Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
We are proposing a 4-year program of knowledge transfer and networking between Aston University, UK (Aston), Cork Institute of Technology, Ireland (CIT), Institute of Nanoscience and Nanotechnology, Spain (ICN2), University of Birmingham, UK (UoB), Zhejiang University of Technology, China (ZJUT), Nanotechplamsa Ltd, Bulgaria (NPL), B&T composites, Greece (B&T), National Institute for Research and ...
Voir le projet

 6

 TERMINÉ 

Sustainable Market Actors for Responsible Trade (SMART)

Date du début: 1 mars 2016, Date de fin: 29 févr. 2020,

This Project aims to address an increasingly pressing global challenge: How to achieve the EU’s development goals and the UN’s Sustainable Development Goals, while meeting the global target of staying within two degrees global warming and avoid transgressing other planetary boundaries.EU policies must align with sustainable development goals (Article 11 TFEU). The impacts of climate change and glo ...
Voir le projet

 25

 TERMINÉ 

Ophthalmic OCT on a Chip (OCTCHIP)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

Silicon photonics is expected to leverage-off many of the advances made in CMOS electronics. International R&D efforts in this field have so far been mainly focused on the silicon-on-insulator (SOI) photonic integrated circuit (PIC) technology platform because it is predestined for datacom, high-performance computing and telecom applications. However, SOI based integrated optical waveguides cannot ...
Voir le projet

 7

 TERMINÉ 

Integrated Smart Spatial Exploration System (INSPEX)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

"The objective of INSPEX is to make obstacle detection capabilities that are currently only feasible on autonomous vehicles available as a personal portable/wearable multi-sensor, miniaturised, low power spatial exploration system. The INSPEX System will be used for real-time 3D detection, location and warning of obstacles under all environmental conditions in indoor and outdoor environments with ...
Voir le projet

 9

 TERMINÉ 

Sensor Enabled Affective Computing for Enhancing Medical Care (SenseCare)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

This project brings together a diverse group of subject matter experts from industry and academia under one umbrella, with the main aim of enhancing and advancing future healthcare processes and systems using sensory and machine learning technologies to provide emotional (affective) and cognitive insights into patients well-being so as to provide them with more effective treatment across multiple ...
Voir le projet

 5

 TERMINÉ 
Life cycle cost of electricity generated by marine renewable technologies is determined by multiple factors including energy production capability, capital costs, and operating and maintenance (O&M) costs, as well as multiple other logistical, permitting, environmental, and finance cost factors. ORPC’s direct experience has been that operating and maintenance costs are dominant in the cost structu ...
Voir le projet

 5

 TERMINÉ 

Integrated Technology Ecosystem for ProACTive Patient Centred Care (ProACT)

Date du début: 1 janv. 2016, Date de fin: 30 juin 2019,

ProACT targets Europe’s 50 million multimorbid patients to proactively self-manage and offset the EU’s annual €700billion cost of chronic disease management. ProACT aims at providing and evaluating an open application programming interface to integrate a variety of new and existing technologies to advance ‘home based’ integrated care (IC). Cloud based data analytics will determine correlations bet ...
Voir le projet

 14

 TERMINÉ 
Nowadays we are lucky to have many exciting new technologies available, like Ubiquitous Computing (UbiComp), Mobile Computing (MobiCom) and the Internet of Things (IoT); in the following, we shall refer to them collectively as UMI. These technologies are so modern and powerful that can be both an educational means and end, thus fostering innovation and supporting promising scientific careers. The ...
Voir le projet

 7

 TERMINÉ 

DAtacommunications based on NanophotoniC Resonators (DANCER)

Date du début: 1 déc. 2013, Date de fin: 31 mai 2019,

A key challenge for the 21st century is, therefore to provide billions of people with the means to access, move and manipulate, what has become, huge volumes of information. The environmental and economic implications becoming serious, making energy efficient data communications key to the operation of today’s society.In this project, the Principal Investigator will develop a new framework for opt ...
Voir le projet

