Rechercher des projets européens

8 projets européens trouvés

Recherche sur 125080 projets européens

 EN COURS 

SEMMERING RAILWAY BASE TUNNEL

Date de fin: 30 déc. 2024,

Aim: Projects part of proposed Core Network and Baltic Adriatic Core Network corridorConstruction of two tube base tunnel
Voir le projet

 1

 TERMINÉ 
...and Belgium on the other. Between the Odra River and German, Dutch and Flemish ports, it also includes inland waterways, such as the "Mittelland-Kanal". The most important project is "Rail Baltic", a European standard gauge railway between Tallinn, Riga, Kaunas and North-Eastern Poland. ...
Voir le projet

 1

 TERMINÉ 

VIENNA MAIN RAILWAY STATION

Date de fin: 30 déc. 2015,

Aim: Projects part of PP17, PP 23 (core Network corridor Strasbourg – Danube, Baltic Adriatic, Hamburg Levkosia) Construction of new railway station as a key node between TEN-T corridors
Voir le projet

 1

 TERMINÉ 
The Scandinavian-Mediterranean Corridor is a crucial north-south axis for the European economy. Crossing the Baltic Sea from Finland to Sweden and passing through Germany, the Alps and Italy, it links the major urban centres and ports of Scandinavia and Northern Germany to continue to the industrialised high production centres of Southern Germany, Austria and Northern Italy further to the Italian ...
Voir le projet

 1

 TERMINÉ 

CONSTRUCTION OF A NEW BRIDGE OVER THE DANUBE RIVER AT VIDIN – CALAFAT

Date du début: 31 déc. 2006, Date de fin: 30 déc. 2012,

Aim:Part of the TEN-T Priority Project 22 (Pan-European transport corridor K 4).The Project includes design and construction of a combined (road and rail) bridge with 4 road lanes and a single-track railway line plus bicycle lane.
Voir le projet

 1

 TERMINÉ 

KORALM RAILWAY LINE

Date du début: 31 déc. 2006,

Aim: Projects part of proposed Core Network and Baltic Adriatic Core Network corridorConstruction of new high speed railway line between Graz and Klagenfurt
Voir le projet

 1

 TERMINÉ 
Priority Project 22 (rail): from Nurnberg / Dresden to Constanta and Athens via Prague, Vienna, Budapest and Arad through the whole region (according to the Decision No 884/2004/EC of the European Parliament and of the Council amending Decision No trans-European transport network).The Priority Project 22 on the Romanian territory has a length of 80 km for the North Branch (to Constanta) and is spl ...
Voir le projet

 1

 TERMINÉ 
Aim: Projects part of PP17 (core Network corridor Strassbourg– Danube)Construction of a new high speed line between Vienna, Main Railway station and St. Poelten including Lainzertunnel and Wienerwaldtunnel
Voir le projet

 1