Rechercher des projets européens

25 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

CAST (CArbon-14 Source Term) (CAST)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2018,

The CAST project (CArbon-14 Source Term) aims to develop understanding of the generation and release of 14C from radioactive waste materials under conditions relevant to waste packaging and disposal to underground geological disposal facilities. The project will focus on releases from irradiated metals (steels, Zircaloys) and from ion-exchange materials as dissolved and gaseous species. A study t ...
Voir le projet

 37

 TERMINÉ 

solving CHAllenges in Nuclear DAta (CHANDA)

Date du début: 1 déc. 2013, Date de fin: 30 nov. 2017,

"The CHANDA project main objective is to address the challenges in the field of nuclear data for nuclear applications and its acronym stands for solving CHAllenges in Nuclear DAtaThe project will prepare a proposal for an organization that will coordinate the nuclear data research program, and the infrastructures and capabilities of the EU Member States in a stable structure, well integrated with ...
Voir le projet

 35

 TERMINÉ 

MyrrhA Research Infrastructure Support Action (MARISA)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

"The MYRRHA project aims to develop and to construct a world-class and first-of-a-kind nuclear research infrastructure. The design and the construction of the MYRRHA facility is particularly challenging since it requires the management of a large number of activities in view of achieving technical excellence in compliance with the project budget and schedule. Accordingly, state-of-the-art project ...
Voir le projet

 17

 TERMINÉ 

Fast Reactor Experiments for hYbrid Applications (FREYA)

Date du début: 1 mars 2011, Date de fin: 29 févr. 2016,

"Building up on the former activities accomplished in the previous FPs, namely MUSE in FP5 and EUROTRANS in FP6, it is proposed in the FREYA project to extend the investigations of the subcritical configurations for validation of the methodology for on-line reactivity monitoring of ADS systems. The investigations will be related to the different subcriticality levels for the nominal operation mode ...
Voir le projet

 17

 TERMINÉ 

FP7 High Luminosity Large Hadron Collider Design Study (HILUMI LHC)

Date du début: 1 nov. 2011, Date de fin: 31 oct. 2015,

The Large Hadron Collider (LHC) is the largest scientific instrument ever built. It has been exploring the new energy frontier since 2009, gathering a global user community of 7,000 scientists. It will remain the most powerful accelerator in the world for at least two decades, and its full exploitation is the highest priority in the European Strategy for Particle Physics, adopted by the CERN Counc ...
Voir le projet

 16

 TERMINÉ 

Advanced European Infrastructures for Detectors at Accelerators (AIDA)

Date du début: 1 févr. 2011, Date de fin: 31 janv. 2015,

AIDA (http://cern.ch/aida) addresses the upgrade, improvement and integration of key research infrastructures in Europe, developing advanced detector technologies for future particle accelerators, as well as transnational access to facilities that provide these research infrastructures.In line with the European Strategy for Particle Physics, AIDA targets the infrastructures needed for R&D, prototy ...
Voir le projet

 39

 TERMINÉ 

European Nuclear Science and Applications Research (ENSAR)

Date du début: 1 sept. 2010, Date de fin: 31 déc. 2014,

ENSAR is the Integrating Activity of Nuclear Scientists from almost all European countries performing research in three of the major subfields of Nuclear Physics: Nuclear Structure, Nuclear Astrophysics and Applications of Nuclear Science. It proposes an optimised ensemble of Networking (NAs), Transnational Access and Joint Research Activities (JRAs), which will ensure qualitative and quantitative ...
Voir le projet

 32

 TERMINÉ 

Test Infrastructure and Accelerator Research Area (TIARA)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2014,

"The main objective of TIARA (Test Infrastructure and Accelerator Research Area) is the integration of national and international accelerator R&D infrastructures into a single distributed European accelerator R&D facility. This will include the implementation of organisational structures to enable the integration of existing individual infrastructures, their efficient operation and upgrades, and t ...
Voir le projet

