Rechercher des projets européens

39 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Sustainable CellulAr networks harVEstiNG ambient Energy (SCAVENGE)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2020,

...ptimisation and proof-of-concept implementation of core network, BS and mobile elements as well as their integration with the smart electrical grid. The consortium is composed of world-class research centres and companies that are in the forefront of mobile communication and renewable energy research and technology development. The attitude of the industrial partners towards the strong investment ...
Voir le projet

 9

 TERMINÉ 

Flexible FE/BE Sensor Pilot Line for the Internet of Everything (IoSense)

Date du début: 1 mai 2016, Date de fin: 30 avr. 2019,

The EU has set the stage to empower semiconductor manufacturing in Europe being one of the key drivers for innovation and employment and creator for answers to the challenges of the modern society. Aim of IoSense is to boost the European competitiveness of ECS industries by increasing the pilot production capacity and improving Time-to-Market for innovative microelectronics, accomplished by establ ...
Voir le projet

 33

 TERMINÉ 

Inkjet-Printed Wireless Powered Circuits for Sensing and Identification (iREACT)

Date du début: 11 févr. 2016, Date de fin: 10 févr. 2019,

The project establishes the application of inkjet printing as a key technology for the implementation of batteryless and wireless sensor and communication circuits based on wireless power transfer and energy harvesting, enabling the realization of the Internet of Things (IoT). Inkjet printing supports a large volume production, achieves a good resolution necessary for high frequency electronics, e ...
Voir le projet

 1

 TERMINÉ 
Europe would be close to solving problems related to congestion, traffic safety and environmental challenges if people, vehicles, infrastructure and business were connected into one cooperative ecosystem combining integrated traffic and transport management with new elements of ubiquitous data collection and system self-management. The main objective is increasing the safety, sustainability, flexi ...
Voir le projet

 11

 TERMINÉ 

Shared Access Terrestrial-Satellite Backhaul Network enabled by Smart Antennas (SANSA)

Date du début: 1 févr. 2015, Date de fin: 31 janv. 2018,

The aim of SANSA project is to boost the performance of mobile wireless backhaul networks in terms of capacity and resilience while assuring an efficient use of the spectrum. Recently, a global mobile traffic increase of 11-fold between 2013 and 2018 was predicted, so novel solutions are required to avoid backhaul becoming the bottle neck of future mobile networks. The solution envisaged in SANSA ...
Voir le projet

 8

 TERMINÉ 
The goal of AUDITOR is the implementation of novel precise-positioning techniques based on augmentation data in custom GNSS receivers to improve the performance of current augmentation services and reducing costs. These techniques are already patented by the consortium and proven to offer better accuracy with faster convergence times than solutions commercially available. More sophisticated atmosp ...
Voir le projet

 7

 TERMINÉ 

5G-Crosshaul: The 5G Integrated fronthaul/backhaul (5G-Crosshaul)

Date du début: 1 juil. 2015, Date de fin: 31 déc. 2017,

...rogeneous transmission links (e.g., fibre or wireless optics, high-capacity copper, mmWave) interconnecting Remote Radio Heads, 5GPoAs (e.g., macro and small cells), cloud-processing units (mini data centres), and points-of-presence of the core networks of one or multiple service providers. This transport network will flexibly interconnect distributed 5G radio access and core network functions, h ...
Voir le projet

 21

 TERMINÉ 

Peer to Peer Smart Energy Distribution Networks (P2P-SmartTest) (P2P-SmarTest)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

P2P-SmartTest project investigates and demonstrates a smarter electricity distribution system integrated with advanced ICT, regional markets and innovative business models. It will employ Peer-to-Peer (P2P) approaches to ensure the integration of demand side flexibility and the optimum operation of DER and other resources within the network while maintaining second-to-second power balance and the ...
Voir le projet

 9

 TERMINÉ 

ADVanced communicAtions and iNformaTion processing in smArt Grid systEms (ADVANTAGE)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2017,

"Smart Grid systems represent a significant new technology to provide more energy efficient power delivery systems that reduce carbon emissions and can handle a mix of energy sources from small scale renewable energy to large power stations. The design and implementation of the smart grid will be very complex, involving a large number of systems, layers and relationships. In order to make the infr ...
Voir le projet

 8

 TERMINÉ 
The overall objective of Flex5Gware is to deliver highly reconfigurable hardware (HW) platforms together with HW-agnostic software (SW) platforms targeting both network elements and devices and taking into account increased capacity, reduced energy footprint, as well as scalability and modularity, to enable a smooth transition from 4G mobile wireless systems to 5G.As it will be argued in the propo ...
Voir le projet

