Rechercher des projets européens

28 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The problem: finding the right patient for the right treatmentDespite a large and growing disease burden in osteoarthritis (OA), many pharmaceutical companies have de-emphasized or even abandoned OA drug development due to perceived hurdles. Crucial in this is the lack of appropriate outcome measures that can robustly identify patient benefit from a specific therapy. The lack of specific and sensi ...
Voir le projet

 25

 TERMINÉ 

Combatting Bacterial Resistance in Europe (COMBACTE-NET)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2019,

The emergence of Antibiotic-resistant bacteria (ARB) is a global problem, having recently been elevated to the top three threats identified by the World Health Organisation (WHO), and subject of numerous national and international government activities, including the Trans-Atlantic Task Force on Antimicrobial Resistance established by the US and EU presidencies. The estimated costs of ARB are aro ...
Voir le projet

 38

 TERMINÉ 

European Clinical Research Infrastructures Network - Integrating Activity (ECRIN-IA)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2017,

ECRIN is a distributed ESFRI-roadmap pan-European infrastructure designed to support multinational clinical research, making Europe a single area for clinical studies, taking advantage of its population size to access patients. Servicing multinational trials started during its preparatory phase, and it now applies for an ERIC status by 2011. The ERIC budget will be restricted to core activities re ...
Voir le projet

 48

 TERMINÉ 
LASHARE will develop a robust assessment framework for innovative laser equipment paving the way for new manufacturing applications. It will carry out a large number of assessment experiments for a variety of laser equipment targeting strategic manufacturing areas for Europe.The Laser Equipment Assessment (LEA) will be carried out by a trio of research/supplier/user partners. Each LEA will define ...
Voir le projet

 40

 TERMINÉ 

Reconfigurable ROS-based Resilient Reasoning Robotic Cooperating Systems (R5-COP)

Date du début: 1 févr. 2014, Date de fin: 31 mars 2017,

European manufacturing industry faces increasing product variances resulting as a consequence of frequent innovation, short product lifecycles, small series production, and shrinking production cycles. At the same time, production cost must be continuously reduced.Agile, transformable and re-usable automation and robotics is be a key enabler to manage those trends. However, few robotic components ...
Voir le projet

 34

 TERMINÉ 

Arrowhead (ARROWHEAD)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Voir le projet

 87

 TERMINÉ 

Novel Methods in Computational Finance (STRIKE)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2016,

"In recent years the computational complexity of mathematical models employed in financial mathematics has witnessed a tremendous growth. Advanced numerical techniques are imperative for the most present-day applications in financial industry.The motivation for this training network is the need for a network of highly educated European scientists in the field of financial mathematics and computati ...
Voir le projet

 11

 TERMINÉ 

Future Internet - Core (FI-Core)

Date du début: 1 sept. 2014, Date de fin: 30 sept. 2016,

FI-WARE has started to materialize as a powerful foundation for the Future Internet. FI-WARE is an innovative, open cloud-based infrastructure for cost-effective creation and delivery of services, at a scale not seen before. FI-WARE is now well under way to successfully achieve its goals of boosting the effectiveness of creating new services of high economic and societal value, reinforcing EU comp ...
Voir le projet

 33

 TERMINÉ 
PhoxTrot is a large-scale research effort focusing on high-performance, low-energy and cost and small-size optical interconnects across the different hierarchy levels in Data Center and High-Performance Computing Systems: on-board, board-to-board and rack-to-rack. PhoxTrot will tackle optical interconnects in a holistic way, synergizing the different fabrication platforms (CMOS electronics, Si-pho ...
Voir le projet

 22

 TERMINÉ 

Fabrication and Functionalization of BioMedical Microdevices (FaBiMed)

Date du début: 2 sept. 2013, Date de fin: 1 sept. 2016,

The aim of FaBiMed proposal is to improve and develop new manufacturing techniques, based on micromoulding, specific for biomedical microdevices. The project will be to reducing the cost of mass production of diagnosis and therapeutic micro devices which have a common problematic: medium sized batches, customization needs, micron-scale geometrical features. These include optofluidic sensors (MIR t ...
Voir le projet