 11

 TERMINÉ 

Study of Strongly Interacting Matter (HADRONPHYSICS3)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2014,

The Project promotes the access to five European Research Infrastructures, and it is structured into nine Networking Activities, plus the Management of the Consortium, and fourteen Joint Research Activities.The Project will profit of the success of the previous HadronPhysics project in FP6 and the current HadronPhysics2 in FP7, and originates from the initiative of more than 2.500 European scienti ...
Voir le projet

 52

 TERMINÉ 
The EURATOM FP7 Collaborative Project “Fast / Instant Release of Safety Relevant Radionuclides from Spent Nuclear Fuel (CP FIRST-Nuclides)” is established with the overall objective to provide for improved understanding of the fast / instantly released radionuclides from disposed high burn-up UO2 spent nuclear fuel. This issue is given a high priority in the SRA of the IGD-TP. The outcome of the p ...
Voir le projet

 11

 TERMINÉ 

The Preparatory Phase for the Cherenkov Telescope Array (CTA-PP) (CTA-PP)

Date du début: 1 oct. 2010, Date de fin: 31 août 2014,

"The Cherenkov Telescope Array CTA will be the first open facility for gamma-ray astronomy in thevery-high-energy domain, with a performance which is dramatically improved over existing instruments in terms of sensitivity, energy coverage, survey capability and flexibility. CTA will probe non-thermal phenomena in the Universe – known to have comparable energy content to other forms of energy ...
Voir le projet

 20

 TERMINÉ 
Key questions in physics can be answered only by constructing a giant underground observatory to search for rare events and study terrestrial and astrophysical neutrinos. The Astroparticle Roadmap of ApPEC/ASPERA strongly supports this, recommending that: “a new large European infrastructure of 100'000-500'000 ton for proton decay and low-energy neutrinos be evaluated as a common design study tog ...
Voir le projet

 39

 TERMINÉ 

European NoVel Imaging Systems for ION therapy (ENVISION)

Date du début: 1 févr. 2010, Date de fin: 31 juil. 2014,

Following the pioneering experiences which lasted several decades, particle therapy has become a recognized way of curing cancer. 2 new European dual-ion facilities (Heidelberg, Pavia) will soon become operational, followed by several others which are today at different stages of planning and construction. Hadron therapy faces the challenge of improving treatment outcomes with tools able to provid ...
Voir le projet

 16

 TERMINÉ 

European Research Infrastructures for Nuclear Data Applications (ERINDA)

Date du début: 1 déc. 2010, Date de fin: 30 nov. 2013,

Different concepts involving critical (fast) reactors or subcritical accelerator-driven systems are being studied in view of their transmutation capabilities. These design studies imply high demands on the underlying nuclear database. The need for improved nuclear data has been expressed in the Strategic Research Agenda of the SNE-TP ( Sustainable Nuclear Energy Technology Platform).The accurate k ...
Voir le projet

 15

 TERMINÉ 

Accurate Nuclear Data for nuclear Energy Sustainability (ANDES)

Date du début: 1 mai 2010, Date de fin: 31 oct. 2013,

"According to the recent publications of the European Technological Platform for a Sustainable Nuclear Energy (SNETP) (Vision report and Strategic Research Agenda) the sustainability require the combination of the present LWR, future Advanced Fast reactors and the waste minimization in closed cycles with Partitioning and Transmutation. To implement these new nuclear systems and their fuel cycles i ...
Voir le projet

 21

 TERMINÉ 

Support of Public and Industrial Research using Ion Beam Technology (SPIRIT)

Date du début: 1 mars 2009, Date de fin: 31 août 2013,

"SPIRIT is an Integrating Activities project integrating 7 leading ion beam facilities and 4 research providers from 7 Member States and 1 Associated State. The 7 partners providing TransNational Access supply ions in an energy range from ~10 keV to 100 MeV for modification and analysis of solid surfaces, interfaces, thin films and nanostructured systems. The techniques cover materials, biomedical ...
Voir le projet

