Rechercher des projets européens

25 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The DROPSA consortium will create new knowledge and understanding of the damage and losses of fruit crops resulting from pests and pathogens, with a specific focus on the new and emerging threats due to Drosophila suzukii and quarantine pathogens Pseudomonas syringae, Xanthomonas fragariae and X. arboricola. The project will deliver a cost effective approach that can be widely implemented by the E ...
Voir le projet

 27

 TERMINÉ 
TRANSMANGO aims to obtain a comprehensive picture of the effects of the global drivers of change (climate, economic concentration and market structure, financial power, resource competition, marginalization, property rules, geo-political shifts, consumer preferences, consumption patterns and nutritional transition) on European and global food demand and on raw material production (and, consequent ...
Voir le projet

 13

 TERMINÉ 
"The factors affecting the establishment success of introduced populations (be them accidently introduced noxious species or purposely introduced beneficial species) are still poorly understood. Investigating these factors (demographic, genetic, and environmental) requires experimental approaches, in which factors can be manipulated and isolated. Biological control is a particularly appropriate mo ...
Voir le projet

 2

 TERMINÉ 
Europe has invoked the SET-Plan to design and implement an energy technology policy for Europe to accelerate the development and deployment of cost-effective renewable energy systems, including photovoltaics. With lower cost of solar electricity, PV could significantly contribute to the achievements of the 20-20-20 objectives.The Joint Program on PV of the European Energy Research Alliance (EERA-P ...
Voir le projet

 37

 TERMINÉ 

Distributed REal-Time Architecture for Mixed Criticality Systems (DREAMS)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

The objective of DREAMS is to develop a cross-domain architecture and design tools for networked complex systems where application subsystems of different criticality, executing on networked multi-core chips, are supported.DREAMS will deliver architectural concepts, meta-models, virtualization technologies, model-driven development methods, tools, adaptation strategies and validation, verification ...
Voir le projet

 16

 TERMINÉ 

Preparing ESNII for HORIZON 2020 (ESNII plus)

Date du début: 1 sept. 2013, Date de fin: 31 août 2017,

Preparing ESNII for HORIZON 2020The aim of this cross-cutting project is to develop a broad strategic approach to advanced fission systems in Europe in support of the European Sustainable Industrial Initiative (ESNII) within the SET-Plan. The project aims to prepare ESNII structuration and deployment strategy, to ensure efficient European coordinated research on Reactor Safety for the next generat ...
Voir le projet

 37

 TERMINÉ 
The management of crisis is one of the great challenges of the 21st century. The ever growing human, economic and environmental losses due to natural and man-made disasters evidence the need for a systematic approach to the management of crisis. A multi-disciplinary understanding and disaster risk management is required. In such situations, Collaborative Crisis Management (CCM) is usually coordina ...
Voir le projet

 18

 TERMINÉ 
High efficient energy conversion concept based on the integration of energy recovery devices, energy storage and engine auxiliaries electrification on a Natural Gas heavy duty engine.The energy recovery strategy is based on two mainstreams:• recovery of a portion of the kinetic energy thanks to the adoption of a belt driven generator• recovery of the waste heat with an energy cascading approach: t ...
Voir le projet

 6

 TERMINÉ 
Description BeyondSilos enables delivery of integrated care to older Europeans to support them to live independently within the community by providing the ICT tools necessary to join up care pathways across organisations, in particular between social and health service providers. A key area of integration is providing cross-sectoral teams wi ...
Voir le projet

 16

 TERMINÉ 

Integrated Reconfigurable silicon photonic based optical Switch (IRIS)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

IRIS aims at fabricating a highly integrated, scalable, transparent and high capacity WDM Photonic Switch used as an Transponder Aggregator (TPA),a novel function which will be added to existing ROADM nodes without disrupting their architecture while adding attributes such as colourless, directionless and contentionless. For Metro networks, this switch will provide flexibility, energy efficiency, ...
Voir le projet

 8

 TERMINÉ 
The eTOX consortium proposes to develop innovative methodological strategies and novel software tools to better predict the toxicological profiles of new molecular entities in early stages of the drug development pipeline. This will be achieved by coordinating the efforts of specialists from academia and SMEs in the wide scope of disciplines that are required to move towards a more reliable modell ...
Voir le projet

