InteGrid’s vision is to bridge the gap between citizens, technology and the other players of the energy system. The project will demonstrate how DSOs may enable all stakeholders to actively participate in the energy market and distribution grid management and develop and implement new business models, making use of new data management and consumer involvement approaches. Moreover, the consortium w ...
Voir le projet

 15

 TERMINÉ 
Renewable energy sources are key enablers to decrease greenhouse gas emissions and to cope with the anthropogenic global warming. The intermittent behaviour of them and their limited storage capabilities present new challenges to power system operators in maintaining power quality and reliability. However, the increased availability of advanced automation and communication technologies has also pr ...
Voir le projet

 19

 TERMINÉ 

Simulation Supported Real Time Energy Management in Building Blocks (Sim4Blocks)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2020,

The growing share of variable renewable energy necessitates flexibility in the electricity system, which flexible energy generation, demand side participation and energy storage systems can provide. SIMBLOCK will develop innovative demand response (DR) services for smaller residential and commercial customers, implement and test these services in three pilot sites and transfer successful DR models ...
Voir le projet

 17

 TERMINÉ 

ACTRIS PPP - Aerosols, Clouds and Trace gases Preparatory Phase Project (ACTRIS PPP)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

The Research Infrastructure (RI) ACTRIS – Aerosols, Clouds and Trace Gases - is the pan-European RI that consolidates activities amongst European partners for observations of aerosols, clouds, and trace gases and for understanding of the related atmospheric processes, to provide RI services to wide user groups. ACTRIS is composed of 8 connected elements: distributed National Facilities (observatio ...
Voir le projet

 28

 TERMINÉ 
...cing existing natural solutions to challenges, while others are exploring more novel solutions, for example, based on how non-human organisms and communities cope with environmental extremes. NBS are energy and resource-efficient, and resilient to change, but to be successful they must be adapted to local conditions.The main objective of the present project is the development of a multi-stakeholde ...
Voir le projet

 18

 TERMINÉ 

THERMOS (Thermal Energy Resource Modelling and Optimisation System) (THERMOS)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

THERMOS (Thermal Energy Resource Modelling and Optimisation System) will develop the methods, data, and tools to enable public authorities and other stakeholders to undertake more sophisticated thermal energy system planning far more rapidly and cheaply than they can today. This will amplify and accelerate the development of new low carbon heating and cooling systems across Europe, and enable fast ...
Voir le projet

 16

 TERMINÉ 
The COSMOS proposal aims to reduce Europe’s dependence on imported coconut and palm kernel oils and fatty acids and castor oil as sources for medium-chain fatty acids (MCFA, C10–C14) and medium-chain polymer building blocks. These are needed by the oleochemical industry for the production of plastics, surfactants, detergents, lubricants, plasticisers and other products. In COSMOS, camelina and cra ...
Voir le projet

 21

 TERMINÉ 

Floating Tidal Energy Commercialisation project (FloTEC) (FloTEC)

Date du début: 1 janv. 2016, Date de fin: 30 juin 2019,

The FloTEC project will demonstrate the potential for floating tidal stream turbines to provide low-cost, high-value energy to the European grid mix. The FloTEC project has 5 core objectives:1. Demonstrate a full-scale prototype floating tidal energy generation system for optimised energy extraction in locally varying tidal resources;2. Reduce the Levelised Cost of Energy of floating tidal energy ...
Voir le projet

 9

 TERMINÉ 

European Circular Energy-Frontier Collider Study (EuroCirCol)

Date du début: 1 juin 2015, Date de fin: 31 mai 2019,

...ed European Strategy for Particle Physics, adopted by the CERN Council in May 2013.The EuroCirCol conceptual design study is a direct response to this recommendation, initiating a study for a 100 TeV energy-frontier circular collider through a collaboration of institutes and universities worldwide.A new research infrastructure of such scale depends on the feasibility of key technologies pushed bey ...
Voir le projet

 17

 TERMINÉ 
The stabilization of molten corium is recognised as essential if a safe and stable state is to be reached following a severe accident. Among the possible options, In-Vessel Melt Retention (IVMR) appears as an attractive solution that would minimize the risks of containment failure (less Hydrogen produced, no corium-concrete interaction), if it can be proved to be feasible.The strategy is already a ...
Voir le projet

