Rechercher des projets européens

5 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Nanomaterial FAte and Speciation in the Environment (NanoFASE)

Date du début: 1 sept. 2015, Date de fin: 31 août 2019,

Concept: NanoFASE will deliver an integrated Exposure Assessment Framework, including methods, parameter values, model and guidance that will allow Industry to assess the full diversity of industrial nano-enabled products to a standard acceptable in regulatory registrations. Methods to assess how use phases, waste streams and environmental compartments (air, soil, water biota) act as “reactors” in ...
Voir le projet

 39

 TERMINÉ 

Innovative Intelligent Rail (IN2RAIL)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

IN2RAIL is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by delivering important building blocks that unlock the innovation potential that exists in SHIFT2RAIL: innovative technologies will be explored and resulting concepts embedded in a systems framework where infrastructure, information management, maintenance techniques, energy, and engineer ...
Voir le projet

 56

 TERMINÉ 
The SMARTBLIND project aims at developing an Energy Efficient Smart Window including a hybrid film constituted of an electrochromic LC film and a photovoltaic film both printed on the same long-lasting flexible substrate. The realization process will be implemented thanks to electrochromic and photovoltaic inks especially formulated to be ink-jet printed.A reduction of the windows U-value down to ...
Voir le projet

 13

 TERMINÉ 

Buildsmart – energy efficient solutions ready for the market (BUILDSMART)

Date du début: 1 déc. 2011, Date de fin: 31 août 2015,

The Objective of the Builtsmart-project is to demonstrate and mainstream innovative and cost effective techniques and methods for constructing very low energy buildings in various climates.Residential and non residential new buildings in Sweden, Ireland and Spain will participate in the project. The total gross floor space of the buildings will be 81 300 m2.New forms of incentives will be develope ...
Voir le projet

 13

 TERMINÉ 
The refurbishing to an energy efficient standard leads to tight buildings (whole envelope: windows, walls, etc.) and affects the indoor climate. In case of refurbishing the inhabitants or users are not adapted to this new situation. Therefore the air exchange rates could be lower than required if no mechanical ventilation is installed or the system performance is not optimised. Then, in trying to ...
Voir le projet

 15