 19

 TERMINÉ 
5G will have to cope with a high degree of heterogeneity in terms of: (a) services (mobile broadband, massive machine and mission critical communications, broad-/multicast services and vehicular communications); (b) device classes (low-end sensors to high-end tablets); (c) deployment types (macro and small cells); (d) environments (low-density to ultra-dense urban); (e) mobility levels (static to ...
Voir le projet

 18

 TERMINÉ 
There is a currently increasing interest for broadband mobile satellite communications that can fulfil the Digital Agenda 2020 objective for fast Internet everywhere. Furthermore,European regulators have recently agreed to harmonize the spectrum for Earth Stations on Mobile Platforms that will use parts of the Ka-Band (17-30 GHz). Operators such as Inmarsat are planning to launch Ka-Band broadband ...
Voir le projet

 1

 TERMINÉ 

Advanced PRocedures for volcanIc and Seismic Monitoring (APHORISM)

Date du début: 1 déc. 2013, Date de fin: 30 nov. 2016,

APHORISM project proposes the development and testing of two new methods to combine Earth Observation satellite data from different sensors, and ground data. The aim is to demonstrate that this two types of data, appropriately managed and integrated, can provide new improved Copernicus products useful for seismic and volcanic crisis management.The first method, APE – A Priori information for Earth ...
Voir le projet

 7

 TERMINÉ 

COnvergence of fixed and Mobile BrOadband access/aggregation networks (COMBO)

Date du début: 1 janv. 2013, Date de fin: 30 sept. 2016,

Fixed and mobile networks have been subjects to significant technological and architectural evolutions in the past years, with e.g. deployments of 4G mobile networks and FTTH fixed networks, as well as significant increase in traffic demand and access bandwidth both in fixed and mobile access networks. All these network evolutions lead to enormous investments in independent network infrastructures ...
Voir le projet

 20

 TERMINÉ 

COgnitive & Perceptive CAMeraS (COPCAMS)

Date du début: 1 avr. 2013, Date de fin: 30 sept. 2016,

Vision systems are becoming ubiquitous in our daily lives. Complex analysis of images from multiple cameras will become the norm in the future, from cars to industrial systems, from smart cities to facility monitoring, aimed at extracting meaningful, context-dependent information.Today’s market is dominated by a combination of relatively simple, fixed function, configurable cameras that stream vid ...
Voir le projet

 25

 TERMINÉ 
The STRAUSS project aims to define a highly efficient and global (multi-domain) optical infrastructure for Ethernet transport, covering heterogeneous transport and network control plane technologies, enabling an Ethernet ecosystem. It will design, implement and evaluate, via large-scale demonstrations, an advanced optical Ethernet transport architecture. The proposed architecture leverages on soft ...
Voir le projet

 6

 TERMINÉ 

Environmental Sensors for Energy Efficiency (ESEE)

Date du début: 1 avr. 2013, Date de fin: 31 mars 2016,

ESEE – Environment Sensors for Energy Efficiency targets the markets, were with highly reliable information regarding environmental conditions measures can be deducted, which safe the use of energy. The research will be performed on several different sensor technoglogy approaches and finally validated in a test environment, e.g. under the environmental conditions of an aircraft. In addition an app ...
Voir le projet

 27

 TERMINÉ 

Enhanced GNSS-BF-INS Solution for Un-manned Vehicle Control (GINSEC)

Date du début: 1 oct. 2013, Date de fin: 31 déc. 2015,

The goal of GINSEC is to build a pre-commercial prototype of a low-cost, accurate and reliable naviga-tion system for professional drone market.Consumer-type navigation systems work quite well in general use despite the many practical problems that still affect them. Most noticeable in vehicle navigation are the slow time to first fix (up to a few min-utes), poor or no availability (outages in tun ...
Voir le projet

 8

 TERMINÉ 

Network of Excellence in Wireless COMmunications # (NEWCOM#)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2015,

NEWCOM# is a Network of Excellence (NoE) proposal submitted in response to challenge FP7-ICT-2011-8 1.1, "Future Networks". A group of 14 partners in 14 different countries (12 of which come from the former FP7 NoE NEWCOM++) decided to capitalize on the high degree of integration in research they already at-tained to build an NoE with the following objectives: i) to produce medium to long term res ...
Voir le projet

 18

 TERMINÉ 
Amongst the few distinctive European alliances carrying the promise of making a lasting impact in software-defined networking (SDN) and the IT industry is the research and industrial communities pursuing developments in the Path Computation Element (PCE), an effort "made-in-the-EU". In regards to PCE design, deployment, and evolution, Europeans are amongst today's leaders in the process of transit ...
Voir le projet