 25

 TERMINÉ 
5TOI_4EWAS project will focus on Targeted Open Innovation in energy, water and agriculture societal challenges through a balanced innovation-friendly ecosystem in the Southern Mediterranean Neighborhood (SMN) based on quintuple helix and NEXUS approach. The project will enhance and support regional smart specialization and development by increasing research capacity, effective mobility of young in ...
Voir le projet

 25

 TERMINÉ 

Advanced European Infrastructures for Detectors at Accelerators (AIDA-2020)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2019,

Particle physics is at the forefront of the ERA, attracting a global community of more than 10,000 scientists. With the upgrade of the LHC and the preparation of new experiments, the community will have to overcome unprecedented challenges in order to answer fundamental questions concerning the Higgs boson, neutrinos, and physics beyond the Standard Model. Major developments in detector technology ...
Voir le projet

 38

 TERMINÉ 

New Cost Efficient Business Models for Flexible Smart Grids (NOBEL GRID)

Date du début: 1 janv. 2015, Date de fin: 30 juin 2018,

NOBEL GRID will develop, deploy and evaluate advanced tools and ICT services for energy DSOs cooperatives and medium-size retailers, enabling active consumers involvement –i.e. new demand response schemas – and flexibility of the market – i.e. new business models for aggregators and ESCOs.Through the dual-use of telecommunication networks, and validating the integration of renewable generation pre ...
Voir le projet

 24

 TERMINÉ 
The aim of the proposed action is to foster the development of the bioenergy sector in the Danube Region, and of the Bioeconomy at large, through the strengthening of local supply chains that will be supported through specific analytics (economics, sustainability and land use models), and targeted capacity building to foster the generation of innovative solutions in a participatory, cross-sector p ...
Voir le projet

 6

 TERMINÉ 

EUDAT2020

Date du début: 1 mars 2015, Date de fin: 28 févr. 2018,

EUDAT2020 brings together a unique consortium of e-infrastructure providers, research infrastructure operators, and researchers from a wide range of scientific disciplines under several of the ESFRI themes, working together to address the new data challenge. In most research communities, there is a growing awareness that the “rising tide of data” will require new approaches to data management and ...
Voir le projet

 36

 TERMINÉ 
Europe has invoked the SET-Plan to design and implement an energy technology policy for Europe to accelerate the development and deployment of cost-effective renewable energy systems, including photovoltaics. With lower cost of solar electricity, PV could significantly contribute to the achievements of the 20-20-20 objectives.The Joint Program on PV of the European Energy Research Alliance (EERA-P ...
Voir le projet

 37

 TERMINÉ 
...tion and engagement. Together, the JP SG and ELECTRA will establish significant coherence across national research efforts critical to the stable operation of the EU power system of 2020+. The EU energy strategy sets ambitious goals for the energy systems of the future that foresees a substantial increase in the share of renewable electricity production. The whole-sale deployment of RES connected ...
Voir le projet

 23

 TERMINÉ 
...e project addresses the heart of the Long Term R&D Programme of the New Turbines and Components strand of the European Wind Initiative (EWI) established under SET-Plan, the Common European Policy for Energy Technologies.
Voir le projet

 29

 TERMINÉ 
"With this proposal, a qualified and assorted representative group of the European Materials community, intend to propose an activity for further boosting and reinforcing a concept launched by Alliance for Materials (A4M): the creation of a strong, sustainable, inclusive network where any European Materials players (from Industry, Research, University) could feel comfortable and can gain real val ...
Voir le projet

 20

 TERMINÉ 
The overarching goal of AMAZE is to rapidly produce large defect-free additively-manufactured (AM) metallic components up to 2 metres in size, ideally with close to zero waste, for use in the following high-tech sectors namely: aeronautics, space, automotive, nuclear fusion and tooling.Four pilot-scale industrial AM factories will be established and enhanced, thereby giving EU manufacturers and en ...
Voir le projet

 29

 TERMINÉ 

LEACHE – Europa más cerca

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

The Department for Education of the Government of Navarra is responsible for establishing the general conditions and developing general aspects of education in this Spanish autonomous region. In this context, a new structure has been created in the Vocational Training Service in order to provide assistance for the internationalization of VET institutions. These measures try to reach the following ...
Voir le projet