 2

 TERMINÉ 
MOEEBIUS introduces a Holistic Energy Performance Optimization Framework that enhances current (passive and active building elements) modelling approaches and delivers innovative simulation tools which (i) deeply grasp and describe real-life building operation complexities in accurate simulation predictions that significantly reduce the “performance gap” and, (ii) enhance multi-fold, continuous op ...
Voir le projet

 17

 TERMINÉ 

Smart Resilience Indicators for Smart Critical Infrastructures (SmartResilience)

Date du début: 1 mai 2016, Date de fin: 30 avr. 2019,

"Modern critical infrastructures are becoming increasingly “smarter” (e.g. cities). Making the infrastructures “smarter” usually means making them smarter in normal operation and use: more adaptive, more intelligent… But will these smart critical infrastructures (SCIs) behave equally “smartly” and be “smartly resilient” also when exposed to extreme threats, such as extreme weather disasters or ter ...
Voir le projet

 21

 TERMINÉ 

Energy Saving Lighthouse Cities in the NPA region (e-Lighthouse)

Date du début: 26 avr. 2016, Date de fin: 25 avr. 2019,

Description (EN): Project actions will support increased energy efficiency in buildings (40% of EU energy consumption) and increase the uptake of renewable energy, thus decreasing carbon dioxide emissions. Our goal is to support and follow-up the retrofit of more than 250 public buildings. In the private sector with the consultation of building supervisory authorities, the project a ...
Voir le projet

 10

 TERMINÉ 
Objectives1. Improve the competitiveness of the EU industrial sector by reducing 20% energy costs in industrial water processes. (WP4)A total reduction of 26 GWh/year will be achieved at the end of the project implementing energy efficiency measures in the European manufacturing companies.2. Identify saving potentials and benchmark energy performance through an Energy Management Self-Assessment (E ...
Voir le projet

 10

 TERMINÉ 

Energy Efficient Optimised District Heating and Cooling (E2District)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2019,

Intelligent Energy Europe expects district heating to double its share of the European heat market by 2020 while district cooling will grow to 25%. While this expansion will translate into 2.6% reduction in the European primary energy need and 9.3% of all carbon emissions, it will not be achieved through modernization and expansion alone but requires fundamental technological innovation to make th ...
Voir le projet

 5

 TERMINÉ 
Emerging evidence indicates that the gut microbiome contributes to our ability to extract energy from the diet and influences development and function of the immune, endocrine and nervous systems, which regulate energy balance and behaviour. This has led to hypothesize that developing microbiome-based dietary interventions can be cost-effective measures to prevent diet-related and behavioural diso ...
Voir le projet

 30

 TERMINÉ 

Tools for cOntinuous building Performance Auditing (TOPAs)

Date du début: 1 nov. 2015, Date de fin: 31 oct. 2018,

As occupant behaviour can be considered as one of the main drivers of the performance gap, TOPAs will focus on reducing the gap from an operational perspective, hence supporting Post Occupancy Evaluation. Quantifying the performance gap is non-trivial, the performance gap is dependent on time and contextual factors, and individual buildings will have a particular performance gap. The delivery of e ...
Voir le projet

 9

 TERMINÉ 

Synchro-modal Supply Chain Eco-Net (SYNCHRO-NET)

Date du début: 1 mai 2015, Date de fin: 31 oct. 2018,

SYNCHRO-NET will demonstrate how a powerful and innovative SYNCHRO-modal supply chain eco-NET can catalyse the uptake of the slow steaming concept and synchro-modality, guaranteeing cost-effective robust solutions that de-stress the supply chain to reduce emissions and costs for logistics operations while simultaneously increasing reliability and service levels for logistics users.The core of the ...
Voir le projet

 19

 TERMINÉ 

Flip IT! – Flipped Classroom in the European Vocational Education

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

One of the burning issues of today is how to improve the quality of learning/teaching in schools. Thousands of studies and scientific research has tried to reveal the best methods, and to formulate usable advice in order to transfer theoretical conclusions into the daily practice of our schools. A particular focus has been placed on European vocational educational (VET) schools and training centre ...
Voir le projet

 10

 TERMINÉ 

Training rural farmers in the use of mobile applications for agricultural activities