 8

 TERMINÉ 

ENERGY TO SMART GRID (E2SG)

Date du début: 1 avr. 2012, Date de fin: 1 mars 2015,

The target of the overall E2SG project is to devise and design mechanisms and policies to assemble, monitor and control smart grids, i.e. a set of interconnected nodes whose primary goal is to generate, exchange and consume electrical energy in the most efficient and reliable way by exploiting distributed information that is sensed, transmitted and processed over the same set of nodes and links. F ...
Voir le projet

 32

 TERMINÉ 
The EMPhAtiC objective is to develop, evaluate and demonstrate the capability of enhanced multicarrier techniques to make better use of the existing radio frequency bands in providing broadband data services in coexistence with narrowband legacy services. The project will address the Professional Mobile Radio (PMR) application, especially the evolution of the Public Protection & Disaster Relief (P ...
Voir le projet

 13

 TERMINÉ 
Converged fiber-wireless (FiWi) access networks may be viewed as the endgame of broadband access. Most of the past layer-2 and layer-3 FiWi research activities have been focusing on cascaded Ethernet passive optical network (EPON) and WLAN-mesh networks, or to a lesser extent also WiMAX. In this proposed research project, we explore new interdisciplinary possibilities and investigate novel ways of ...
Voir le projet

 1

 TERMINÉ 

An early stage training network in enabling technologies for GREEN radio (GREENET)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2014,

Current 4G vision envisages higher data rates and multi standard radio interfaces to provide all users with a continuous seamless connection. The large number of foreseen devices coupled with the surge in power requirements for future emerging handsets raises significant challenges in terms of: i) reducing the energy consumption; and ii) reducing the amount of electromagnetic radiations.GREENET ta ...
Voir le projet

 10

 TERMINÉ 

Symbiotic Wireless Autonomous Powered system (SWAP)

Date du début: 1 août 2010, Date de fin: 31 juil. 2014,

Symbiotic Wireless Autonomous Powered system (SWAP) combines the energy-efficient paradigm of wireless sensor networks with the self-sustainable capabilities of harvesting systems. SWAP aims at providing a novel sensor board consisting of 1) a high efficiency RF transceiver 2) a low power micro controller 3) an energy accumulator 4) modular harvesting systems. To this aim SWAP will study advanced ...
Voir le projet

 4

 TERMINÉ 

Cooperative Multimedia Transmission over Wireless Networks (COOPMEDIA)

Date du début: 1 avr. 2010, Date de fin: 31 mars 2014,

"Future wireless networks will require anytime, anywhere access to high data rate content, such as multimedia, by a growing number of users with an increasing demand for higher quality. Based on heuristics from point-to-point systems, traditional network architectures consist of multiple layers with minimal interaction, each layer taking care of a distinct task such as modulation, routing or error ...
Voir le projet

 1

 TERMINÉ 

Enabling access to geological information in support of GMES (PANGEO)

Date du début: 1 févr. 2011, Date de fin: 31 janv. 2014,

PanGeo is a service proposed in response to FP7 GMES Downstream Call 3 (released July 2009). The objective of PanGeo is to enable free and open access to geohazard information in support of GMES. This will be achieved by the generation of a validated Geohazard Data Layer supported by a Geohazard Summary for 52 of the largest towns listed in the GMES Land Theme’s Urban Atlas involving all 27 coun ...
Voir le projet

 43

 TERMINÉ 
Wireless communications, perpetually a source of innovation, is entering new and uncharted territory. In order to enhance system performance and cater for the services and applications of the future, there is the need for cooperative and cognitive communications paradigms that support advanced coexistence technologies for radio optimization. In short, wireless communications is moving towards a di ...
Voir le projet

 16

 TERMINÉ 

Open Flow in Europe: Linking Infrastructure and Applications (OFELIA)

Date du début: 1 sept. 2010, Date de fin: 31 oct. 2013,

The aim of the OFELIA project is to create a unique experimental facility that allows researchers to not only experiment 'on' a test network but to control the network itself precisely and dynamically. To achieve this, the OFELIA facility is based on OpenFlow, a currently emerging networking technology that allows to virtualize and control the network environment through secure and standardized in ...
Voir le projet

 18

 TERMINÉ 

EXpAnding LTE for Devices (EXALTED)

Date du début: 1 sept. 2010, Date de fin: 28 févr. 2013,

The number of networked humans will reach saturation by the middle of the next decade, while the number of networked devices will continue to increase dramatically for some time to come. The Wireless World Research Forum (WWRF) has set out a vision of the future where 7 trillion wireless devices will be serving 7 billion people by 2017. The vast majority of wireless traffic will be between machine ...
Voir le projet