 91

 TERMINÉ 

EeB Cluster Activities Coordination Action (EeB-CA2)

Date du début: 1 févr. 2015, Date de fin: 31 janv. 2017,

EeB-CA2 initiative is to provide the right set of instruments supporting technology-clustering and geo-clustering upon the whole set of EeB PPP EC-funded projects related to energy efficiency in the built environment, with the following primary ambition: to enhance and rationalise coordinated and broader dissemination, technology transfer and future exploitation activities of clustered projects, s ...
Voir le projet

 4

 TERMINÉ 

Western Balkans Excellence for a Biobased Economy (WeBE)

Date du début: 31 déc. 2014, Date de fin: 30 déc. 2016,

... and exploit knowledge on biomass value chains in countries defined as modest or catching up innovators, thus contributing to meeting the objectives set in the EUSDR Action Plan for Sustainable Energy, particularly Action 8 (To extend the use of biomass) and Action 11 (To explore the possibility to have increased energy production originating from local renewable energy sources to increase the ene ...
Voir le projet

 4

 TERMINÉ 
...ort the development of a “resource efficient” Bioeconomy for Europe. This includes industrial processes (i.e. bio-based industries) for manufacturing biomass-derived goods/products as well as energy conversion, both for large scale and small scale units.The research work will be organized in three individual but strongly interrelated Themes:Theme 1 will focus on methodological approaches, data col ...
Voir le projet

 34

 TERMINÉ 
The complexity of the balance of plant of a fuel cell-fuel processor unit challenges the design/development/demonstration of compact and user friendly fuel cell power systems for portable applications. An Internal Reforming Methanol Fuel Cell (IRMFC) stack poses a highly potential technological challenge for High Temperature Polymer Electrolyte Membrane Fuel Cells (HT-PEMFCs) in portable applicati ...
Voir le projet

 10

 TERMINÉ 
...oncentrating solar power (CSP). Joint activities, namely joint calls, are defined for key topics and priorities in accordance with the Solar Europe Industrial Initiative (SEII) based on the Strategic Energy Technology (SET) Plan and its related Implementation Plans for PV and CSP.The network's activities will primarily involve the launching of joint calls for RTD proposals by national and regional ...
Voir le projet

 20

 TERMINÉ 
The activities of the DeMStack project will be on the stack optimization and construction based on the high temperature MEA technology of ADVENT S.A. and its long term stability testing in combination with a fuel processor. DeMStack aims to enhance the lifetime and reduce the cost of the overall HT PEMFC technology by integrating promising, already developed materials for electrodes and membranes ...
Voir le projet

 7

 TERMINÉ 

Optimal Design Tools for Ocean Energy Arrays (DTOCEAN)

Date du début: 28 oct. 2013, Date de fin: 27 oct. 2016,

The DTOcean project is aimed at accelerating the industrial development of ocean energy power generation knowledge, and providing design tools for deploying the first generation of wave and tidal energy converter arrays.The areas of hydrodynamic array layout, electrical infrastructure, operations, maintenance & control, moorings & foundations, and installation & logistics bring critical challenges ...
Voir le projet

 19

 TERMINÉ 
"FP4BATIW is a coordination and support action addressed to foster partnerships and networking aiming to implement the best available water treatment technologies in the MPC region by promoting the interaction between highly qualified members, both from EU and MPC, of the knowledge value chain on water treatment and corresponding stake holders community (national water agencies, municipalities, in ...
Voir le projet

 13

 TERMINÉ 
Energy supply and usage and the stimulation of innovation activities are some of the most important challenges for the EU and for the Eastern European countries within the European Neighbourhood Policy (ENP). Increased resource efficiency and innovation in renewable and sustainable energy offers the best potential to solve the urgent, interrelated societal challenges of insecurity over energy supp ...
Voir le projet

 12

 TERMINÉ 

Demonstration of more reliable innovative designs on a 2MW Wind turbine (WINDTRUST)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

