Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Internet of Food and Farm 2020 (IoF2020)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

...l ensure a high market visibility and an increased learning curve.Thus IoF2020 will pave the way for data-driven farming, autonomous operations, virtual food chains and personalized nutrition for European citizens.
Voir le projet

 72

 TERMINÉ 

Techniques and Technologies for Effective Wood Procurement (TECH4EFFECT)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2020,

...n 5 participating countries. It is the project’s hope that implementation will result in such obvious benefits amongst the industrial partners that its application will become widespread within the European forest sector.
Voir le projet

 19

 TERMINÉ 

Waste Heat Recovery in Industrial Drying Processes (DRYficiency)

Date du début: 1 sept. 2016, Date de fin: 31 août 2020,

The overall objective of the DRYficiency project is to lead energy-intensive sectors of the European manufacturing industry to high energy efficiency and a reduction of fossil carbon emissions by means of waste heat recovery to foster competitiveness, improve security of energy supply and guarantee sustainable production in Europe. The project addresses three sectors, namely brick, pet care/feed a ...
Voir le projet

 12

 TERMINÉ 
... and evaluating complex configurations in a cyber-physical systems manner is available. The lack of system validation approaches for Smart Grids is especially addressed by ERIGrid. By providing a Pan-European research infrastructure ERIGrid supports the technology development as well as the roll out of Smart Grid solutions and concepts in Europe. It tackles a holistic, cyber-physical systems based ...
Voir le projet

 19

 TERMINÉ 

health-i-care

Date du début: 31 mars 2016, Date de fin: 30 mars 2020,

Description (EN): Themes Health-i-care: innovations for safer healthcareAll health-i-care project activities are devoted to the highly actual thematic focus of prevention and control of hospital infections and antibiotic resistance and the associated risks for patients and public health.Health-i-care focuses on developing innovative products and technologies that protect the populat ...
Voir le projet

 40

 TERMINÉ 
A significant challenge to ensuring sustainable production and use of nanotechnologies is to understand safety and health risks of the technology and its end-products, and to implement practical strategies to manage these risks. Knowledge is growing rapidly, but effective use of this knowledge for risk management is lagging behind. We therefore need to bridge the gap between knowledge on hazard an ...
Voir le projet

 17

 TERMINÉ 
The project 'STI International Cooperation Network for EaP Countries Plus (EaP PLUS)' aims to stimulate cooperation between researchers from the EaP countries and EU MS and enhance the active participation of the Eastern Partnership countries in Horizon 2020 Framework Programme.Building on the results of the predecessor FP7 project 'IncoNet EaP', the project will eliminate remaining obstacles to E ...
Voir le projet

 18

 TERMINÉ 
...ing a transformation. Modern experimental tools study the molecules, reactions, and organisation of life in unprecedented detail. The precipitous drop in costs for high-throughput biology has enabled European research laboratories to produce an ever-increasing amount of data. Life scientists are rapidly generating the most complex and heterogeneous datasets that science can currently imagine, with ...
Voir le projet

 47

 TERMINÉ 
Trillium-II steps forward with an outstanding consortium to further advance global Electronic Health Record (EHR) interoperability. Activities surrounding the International Patient Summary (IPS) standards can nurture digital health innovation, lower trade barriers, and advance patient safety & trust, bridging the gap between strategic intent and capability for action by Standards Development Organ ...
Voir le projet

 21

 TERMINÉ 
...reats (insect pests, pathogens, weeds) for a range of both natural ecosystems and farming systems (field crops, protected crops, forestry, orchards and amenity plants).The overall goal is to ensure a European food security system and the protection of biodiversity and of ecosystems services while developing integrated mechanisms of response measures (practical solutions) to predict, to prevent and ...
Voir le projet

 24

 TERMINÉ 
...l. space data), free software & data processing tools, to develop new applications.FabSpace 2.0 will provide a new free-access service and place dedicated to collaborative data-driven innovation in 6 European universities (13 at the end of the project). Through online support, entrepreneurship & innovation leadership trainings for students and researchers, the human capital among FabSpace users wi ...
Voir le projet