 16

 TERMINÉ 

Virtualized dIstributed plaTfoRms of smart Objects (VITRO)

Date du début: 1 sept. 2010, Date de fin: 28 févr. 2013,

The quick growth of the Virtual Sensor Networking (VSN) domain has led to a highly dispersed gamut oftechnologies and approaches, which seriously jeopardize the long-term vision of an Internet of Thingssince very few of these solutions are able to mutually communicate. VITRO aims at providing this crucialbut missing link between highly heterogeneous wireless sensors and actuators platforms and hen ...
Voir le projet

 11

 TERMINÉ 
Internet traffic has been growing quickly for many years, despite adverse economic conditions and this growth will continue in the future. To cope with this evolution, the cost of today's network solutions is still too high.In addition, in line with the EC goal of reducing the overall emissions, energy efficiency should be widely improved, using whenever possible optics instead of electronics wher ...
Voir le projet

 19

 TERMINÉ 

Broadband Evolved FEMTO Networks (BeFEMTO)

Date du début: 1 janv. 2010, Date de fin: 31 juil. 2012,

BeFEMTO is a timely proposal to address broadband communications, an important stimulus to the European economy. It aims to research and develop evolved femtocell technologies that accelerate cost-effective provision of ubiquitous broadband services by smoother convergence between fixed and wireless broadband.The approach adopted is pragmatic in two ways: near-term solutions as enabler for early d ...
Voir le projet

 14

 TERMINÉ 

Beyond Next Generation Mobile Broadband (BuNGee)

Date du début: 1 janv. 2010, Date de fin: 30 juin 2012,

An IMT-Advanced key requirement for next generation systems is the support for unprecedentedly high throughputs per user.This implies an infrastructure –composed of access and backhaul network–capable of supporting the resulting high capacity densities.The current next-generation technologies LTE and WiMAX support a mere 100Mbps/Km2 in ordinary cellular deployment.This is insufficient, in particul ...
Voir le projet

 9

 TERMINÉ 

Guardian Angels for a Smarter Life (Guardian Angels)

Date du début: 1 mai 2011, Date de fin: 30 avr. 2012,

Guardian Angels (GA) are future zero-power, intelligent, autonomous systems-of-systems featuring sensing, computation, and communication beyond human aptitudes. GA will assist humans from their infancy to old age in complex life situations and environments. Zero-power reflects system-of-systems ability to scavenge energy in dynamic environments by disruptive harvesting techniques. The project prep ...
Voir le projet

 34

 TERMINÉ 

NEtwork of Excellence in Wireless COMmunications++ (NEWCOM++) (NEWCOM++)

Date du début: 1 janv. 2008, Date de fin: 30 avr. 2011,

NEWCOM++ is the acronym of a proposed Network of Excellence in Wireless COMmunications, submitted to Call 1 of the VII Framework Programme under the Objective ICT-2007.1.1: The Network of the Future, mainly in its target direction "Ubiquitous network infrastructure and architectures". The current proposal draws inspiration, shape/form, and substantive direction from its successful predecessor, t ...
Voir le projet

 35

 TERMINÉ 

Building the Future Optical Network in Europe: The e-Photon/ONe Network (BONE)

Date du début: 1 janv. 2008, Date de fin: 28 févr. 2011,

...of the BONE-project is the stimulation of intensified collaboration, exchange of researchers and integration of activities and know-how into and amongst partners. Through the establishment of Virtual Centres of Excellence, the BONE-project looks into the future and builds and supports the final “Network of the Future” through education & training, research tools & testlabs on new technologies & ar ...
Voir le projet

 53

 TERMINÉ 

Physical layer for dynamic spectrum access and cognitive radio (PHYDYAS)

Date du début: 1 janv. 2008, Date de fin: 31 oct. 2010,

PHYDYAS proposes an advanced physical layer, using filter bank-based multicarrier (FBMC) transmission, for the new concepts in radiocommunications: dynamic access spectrum management (DASM) and cognitive radio. It shows that the performance and operational flexibility of systems are enhanced by exploiting the spectral efficiency of filter banks and the independence of sub-channels. Combining wit ...
Voir le projet

 13

 TERMINÉ 
The DaVinci project aims at developing new technologies targeting future B3G or 4G wireless broadband transmission systems such as IEEE 802.16e/m, or 3GPP-LTE. It is well known that the increase in data rate and heterogeneous transport in wireless networks demands very efficient coding schemes, coupled with adaptive resource allocation strategies. Beside the recent progress made these last 15 year ...
Voir le projet

 8