Rechercher des projets européens

25 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Future Sky Safety

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2018,

The EC Flight Path 2050 vision aims to achieve the highest levels of safety to ensure that passengers and freight as well as the air transport system and its infrastructure are protected. However, trends in safety performance over the last decade indicate that the ACARE Vision 2020 safety goal of an 80% reduction of the accident rate is not being achieved. A stronger focus on safety is required. T ...
Voir le projet

 32

 TERMINÉ 
AGILE targets multidisciplinary optimization using distributed analysis frameworks. The involvement of many disciplinary analyses ranging up to high levels of fidelity and agile workflow management are considered to be state-of-the-art and starting point for AGILE. Advanced optimization techniques and strategies will be developed in order to exploit available computing systems and to gain faster c ...
Voir le projet

 20

 TERMINÉ 
AFLoNext is a four year EC L2 project with the objective of proving and maturing highly promising flow control technologies for novel aircraft configurations to achieve a quantum leap in improving aircraft’s performance and thus reducing the environmental footprint. The project consortium is composed by forty European partners from fifteen countries. The work has been broken down into seven work p ...
Voir le projet

 41

 TERMINÉ 
The ability to simulate aerodynamic flows using CFD methods has progressed rapidly over the last decades and has given rise to a change in design processes in aeronautics already. But more improvement is necessary to overcome the (still) existing lack in confidence in CFD usage, based on turbulence modelling. The TILDA project will offer methods and approaches combining advanced and efficient high ...
Voir le projet

 12

 TERMINÉ 

Aerodynamic and acouStic for high-by-Pass ratIo tuRbofan intEgration (ASPIRE)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2017,

The ASPIRE proposal, gathering DLR, NLR, ONERA and TsAGI, responds to the topic JTI-CS2-2014-CFP01-AIR-01-01 “Aerodynamic and acoustic capabilities developments for close coupling, high by-pass ration turbofan Aircraft integration”. The comprehensive experience of the partners working on innovative engine aircraft integration concepts both individually and in previous collaborative efforts motivat ...
Voir le projet

 4

 TERMINÉ 
BUTERFLI is a project in response to the invitation to tender from European Commission FP7 within Call FP7-AAT-2013 RTD-Russia.BUTERFLI is the acronym of BUffet and Transition delay control investigated within Europe-Russia cooperation for improved FLIght performances. The Project Topic will focus on experimental and numerical flow control investigations of different phenomena: the buffet on a lam ...
Voir le projet

 13

 TERMINÉ 

High Altitude Ice Crystals (HAIC)

Date du début: 1 août 2012, Date de fin: 31 janv. 2017,

Commercial aircraft have been experiencing in-service events while flying in the vicinity of deep convective clouds since at least the early 1990s. Heated probes and engines are the areas of air-craft most prone to mixed phase and glaciated icing threat. In anticipation of regulation changes regarding mixed phase and glaciated icing conditions, the HAIC project will provide the necessary Acceptabl ...
Voir le projet

 40

 TERMINÉ 
The PoLaRBEAR (Production and Analysis Evolution For Lattice Related Barrel Elements Under Operations With Advanced Robustness) project focuses on reliable novel composite aircraft structures based on geodesic technology aiming at a significant higher Robustness and Technology Readiness Level (TRL).While the global structural behavior of composite geodesic structures is investigated and understood ...
Voir le projet

 13

 TERMINÉ 
The main objective of RESEARCH project is the definition of an electrical architecture for Flight Control System capable of controlling a flight control surface on an Aircraft with the help of electrically operated actuators, thus replacing the hydraulic actuators commonly used in current Aircraft designs.This architecture will be designed with the main objective of being electrical, as this is th ...
Voir le projet

 7

 TERMINÉ 

Aviation Noise Research Network and Coordination (X-NOISE EV)

Date du début: 1 déc. 2010, Date de fin: 30 nov. 2015,

The X-NOISE EV Coordination Action, through its network structure and comprehensive workplan involving experts groups, scientific workshops, international cooperation seminars and a common information system, addresses the noise challenges faced by Aviation. To this end, it will more specifically:- Evaluate EU-funded projects results and assess their contribution to the state-of-the-art.- Formulat ...
Voir le projet

 28

 TERMINÉ 

Smart Intelligent Aircraft Structures (SARISTU)

Date du début: 1 sept. 2011, Date de fin: 31 août 2015,

The project proposal concerns the challenges posed by the physical integration of smart intelligentstructural concepts. It addresses aircraft weight and operational cost reductions as well as animprovement in the flight profile specific aerodynamic performance.This concerns material concepts enabling a conformal, controlled distortion of aerodynamicallyimportant surfaces, material concepts enablin ...
Voir le projet

 68

 TERMINÉ 

OPtimisation for low Environmental Noise impact AIRcraft (OPENAIR)

Date du début: 1 avr. 2009, Date de fin: 30 sept. 2014,

Reducing noise from aircraft operations perceived by airport neighbouring communities is a major challenge facing the aircraft manufacturing industry, social society and the air transport business. By adopting a whole aircraft approach based on the latest developments in active / adaptive technologies, flow control techniques and advances in computational aero-acoustics applied to the major causes ...
Voir le projet

 51

 TERMINÉ 

All Condition Operations and Innovative Cockpit Infrastructure (ALICIA)

Date du début: 1 sept. 2009, Date de fin: 31 août 2014,

"ALICIA addresses the ACARE objective of increasing time efficiency within the future air transport system. The aim will be to develop a new and scalable cockpit application which can extend operations of aircraft in degraded conditions – “All Conditions Operations”. A key objective will be to deliver an extensible application that can be applied to many aircraft types. This will necessarily enta ...
Voir le projet