 16

 TERMINÉ 

Funding Resources for innovation in Energy Enterprise Development (FREED)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

Description (EN): FREED will develop a new service, by the means of which SME’s in the region can access innovation in energy technologies otherwise not be available within the NPA region. FREED will also facilitate the transfer of technology innovations to SME’s across the area, so that the outputs of the project will widely benefit the region. It will achieve this because it provi ...
Voir le projet

 7

 TERMINÉ 
The project SmartNet aims at providing architectures for optimized interaction between TSOs and DSOs in managing the exchange of information for monitoring and for the acquisition of ancillary services (reserve and balancing, voltage regulation, congestion management) both at national level and in a cross-border context. Local needs for ancillary services in distribution systems are supposed to co ...
Voir le projet

 22

 TERMINÉ 
...ny, manufacturers and research organisations, propose 5 demonstration projects to remove, in 4 years, several barriers which prevent large-scale penetration of renewable electricity production in the European transmission network. The full scale demonstrations led by industry aim at proving the benefits of novel technologies coupled with innovative system integration approaches:- A scaled down mod ...
Voir le projet

 39

 TERMINÉ 

Coordination of Automated Road Transport Deployment for Europe (CARTRE)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2018,

...ystems and services are compatible on a EU level and are deployed in a coherent way across Europe. CARTRE includes a joint stakeholder’s forum in order to coordinate and harmonise ART approaches at European and international level. CARTRE creates a solid knowledge base of all European activities, supports current activities and structures research outcomes by enablers and thematic areas.CARTRE inv ...
Voir le projet

 36

 TERMINÉ 
INNO-4-AGRIFOOD will deliver a new generation of innovation support services that will assist European SMEs across the vast Agri-food ecosystem to create value from on-line collaboration for innovation, access a broader range of potential innovation partners beyond their national and sectoral borders and timely mobilise them to seize opportunities to launch concrete innovation projects. INNO-4-AGR ...
Voir le projet

 7

 TERMINÉ 

Open Access Infrastructure for Research in Europe 2020 (OpenAIRE2020)

Date du début: 1 janv. 2015, Date de fin: 30 juin 2018,

OpenAIRE2020 represents a pivotal phase in the long-term effort to implement and strengthen the impact of the Open Access (OA) policies of the European Commission (EC), building on the achievements of the OpenAIRE projects. OpenAIRE2020 will expand and leverage its focus from (1) the agents and resources of scholarly communication to workflows and processes, (2) from publications to data, software ...
Voir le projet

 50

 TERMINÉ 
...ns of thermal energy storage and/or hybridization, e.g. with biomass. However, significant research efforts are needed to achieve this goal. This Integrated Research Programme (IRP) engages all major European research institutes, with relevant and recognized activities on STE and related technologies, in an integrated research structure to successfully accomplish the following general objectives: ...
Voir le projet

 42

 TERMINÉ 
...enewable energy systems, including photovoltaics. With lower cost of solar electricity, PV could significantly contribute to the achievements of the 20-20-20 objectives.The Joint Program on PV of the European Energy Research Alliance (EERA-PV) aims to increase the effectiveness and efficiency of PV R&D through alignment and joint programming of R&D of its member institutes, and to contribute to th ...
Voir le projet

 37

 TERMINÉ 
The ELECTRA Integrated Research Programme on Smart Grids (ELECTRA) brings together the partners of the EERA Joint Programme on Smart Grids (JP SG) to reinforce and accelerate Europe’s medium to long term research cooperation in this area and to drive a closer integration of the research programmes of the participating organisations and of the related national programmes. ELECTRA’s joint research a ...
Voir le projet

 23

 TERMINÉ 

Danube Region INCO-NET (DANUBE-INCO.NET)

Date du début: 1 janv. 2014, Date de fin: 30 juin 2017,

Danube-INCO.NET understands itself as strategic high-level coordination and support action. Its background is the macro-regional approach of the European Union, in particular the EU Strategy for the Danube Region (EUSDR) and its Priority Areas for Knowledge Society (PA7) and for Competitiveness (PA8). Based on strong institutionaliszed links with the PA Coordinators and the PA Steering Groups, a c ...
Voir le projet