 12

 TERMINÉ 

European Coordination for Accelerator Research and Development (EuCARD)

Date du début: 1 avr. 2009, Date de fin: 31 juil. 2013,

Particle physics stands at the threshold of a new era of discovery and insight. Results from the much awaited LHC are expected to shed light on the origin of mass, supersymmetry, new space dimensions and forces. In July 2006 the European Strategy Group for Particle Physics defined accelerator priorities for the next 15 years in order to consolidate the potential for discovery and conduct the requi ...
Voir le projet

 39

 TERMINÉ 
"Gas-Cooled Reactors (GCR), RBMK and some Material Test Reactors (MTR) make use of graphite as moderator of the fuel, structures of the core and/or thermal columns. During operation, the graphite and other carbonaceous materials like carbon brick, pyrocarbon and silicon carbide coatings are contaminated by fission products and neutron activation. These irradiated carbonaceous wastes are problemati ...
Voir le projet

 30

 TERMINÉ 
The objective of the proposal is based on the outcome of PATEROS CA to assess more in depth the regional approach to P&T implementation. It will respond to one of the key-topics put forward by the Strategic Research Agenda of SNETP. The project intends to look at the economical aspects of the most realistic scenario for P&T with the hypothesis: limit the MA bearing fuel transport and limit the MA ...
Voir le projet

 11

 TERMINÉ 

Deepening and Broadening of Astroparticle Physics European Coordination (ASPERA-2)

Date du début: 1 juil. 2009, Date de fin: 31 déc. 2012,

Astroparticle Physics has become a mature and well accepted science discipline. Demonstrated by many world class projects currently developed and run by European Astroparticle physicists, Europe as a whole is the main promoter and leading the field. As a merit of ASPERA (AStroparticle Physics European Research Area network, http://www.aspera-eu.org ), the ERA-NET in Astroparticle Physics funded in ...
Voir le projet

 22

 TERMINÉ 
"Besides the European Global Energy Policy, the European Council adopted an action plan that covers nuclear technologies and supports research in order to ""further improve nuclear safety and the management of radioactive waste"". To obtain a more efficient and sustainable management of radioactive waste and hence reduce the burden on geological storage, one can apply partitioning and transmutatio ...
Voir le projet

 20

 TERMINÉ 

SPIRAL2 PREPARATORY PHASE (SPIRAL2PP)

Date du début: 1 nov. 2007, Date de fin: 31 mars 2012,

The SPIRAL 2 Preparatory Phase project aims to achieve the development and signing of the consortium agreement allowing for the construction of the facility. The SPIRAL 2 project located at the GANIL facility (Caen, France) will deliver energetic rare (radioactive) isotope beams with intensities not yet available with presently running machines. The studies of the properties of nuclei forming thes ...
Voir le projet

 25

 TERMINÉ 
In the framework of the KM3NeT Preparatory Phase project the strategic, legal and financial issues are addressed related to the construction of an European deep-sea infrastructure housing a cubic kilometre size Cherenkov neutrino telescope and providing access for deep-sea research. Many technical issues are already addressed in the KM3NeT Design Study, started in 2006, that at the end of its work ...
Voir le projet

 21

 TERMINÉ 

Study of Strongly Interacting Matter (HadronPhysics2)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2011,

The Project promotes the access to five European Research Infrastructures, and it is structured intop eight Networking Activities, plus the Management of the Consortium, and fourteen Joint Research Activities. The Project represents the continuation of the successful HadronPhysics project in FP6 and originates from the initiative of more than 2.500 European scientists working in the field of hadro ...
Voir le projet

 46

 TERMINÉ 
"Key questions in particle and astroparticle physics can be answered only by construction of new giant underground observatories to search for rare events and to study sources of terrestrial and extra-terrestrial neutrinos. In this context, the European Astroparticle Roadmap of 03/07, via ApPEC and ASPERA, states: “We recommend a new large European infrastructure, an international multi-purpose f ...
Voir le projet

 21