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

The acquisition of basic digital skills has been identified as one of the principal adults´ training needs to acquire to match the requirements of today´s changing labour markets. This is important particularly in rural areas where the spread of ICT has been lower than in urban areas, therefore rural citizens find more difficulties in order to access ICT training. There are many mobile application ...
Voir le projet

 5

 TERMINÉ 

Transnational Education in LEADER Implementation 2

Date du début: 1 sept. 2016, Date de fin: 31 août 2018,

The project is based around the LEADER program which is a highly effective and successful model of integrated social and economic development in rural communities. LEADER is delivered in a variety of different fashions by the member states.The project will entail a study of the delivery of the LEADER programme - seeking examples of the most efficient modes of implementation in the partner coun ...
Voir le projet

 10

 TERMINÉ 

Hacia una formación sin límites

Date du début: 1 sept. 2016, Date de fin: 31 août 2018,

The Secondary Education School, IES Politécnico Hermenegildo Lanz, of Granada, wishes to take part in an Erasmus+ project for VET learners in order to increase the quality of training, expand their career opportunities and strengthen a network of collaboration between different countries of the European Union to fulfil the principle of Unity in Diversity. The project plans the mobility of 10 pa ...
Voir le projet

 18

 TERMINÉ 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

Cruising Oceans On Latitudes above 51º North (Cool Route)

Date du début: 2 juin 2015, Date de fin: 1 juin 2018,

Description (EN): The project investigates all aspects of the practical logistics and business potential to establish a bi-directional yacht cruising route along the offshore areas of the Northern Periphery Area, stretching from the South of Ireland, to the UK (Northern Ireland and Western Scotland) on onwards to Norway. As an eco-tourism product, exploiting the natural resources of ...
Voir le projet

 8

 TERMINÉ 
EU CISE 2020 is an important step towards the accomplishment of the European roadmap for CISE; the project attains the widest possible experimental environment of innovative and collaborative processes between European maritime institutions.EU CISE 2020 takes as reference a broad spectrum of factors in the field of European Integrated Maritime Surveillance, arising from the European legal framewor ...
Voir le projet

 38

 TERMINÉ 
A new EU 7th Framework Programme project, “LEANWIND” (Logistic Efficiencies And Naval architecture for Wind Installations with Novel Developments) seeks to apply lean principles to the offshore wind farm project lifecycle. The primary LEANWIND objective is to provide cost reductions across the offshore wind farm lifecycle and supply chain through the application of lean principles and the developm ...
Voir le projet

 32

 TERMINÉ 

Access CenTer for PHotonics innovAtion Solutions and Technology support (ACTPHAST)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2017,

ACTPHAST is a unique "one-stop-shop" European access centre for photonics innovation solutions and technology support (Access CenTre for PHotonics innovAtion Solutions and Technology support). ACTPHAST will support and accelerate the innovation capacity of European SMEs by providing them with direct access to the expertise and state-of-the-art facilities of Europe's leading photonics research cent ...
Voir le projet

 29

 TERMINÉ 
New companies, especially SMEs, represent the most important source of new employment in Europe: they create more than 4 million new jobs every year. To bring Europe back to growth and higher levels of employment, Europe in general, but the countries of GREEN MENTOR project in particular (Spain, Austria, Hungary and Ireland), need more entrepreneurs. The transition to a green economy offers great ...
Voir le projet

 5

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2016, Date de fin: 30 sept. 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 
Buildings Operational stage represents 80% of building’s life-cycle cost of which 50% is consequence of the energy use. Up to 90% of the buildings’ life cycle carbon emissions occur during their operational phase, mainly as consequence of the HVAC, lighting and appliances’ energy use. Therefore, energy and cost saving strategies addressing this building operation phase will have a major impact in ...
Voir le projet

 13

 TERMINÉ 

Take the energy bill back to the promised building performance (TRIBUTE)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

Today, Building Energy Performance Simulation (BEPS) analysis tends to show a large discrepancy with real energy performance. Most cases are due to gross mistakes rather than fundamental inadequacy of available technology and methods. The reasons are manifold. Highly simplified calculation methods are used far beyond their domain of validity. Assumed boundary conditions such as occupant behaviour ...
Voir le projet

 18

 TERMINÉ 

Applying ECVET and ECTS to certify competences and skills in maritime port sector

