Rechercher des projets européens

16 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Sharing Cities (SHAR-LLM)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2020,

Sharing Cities has four key objectives. 1) To achieve scale in the European smart cities market by proving that properly designed smart city solutions, based around common needs, can be integrated in complex urban environments. This will be done in a way that exhibits their true potential and allows for the significant scale-up and consequent increase in social, economic and environmental value. ...
Voir le projet

 36

 TERMINÉ 

READY

Date du début: 1 déc. 2014, Date de fin: 30 nov. 2019,

"Based on thorough integrated climate planning the READY project will demonstrate a Whole City Approach including: 1) Demo of a balanced and holistic approach towards affordable retrofitting of residential buildings and offices 2) Development and demo of new solutions for low-temp. district heating, components and management ICT systems 3) Development and demo of flexible combined grid balancing/e ...
Voir le projet

 23

 TERMINÉ 
MulitPACK will be the confidence building demonstrator for standardised integrated cooling & heating packages installed in high energy demanding buildings. The roll-out of new energy efficient plug-and-play units should reduce the specific energy consumption by more than 25 %, simultaneously reducing the total cost of ownership. A scientific-supported introduction of innovative packages, all parts ...
Voir le projet

 7

 TERMINÉ 

Cyber Physical System based Proactive Collaborative Maintenance (MANTIS)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

The overall concept of MANTIS is to provide a proactive maintenance service platform architecture based on Cyber Physical Systems that allows to estimate future performance, to predict and prevent imminent failures and to schedule proactive maintenance. Maintenance is no longer a necessary evil that costs what it costs, but an important function that creates additional value in the business proces ...
Voir le projet

 47

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 

Next Generation of Heat Pumps working with Natural fluids (NXTHPG)

Date du début: 1 déc. 2012, Date de fin: 30 nov. 2016,

The main objective of the project is the development of several reliable, safe, high efficiency and high capacity heat pumps working with the two most promising natural refrigerants: Hydrocarbons andCO2, together with a set of improved components and auxiliary devices adequate for the efficient and safe use of the two refrigerants.The project aims to reach a higher efficiency (10-20% SPF improveme ...
Voir le projet

 15

 TERMINÉ 

Automation and Robotics for EUropean Sustainabile manufacturing (AREUS)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

European Factories of the Future will have to be smart and green:• SMART: high performance, reconfigurable, adaptive and evolving factories based on robotic technologies ,• GREEN: reduced ecological footprint through a more efficient use, at factory level, of material and energy resources.Industrial Robotics is the strategic technology needed to keep the European Manufacturing leading edge, unfort ...
Voir le projet

 12

 TERMINÉ 
Description SME-suitable robots that assist in managing uncertainty by symbiotic Human-Robot-Interaction and embedded cognition Over two-thirds of European workers in manufacturing are employed in small and medium-sized enterprises (SMEs). While robots are able to carry out repetitive tasks to a h ...
Voir le projet

 26

 TERMINÉ 

Tools for Enhanced Photovoltaic System Performance (PERFORMANCE PLUS)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2015,

For a continued decrease of levelised costs of energy from photovoltaics (PV), the prices of PV system components have to be further decreased while performance, functionality, reliability and lifetime on the component and system level need to be increased. In an integrated view, PV system performance emerges from, but is not limited to the performance of the components. The Performance Plus proje ...
Voir le projet

 9

 TERMINÉ 
"HERCULES was conceived in 2002 as a long-term R&D Programme, to develop new technologies for marine engines. It is the outcome of a joint vision by the two major European engine manufacturer Groups MAN & WARTSILA, which together hold 90% of the world’s marine engine market.The present proposed HERCULES-C project is the Phase III of the HERCULES Programme. In order to take marine engine technology ...
Voir le projet

 23

 TERMINÉ 

Reduced Certification Costs for Trusted Multi-core Platforms (RECOMP)

Date du début: 1 avr. 2010, Date de fin: 31 mars 2013,

"The proposed RECOMP (Reduced certification cost for trusted multi-core platforms) research project will establish methods, tools and platforms for enabling cost-efficient certification and re-certification of safety-critical systems and mixed-criticality systems, i.e. systems containing safety-critical and non-safety-critical components.RECOMP recognizes the fact that the increasing processing po ...
Voir le projet

 40

 TERMINÉ 
Background For the past 10 years much of the research into centralised refrigeration systems has examined so-called transcritical CO2 refrigeration systems, which use CO2 as a refrigerant instead of hydrofluorocarbon refrigerants (HFCs) and so have a reduced impact on global warming. This technology was believed to have the potential to achieve lower cost ...
Voir le projet

 5

 TERMINÉ 
The latest 2006 report from OECD PISA shows that young Europeans in general lack engagement and interest in science and that they do not fully understand the key part that science plays in today's societies and economies. This situation needs to be reversed. To be able to do that there is a need for making a training course that implements teaching approaches to datalogging. Our project therefore ...
Voir le projet

 5

 TERMINÉ 
New multimedia and transnational learning method for production managers : For this project, a series of teaching modules has been devised based on learning tasks which reproduce real work contexts. This was done transnationally with the help of the partner countries. The modules combine class teaching with distance learning. The results of this project are available on the website and are conti ...
Voir le projet

 9

 TERMINÉ 
In the near future the sector of heat-pump technology, refrigeration and air conditioning will be subject to a multitude ofchanges, both on national and on European level. These changes range from: [1] Market changes; [2] Changes in law ®ulations; [3] Technical and technological developments; [4] Organizational and managerial changes; [5] Europeanharmonization. Furthermore, the sector struggles ...
Voir le projet

 7

 TERMINÉ 
Credit where credit's due : The project has developed a vocational qualification transfer system that allows for cross-border recognition of acquired skills and competences. The system improves the mobility of students in vocational training and leads to improvements in vocational education and training throughout Europe. This project started in 2003 and lasted 36 months.
Voir le projet

 34