 22

 TERMINÉ 
"With this proposal, a qualified and assorted representative group of the European Materials community, intend to propose an activity for further boosting and reinforcing a concept launched by Alliance for Materials (A4M): the creation of a strong, sustainable, inclusive network where any European Materials players (from Industry, Research, University) could feel comfortable and can gain real val ...
Voir le projet

 20

 TERMINÉ 

MObility for Vocational and Educational Training 2.0

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

...io Emilia, 9 technical and professional high schools of the province, the Emilia-Romagna Region, the Chamber of Commerce, the main local trade associations, in addition to receiving partners and many European SMEs interested in a transnational dimension of business and labor market. The project develops mobility experiences for 90 students and 36 newly graduated/qualified.The level of territorial ...
Voir le projet

 30

 TERMINÉ 
Despite improved understanding of the links between ecosystem health, provision of ecosystem services and human well-being, further conceptual and empirical work is needed to make the ideas of ecosystem services (ESS) and natural capital (NC) operational. OpenNESS will therefore develop innovative and practical ways of applying them in land, water and urban management: it will identify how, where ...
Voir le projet

 39

 TERMINÉ 
The INNOVER-EAST project targets five countries of the Eastern Partnership (in short, EPCs: Armenia, Azerbaijan, Belarus, Georgia and Ukraine) to overcome the bottlenecks of innovation and intensify the level of cooperation between research and business in the target countries. The project aims, on the one hand, to develop new skills and competences in innovation services at relevant organisations ...
Voir le projet

 15

 TERMINÉ 

Strengthening European Transport Research and Innovation Strategies (SETRIS)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2017,

...ed approach to research and innovation strategies for all transport modes in Europe. To fulfil the aim of SETRIS, the following objectives are envisaged:1. To identify synergies between the transport European Technology Platforms (ETPs) strategic and research and innovation agendas (SRIAs) and between these and relevant national platforms;2. To review and update the existing SRIAs for each of the ...
Voir le projet

 18

 TERMINÉ 

The European network of Women web Entrepreneurs Hubs (WeHubs)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2016,

...epreneurship sector can contribute significantly to the competiveness and economic growth of countries and regions. However, Europe is clearly lagging behind given that even though there are lots of European web start-ups, most of them rarely grow up to become global leaders. In this context, the position of women seems particularly weak given that only a very small percentage of them are web ent ...
Voir le projet

 9

 TERMINÉ 

End-user driven DEmo for cbrNe (EDEN)

Date du début: 1 sept. 2013, Date de fin: 31 déc. 2016,

... allow capabilities to be shared among multi-national CBRNE stakeholders, which is paramount in cross-border incident management, and through time allow for a build up of common capability across European boundaries. EDEN will be validated by three themed end-user demonstrations (Food Industry, Multi Chemical, Radiological) covering multiple hazards (CBRNE), phases of the security cycle, response ...
Voir le projet

 47

 TERMINÉ 

Support action for Vehicle and Road Automation network (VRA)

Date du début: 1 juil. 2013, Date de fin: 31 déc. 2016,

...ree on solutions enabling good market conditions for a seamless and fast deployment.Therefore this support action for Vehicle and Road Automation is an initiative to share expertise and cooperate, at European and International level. It aims to:• Maintain an active European network of Vehicle and Road Automation experts and stakeholders,• Contribute to EU-US-Japan international collaboration on Ve ...
Voir le projet

 14

 TERMINÉ 
...ners, the improvement and the widening of the foreign partnership, in terms of territories and competencies; the opportunity to finalize exchange and cooperation projects within different other European Programmes (e.g. Progress, EaSI, others); the opportunity to become (as a Consortium) an important partner in the management of mobility and in the adoption of EQAVET and ECVET systems.
Voir le projet