 12

 TERMINÉ 
For the first time, more than 50% of the world's population live in urban areas. By 2050, c. 70% of people are likely to be city dwellers, compared with less than 30% in 1950. This trend brings with it increased security and safety threats in urban areas, not least to urban built infrastructure. The central aim of HARMONISE (A Holistic Approach to Resilience and Systematic ActiOns to Make Large Sc ...
Voir le projet

 15

 TERMINÉ 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Voir le projet

 154

 TERMINÉ 
The overall scope of the DAPhNE project is to develop and demonstrate a package of integrated solutions for energy intensive processes (ceramics, cement and glass), based on tuning micro-wave technologies to the material characteristics and on intelligent control systems, to provide real time information about the energy consumption as well as the product quality.Microwave heating is now a well e ...
Voir le projet

 18

 TERMINÉ 

Highly Efficient Tubular Membranes for Oxy-Combustion (HETMOC)

Date du début: 1 sept. 2011, Date de fin: 31 août 2015,

This project will develop and demonstrate Highly Efficient Tubular Membranes for OxyCombustion. Oxycombustion is a promising option for implementing cost-efficient carbon capture and sequestration (CCS) in future coal fired power plants. The use of oxygen membranes in the process has the potential to significantly reduce the efficiency losses associated with the capture and to improve the overall ...
Voir le projet

 8

 TERMINÉ 

Transitions to the Urban Water Services of Tomorrow (TRUST)

Date du début: 1 mai 2011, Date de fin: 30 avr. 2015,

The European project initiative TRUST will produce knowledge and guidance to support TRansitions to Urban Water Services of Tomorrow, enabling communities to achieve sustainable, low-carbon water futures without compromising service quality. We deliver this ambition through close collaboration with problem owners in ten participating pilot city regions under changing and challenging conditions in ...
Voir le projet

 33

 TERMINÉ 
The COMBIOSERVE consortium aims to identify the conditions and principles of successful community-based conservation in selected locations in Mexico, Brazil and Bolivia, working in partnership with local Civil Society Organisations (CSOs) and indigenous communities. Many Latin American and Caribbean rural and indigenous communities have historically developed strategies to regulate land use and co ...
Voir le projet

 11

 TERMINÉ 

MagnetoCaloric Refrigeration for Efficient Electric Air Conditioning (ICE)

Date du début: 1 nov. 2010, Date de fin: 31 oct. 2014,

ICE is focused on the development of a new air conditioning and heat pump system based on the Magneto Caloric heat pump and a on the redesign of the cabin air conditioning and microclimate control to use is the most efficient way the cooling and heating power.The Consortium includes a SME having a relevant and unique KH on Magneto Caloric heat pump, a OEM supported by an acknowledged automotive re ...
Voir le projet

 6

 TERMINÉ 

INTEGRATED PLATFORM FOR INTELLIGENT INDOOR AIR QUALITY AUDIT MANAGEMENT (AIRLOG)

Date du début: 1 févr. 2012, Date de fin: 31 juil. 2014,

While ambient air pollution is being successfully monitored throughout the EU, the situation for indoor air pollution is not nearly as positive. This is of particular concern, as a much wider range of air pollutants are found at high levels indoors than outdoors. Indoor air quality is a major concern to businesses, building managers, tenants, and employees because it can impact the health, comfort ...
Voir le projet

 11

 TERMINÉ 
Groundwater resources are facing increasing pressure from consumptive uses (irrigation, water supply, industry) and contamination by diffuse loading (e.g. agriculture) and point sources (e.g. industry). This cause major threat and risks to our most valuable water resource and on ecosystems dependent on groundwater. New information is need on how to better protect groundwaters and groundwater depen ...
Voir le projet