Date du début: 1 sept. 2014, Date de fin: 31 août 2017,

The project aims to support national and regional rules on the skills recognizing according to the ECTVET system. The partnerships aims to develop innovation on method of recognizing skills and management in the port and logistics field. The implementation proposal is focused on the skills and competences of the professionals in the sector. At this aim, 3 level of professionals (managerial, interm ...
Voir le projet

 6

 TERMINÉ 

CoderDojo Training in ICT Programming Skills

Date du début: 1 sept. 2014, Date de fin: 31 août 2017,

...hich has been developed and grown on a totally voluntary basis, provides such an innovative approach which can very valuably inform European policy development. The CoderDojo movement was started in Cork, Ireland, in 2011. CoderDojo is a totally free of cost voluntary movement to teach young people how to write computer code, it raises awareness of potential to set up business and it works extens ...
Voir le projet

 5

 TERMINÉ 

The Art of Inclusion

Date du début: 1 sept. 2014, Date de fin: 31 août 2017,

CONTEXT/BACKGROUND OF PROJECT; CIT CCAD has worked in close collaboration from Cork City Council and Crawford Art Gallery to develop work that contributes to the development of the field of creative inclusive educational practices with adult learners/ artists with intellectual disabilities. Work so far has resulted in production of a publication and an exhibition engaging over 32000 visitors, a s ...
Voir le projet

 4

 TERMINÉ 
-context/background of project; The prosposal for a job shadow for two people has emerged from a relationship developed in a KA2 project particularly a workshop activity in which educators met and developed an interest to development a more in depth learning experience between Irish/Spanish peers in relation to engaging adult learners/ artists with intellectual disabilities in art programmes-obje ...
Voir le projet

 2

 TERMINÉ 

Trans National Creative Exchange

Date du début: 1 août 2015, Date de fin: 31 juil. 2017,

Trans National Creative Exchange will be an international platform supporting the most exciting emerging creative talent from Europe and China. It will foster both professionals and students in the development and internationalization of their careers, allowing them to work in partnership to experiment, create and present new work for all, whilst gaining valuable experience and establishing profes ...
Voir le projet

 4

 TERMINÉ 

RESPONSE-able: From Empathy and Awareness to Action

Date du début: 1 nov. 2016, Date de fin: 30 juin 2017,

The application is focused on one Activity. This is a training programme that will take place over seven days in March 2017 in Cork with 32 people involved.Countries involvedIrelandnetherlandsHungaryUKThe training is coordinated by CIT CCAD but will offered to Irish youth worker/ young leaders across the country both from youth work Ireland and other youth organisationsThe training will provide a ...
Voir le projet

 5

 TERMINÉ 

MOINHOS II – Formar para Inovar

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

The Consortium MOINHOS was established in 2014 in order to participate in the Erasmus + by the following organisations: (1) Municipality of Torres Vedras, as leader of the Consortium, and vocational schools in the region, which assumed the role of sending entity: (2) Escola de Comércio e Serviços do Oeste (SEFO/ESCO), (3) Escola Profissional e Agrícola Fernando Barros Leal (EPAFBL), (4) Externato ...
Voir le projet

 42

 TERMINÉ 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

YW-Building Future

Date du début: 16 mars 2015, Date de fin: 16 mars 2017,

"Building Future" was a project that project that gave possibility to one project manager within InterCollege Norway to develop its capacity managerial capacity and skills. The project entailed a two-month job-shadowing that was undertaken in InterCollege Denmark by Bojana Ilic. The job-shadowing gave Bojana best practices and knoweledge about the following subjects: 1. Organizational cultures 2 ...
Voir le projet

 13

 TERMINÉ 

Integrated Approaches to Food Allergen and Allergy Risk Management (IFAAM)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

Up to 20 million European citizens suffer from food allergy. However management of both food allergy (by patients and health practitioners) and allergens (by industry) is thwarted by lack of evidence to either prevent food allergy developing or protect adequately those who are already allergic. iFAAM will develop evidence-based approaches and tools for MANAGEMENT of ALLERGENS in FOOD and integrate ...
Voir le projet

 46