 27

 TERMINÉ 
The majority of Europeans with a disability do not yet have equal opportunities to participate in sports or HEPA. The EWOS ABILITY LINK*KIT Project will tackle this need and create a lasting trans-national and trans-sectoral European partnership that holds the expertise to link national disability sport structures and local stakeholders, in order to raise awareness and sustainably increase day-to- ...
Voir le projet

 9

 TERMINÉ 
Even though composite materials are more and more used in modern airframes, many significant improvements are still achievable. Firstly, the substitution of the assembly of many small composite parts by a single one-shot large part provides additional weight reduction. Secondly, the final assembly line process must be adapted to composite properties (lack of ductility, stiffness). Thirdly, if the ...
Voir le projet

 60

 TERMINÉ 
CONCORD advances European Future Internet research and innovation by supporting the successful implementation of the European Commission's Future Internet Public Private Partnership (FI-PPP) Programme. As a Programme Facilitation and Support Action, CONCORD coordinates and facilitates the alignment of FI-PPP activities to ensure the relevance, rigor and robustness of the emerging Future Internet ( ...
Voir le projet

 10

 TERMINÉ 
Energy supply and usage and the stimulation of innovation activities are some of the most important challenges for the EU and for the Eastern European countries within the European Neighbourhood Policy (ENP). Increased resource efficiency and innovation in renewable and sustainable energy offers the best potential to solve the urgent, interrelated societal challenges of insecurity over energy supp ...
Voir le projet

 12

 TERMINÉ 

Federation for FIRE (Fed4FIRE)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2016,

A federation of experimentation facilities will significantly accelerate Future Internet research. Fed4FIRE will deliver open and easily accessible facilities to the FIRE experimentation communities, which focus on fixed and wireless infrastructures, services and applications, and combinations thereof. The project will develop a demand-driven common federation framework, based on an open architect ...
Voir le projet

 43

 TERMINÉ 

Transitioning towards Urban Resilience and Sustainability (TURAS)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2016,

...e “TURaS” project aims to bring together urban communities, researchers, local authorities and SMEs to research, develop, demonstrate and disseminate transition strategies and scenarios to enable European cities and their rural interfaces to build vitally-needed resilience in the face of significant sustainability challenges. To ensure maximum impact, the TURaS project has developed an innovative ...
Voir le projet

 34

 TERMINÉ 

Cities demonstrating cybernetic mobility (CITYMOBIL2)

Date du début: 1 sept. 2012, Date de fin: 31 août 2016,

European cities face four main mobility problems: congestion, land use , safety and environment. One of the main causes of such problems is the car-ownership rate. The centres of large cities address this issue combining efficient mass transits with car restriction policies but peripheral areas and smaller cities remain dominated by private cars.CityMobil has demonstrated how automating road vehi ...
Voir le projet

 49

 TERMINÉ 

Smart Thermal conductive Al MMCs by casting (THERMACO)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

"The ever–growing demand for heat evacuation applications in fields such as power microelectronics, e-mobility or (renewable) energy generation is motivating today's suppliers to come up with better and better heat conductive materials. Most of these products who were recently introduced to the market are carbon based materials aimed for extremely high heat conductivity (up to 2,000 W/mK). While d ...
Voir le projet

 11

 TERMINÉ 

Critical System Engineering Acceleration (CRYSTAL)

Date du début: 1 mai 2013, Date de fin: 31 juil. 2016,

... methodological bricks of the factories for safety-critical embedded systems engineering in the areas of transportation (aerospace, automotive, and rail) and healthcare providing a critical mass of European technology providers.CRYSTAL perfectly fits to other ARTEMIS projects, sharing the concept of a reference technology platform (RTP) as a consistent set of integration principles and seamless te ...
Voir le projet

 70

 TERMINÉ 
In order to promote the widespread adoption of electric vehicles (EV) in Europe and to reduce the different regulatory, commercial or political barriers, it is imperative that EVs, Charging Points (CPs) and all kind of systems needed to allow the charging and other additional services are compatible to some extent.EVs emerge as a great challenge for the grid infrastructure. During the last years m ...
Voir le projet

 11