 42

 TERMINÉ 

Industrialisation of High-Order Methods – A Top-Down Approach (IDIHOM)

Date du début: 1 oct. 2010, Date de fin: 31 mars 2014,

"The proposed IDIHOM project is motivated by the increasing demand of the European aerospace industries to advance their CFD-aided design procedure and analysis by using accurate and fast numerical methods, so-called high-order methods. They will be assessed and improved in a top-down approach by utilising industrially relevant complex test cases, so-called application challenges in the general ar ...
Voir le projet

 21

 TERMINÉ 
"In the domain of civilian aeronautics, the increasing noise restrictions around airports are a challenging problem for aircraft and engine manufacturers. Despite significant progresses since the definition of ACARE objectives, jet noise remains the main source of noise for an aircraft at take-off and many works have been dedicated to its understanding and its reduction. First generation of noise ...
Voir le projet

 13

 TERMINÉ 

Advanced Lattice Structures for Composite Airframes (ALaSCA)

Date du début: 1 déc. 2010, Date de fin: 30 nov. 2013,

The ALaSCA project focuses on maximum weight and cost reduction significant in airframes by developing manufacture-optimized lattice fuselage structures fulfilling fundamental aspects of airworthiness.The idea behind the ALaSCA project is to perform a comprehensive investigation starting with the beneficial geodesic design well-proven in space technology and transferring it to composite aircraft f ...
Voir le projet

 13

 TERMINÉ 

4 Dimension Contracts - Guidance and Control (4DCO-GC)

Date du début: 1 nov. 2010, Date de fin: 31 oct. 2013,

"The 4DCo-GC project aims at exploring the concept of ""4D Contract guidance and control of the aircraft"" as a step change in air transport operations by providing a more radical and environmentally efficient solution for the management of the airspace. Scientific objectives of 4DCo-GC are to:- model 4D contract concepts (strategic, tactical and emergency levels)- develop algorithms (strategic, t ...
Voir le projet

 13

 TERMINÉ 
"The ARISTOTEL project challenge is ensuring aircraft safety and aims to reduce the aircraft and rotorcraft accidents caused by a particularly unfavourable category of phenomena: aircraft-pilot-couplings and rotorcraft-pilot-couplings (A/RPCs). Generally, A/RPCs are defined as “inadvertent, sustained aircraft oscillations which are a consequence of an abnormal joint enterprise between the aircraft ...
Voir le projet

 10

 TERMINÉ 
"DeSiReH focus on both, the numerical design tools and the experimental measurement techniques for cryogenic conditions, with the objective to improve the industrial design process for laminar wings in terms of product quality, efficiency, and development cost reduction. The work focuses on the design of high lift devices. DeSiReH addresses the following quantified objectives which will make a sig ...
Voir le projet

 21

 TERMINÉ 
The development of secure and re-usable re-entry vehicle requires the complete control of the heat distribution on its Thermal Protection System (TPS).During the most critical re-entry phase, the hypersonic flow along the vehicle initiates a laminar boundary layer inside of which most of the transfer phenomena take place (heat, momentum and mass transfer). If at one position of the vehicle, this b ...
Voir le projet

 5

 TERMINÉ 

VALidation and Improvement of Airframe Noise prediction Tools (VALIANT)

Date du début: 1 sept. 2009, Date de fin: 31 mai 2013,

"Broadband noise generated by the turbulent flow around the airframe is one of the most important components of aircraft generated acoustic nuisances. Its prediction and subsequent reduction is essential for achieving the ACARE 2020 objectives of noise level reductions. However, the complexity and diversity of broadband turbulent noise sources makes that prediction with present numerical tools ext ...
Voir le projet

 13

 TERMINÉ 

Smart High Lift Devices for Next Generation Wings (SADE)

Date du début: 1 mai 2008, Date de fin: 31 oct. 2012,

"All aerodynamic concepts for significant reduction of drag such as laminarisation require slim high-aspect-ratio wings. However, state-of-the-art high lift systems will suffer from the reduced construction space and do not cope with the required surface quality. Thus, SADE (Smart High Lift Devices for Next Generation Wings) develops suitable 'morphing' high lift devices: The seamless 'smart leadi ...
Voir le projet

 13

 TERMINÉ 

Simulation of Upset Recovery in Aviation (SUPRA)

Date du début: 1 sept. 2009, Date de fin: 31 août 2012,

"The aim of this research project is to investigate the usefulness of advanced flight simulator concepts for teaching pilots to detect and recover from flight upsets. The term “flight upset” indicates a situation when an aircraft in flight unintentionally exceeds the parameters normally experienced in line operations or training. Loss of control due to unsuccessful upset recovery is considered an ...
Voir le projet

 10

 TERMINÉ 

Technologies for Safe and Controlled Martian Entry (SACOMAR)

Date du début: 1 janv. 2011, Date de fin: 30 juin 2012,

"The main objective of the study is the experimental and numerical study of gas surface interaction phenomena in the high enthalpy flow field behind the bow shock in front of a model at Martian entry flow conditions. The improvement of physical modelling using experimental data and its implementation into the CFD codes is essential to understand and interpret the physical processes. At the end the ...
Voir le projet

 8

 TERMINÉ 

valiDation of Radical Engine Architecture systeMs (DREAM)

Date du début: 1 févr. 2008, Date de fin: 31 janv. 2012,

"Since the publication of the ACARE goals, the commercial and political pressure to reduce CO2 has increased considerably. DREAM is the response of the aero-engine community to this pressure. The first major DREAM objective is to design, integrate and validate new engine concepts based on open rotor contra-rotating architectures to reduce fuel consumption and CO2 emissions 7% beyond the ACARE 2020 ...
Voir le projet

 46