 28

 TERMINÉ 

EUROpean programme for TRANS-national R&D&I cooperations of BIOtech SMEs (ETB-PRO)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2013,

ETB-PRO will reduce the fragmentation of ERA and support high quality R&D&I project cooperation of European biotech SMEs by building on success factors of the predecessor project and establish a sustainable joint program with high funding impact. This will be done in two steps thereby using four calls with a funding volume of € 35 Mio each as an implementation tool. First step: Integration ETB-PRO ...
Voir le projet

 16

 TERMINÉ 
The objective of this proposal is the creation of a leading edge network supporting a much enhanced range of both network and added value services targeted at end-users across the GÉANT service area. A principal goal will be to create a portfolio of seamless multi-domain services. In contrast to its predecessor, GN2, much more emphasis is placed on service development and service introduction.Init ...
Voir le projet

 35

 TERMINÉ 
A major challenge facing European industry involves the development of more specific, energy saving processes with less environmental impact. The recent development of Metal Organic Frameworks (MOFs) may prove a major milestone in achieving these goals. MACADEMIA project is an extension to an FP6 STREP (DeSANNS) which highlighted some MOF materials for CO2 capture and storage. It will expand and c ...
Voir le projet

 17

 TERMINÉ 
FIEMSER (Friendly Intelligent Energy Management System for Residential Building) addresses the need of achieving energy positive buildings through solutions based on a rational consumption of energy, local generation and an increase in the consciousness of the building owners towards their energy consumption habits.The main goal of FIEMSER matches with the challenges of the Call by aiming to build ...
Voir le projet

 8

 TERMINÉ 

Immersion in the Science Worlds through Arts (ISWA)

Date du début: 1 mars 2011, Date de fin: 28 févr. 2013,

The objective of the project is to use art to communicate emotions related to the understanding of nature and to stimulate students create artistic initiatives able to demonstrate commonalities of artistic and scientific fascination. The objective will be pursued according to two strictly related aspects:1)produce artistic works based on scientific phenomena at a professional level;2)stimulate stu ...
Voir le projet

 16

 TERMINÉ 

Transnational Cooperation of the European Network of NCP SME (TransCoSME)

Date du début: 1 févr. 2008, Date de fin: 31 déc. 2012,

The TranCoSME project intends to support the European network of National Contact Points for the SME-specific measures of the 7th Framework Programme (NCP SME) in their support to proposers in their respective countries. Objectives are to deliver a better quality of service, to increase the efficiency of the work and to enhance networking between the NCPs in Europe. These goals will be achieved by ...
Voir le projet

 42

 TERMINÉ 

Anticipating the Network of the Future - From Theory to Design (Euro-NF)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2012,

Future networks became a central topic with a large debate whether moving towards the new networked society will be evolutionary or disruptive. In the future networked society the physical and the digital worlds will merge based on the massive usage of wireless sensor networks. Objects will be able to identify and locate themselves and to communicate through radio interfaces. Self-organized edge n ...
Voir le projet

 37

 TERMINÉ 

Critical Response in Security and Safety Emergencies (CRISYS)

Date du début: 1 févr. 2011, Date de fin: 31 mai 2012,

"The EU regularly suffers from natural and man-made disaster, the social and economical consequences of which may adversely affect its growth and competitiveness. There is a growing vulnerability to disasters and subsequently an urgent need to improve operational capacities and capabilities of Member States. Furthermore, the Lisbon Treaty will enlarge the role of the EU and allow for stronger coor ...
Voir le projet

 16

 TERMINÉ 

Recovered Paper Sorting with Innovative Technologies (SORT IT)

Date du début: 1 mai 2008, Date de fin: 31 oct. 2011,

SORT IT aims at developing new technologies for a more efficient and profitable sorting of recovered paper and board from various collection systems. These include: * New sensors based on near infrared spectrometry, image analysis and colour measurement (WP 2) * New physical separation devices like robots (WP 3) * New sorting concepts (WP 4) The new sorting devices will be implemented into an indu ...
Voir le projet

 14