... of the WINDTRUST project is to demonstrate the technical and economic feasibility of innovative and more reliable solutions for multi MW wind turbines in order to improve the competitiveness of wind energy technologies. The selected components of the wind turbine are the rotor (specifically the blade), power electronics (specifically the converter) and Control and communication system (specifical ...
Voir le projet

 9

 TERMINÉ 
...urcia, Spain, where this project is based, there are more than 70 industrial parks in a region of 11 300 km2. Across Europe, the majority of these industrial areas are characterised by low-efficiency energy performance and by high CO2 emissions. Improving the sustainability of such areas is already a focus of environmental concern in the EU, with increasing recognition that an inability to adapt ...
Voir le projet

 6

 TERMINÉ 
The limited supplies of traditional fossil fuels and environmental damage caused by their CO2 emissions have caused a growing interest in the exploitation of renewable energy sources. By far the most promising replacement fuel for road transport is hydrogen because of its abundance, efficiency, low footprint for carbon and the absence of other harmful emissions. In 2015 it is expected that the num ...
Voir le projet

 7

 TERMINÉ 

Bio Base NWE

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2015,

... This model can not be sustained in the long run. In the bio-based economy. biomass replaces non-renewable resources for the production of materials (e.g. plastics). products (e.g. paints). fuels and energy The transition to the bio-based economy combines necessity with tremendous opportunity for sustainable growth and competitiveness in new economic sectors based on the development of innovative ...
Voir le projet

 8

 TERMINÉ 

Small scale thermal solar district units for Mediterranean communities (STS-Med)

Date du début: 16 nov. 2012, Date de fin: 30 déc. 2015,

The project in brief In the Mediterranean area, a large share of energy is consumed by households and in buildings. In addition to the dependence on fossil fuel, oil and natural gas, the primary energy demand is growing at a regular pace. Increasing the share of solar energy sources in the overall energy mix is a crucial goal for the Mediterranean area, as the exploitation of a sustainable renewab ...
Voir le projet

 14

 TERMINÉ 

Concentrated Solar Power in Particles (CSP2)

Date du début: 1 déc. 2011, Date de fin: 30 nov. 2015,

...ed at the top of a central receiver CSP system. This new HTF behaves like a liquid although it permits to extend working temperatures at temperature higher than 550°C; moreover, it may be used as an energy storage medium because of its good thermal capacity. It is composed of any particulate mineral standing high temperature, thus deeply reducing the environmental impact and addressing the safety ...
Voir le projet

 8

 TERMINÉ 

FP7 High Luminosity Large Hadron Collider Design Study (HILUMI LHC)

Date du début: 1 nov. 2011, Date de fin: 31 oct. 2015,

The Large Hadron Collider (LHC) is the largest scientific instrument ever built. It has been exploring the new energy frontier since 2009, gathering a global user community of 7,000 scientists. It will remain the most powerful accelerator in the world for at least two decades, and its full exploitation is the highest priority in the European Strategy for Particle Physics, adopted by the CERN Counc ...
Voir le projet

 16

 TERMINÉ 

Optimization of Perennial Grasses for Biomass Production (OPTIMA)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2015,

...sticide and increase biomass on the first year establishment, cultivation under salinity conditions and/or water deficit, reducing losses during harvest); to evaluate the industrial production of bioenergy and added value bio-products; to assess the environmental impact through an integrated assessment of sustainability criteria, to disseminate the achieved findings at different level (local, reg ...
Voir le projet

 21

 TERMINÉ 

The European Research Infrastructure for Thermochemical Biomass Conversion (BRISK)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2015,

Enhancing biomass utilization without risking its sustainability is a European energy priority, and can be linked to targets for curbing greenhouse gas emissions by 20% by 2020 and 50% by 2050: enhanced energy security and integration with other industrial sectors, such as agriculture, also play a role. Improved use of biofuels and products in advanced biomass conversion units and biorefineries ar ...
Voir le projet

 27

 TERMINÉ 

Energetic Recovery of Waste (VEDER)

Date du début: 19 févr. 2013, Date de fin: 18 août 2015,

Development of a sustainable energy sector in perspective of a sustainable use of energy resources, through the implementation of a system for electricity and heat production from biomass, municipal, agricultural and industrial waste. Expect ...
Voir le projet

 8