aims –in the long term- at the creation in Romania of the new Centre of Excellence on territorial manag ...
Voir le projet

 8