 30

 TERMINÉ 
The SITOGA project will address for the first time the integration of transition metal oxides (TMO) materials in silicon photonics and CMOS electronics. TMOs have unique electro-optical properties that will offer unprecedented and novel capabilities to the silicon platform. SITOGA will focus on two disruptive TMO materials, barium titanate (BaTiO3) and vanadium oxide (VO2), for developing advanced ...
Voir le projet

 8

 TERMINÉ 

VINEyardROBOT (VINEROBOT)

Date du début: 1 déc. 2013, Date de fin: 30 nov. 2016,

The aim of this project is the design, development, and deployment of a novel use-case agricultural robot under the scope of Unmanned Ground Vehicles (UGV), and equipped with several non-invasive sensing technologies to monitor: 1) of grape yield, 2) vegetative growth, 3) Water stress and 4) Grape composition in order to optimize the vineyard management and improve grape composition and wine quali ...
Voir le projet

 8

 TERMINÉ 

Capability as a Service in digital enterprises (CaaS)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

An enterprises's capabilities is one factor that often determines competitive advantage and provides business value. Capabilities refer to essential functions of the enterprise that link business goals to business processes, resources and actors. These capabilities are mapped onto IT solutions, such as software services, that are delivered to customers. Aligning an enterprise's capabilities to it ...
Voir le projet

 11

 TERMINÉ 

Technology Transfer in Computing Systems (TETRACOM)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

The mission of the TETRACOM Coordination Action is to boost European academia-to-industry technology transfer (TT) in all domains of Computing Systems. While many other European and national initiatives focus on training of entrepreneurs and support for start-up companies, the key differentiator of TETRACOM is a novel instrument called Technology Transfer Project (TTP). TTPs help to lower the barr ...
Voir le projet

 33

 TERMINÉ 

European Multiple MOOC Aggregator (EMMA)

Date du début: 1 févr. 2014, Date de fin: 31 juil. 2016,

The objective of this proposal is to pilot a number of trusted elements to put in place a unique platform to support ICT-based innovation in higher education and training approaches, thus scaling up existing trials and translation solutions. Validation and evaluation processes will also be tested during the pilot. Emma aims to showcase excellence in innovative teaching methodologies and learning a ...
Voir le projet

 11

 TERMINÉ 
Dorothy Project is targeted to develop the potential of innovation and research in the four Regions Tuscany (Italy),Valencia (Spain),Lisbon and Tagus (Portugal) and Oltenia (Romania) composing the Consortium in the field of Urban Logistics, one of the main focus of attention of the Flagship Initiative. In fact UL could reach 40% of the total cost of transportation and has great relevancy for ener ...
Voir le projet

 26

 TERMINÉ 

make it ReAAL (ReAAL)

Date du début: 16 janv. 2013, Date de fin: 30 juin 2016,

Description In the last decade numerous dedicated ICT solutions have been developed to deliver services in support of sustainable independent living and the promotion of active ageing of older people. The research community has spent a lot of resources developing personalised solutions covering the different perspectives of the problem - soc ...
Voir le projet

 20

 TERMINÉ 
The EUBrazilCC project is a first step towards providing a user-centric, cross-Atlantic test bench for European & Brazilian research communities. EUBrazilCC is centred in practical scientific use cases, and it is built on a close collaboration among European & Brazilian excellence centres. EUBrazilCC will exploit & coordinate, in a 2 year project, existing heterogeneous e-Infrastructures (virtuali ...
Voir le projet

 7

 TERMINÉ 

Future media Internet for large scale CONTENT experimentation 2 (FI-CONTENT 2)

Date du début: 1 avr. 2013, Date de fin: 31 oct. 2015,

The FI-CONTENT 2 project aims at establishing the foundation of a European infrastructure for promoting and testing novel uses of audio-visual content on connected devices. The partners will develop and deploy advanced platforms for Social Connected TV, Mobile Smart City services, and Gaming/ Virtual worlds. To assess the approach and improve these platforms, user communities in 6 European locatio ...
Voir le projet

 31

 TERMINÉ 

PHOTONICS FRONT-END FOR NEXT-GENERATION SAR APPLICATIONS (GAIA)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2015,

The evolution of SAR has shown a clear trend towards higher performance at lower cost, less mass, size and power consumption imposing strong requirements in the today’s antenna technology since larger antennas means complex, bulky, difficult to route RF harness, and strong mechanical and thermal requirements for in-orbit deployable antennas. Larger bandwidths associated with larger antennas and sc ...
Voir le projet

 5

 TERMINÉ 
Addressing IT skills for healthcare workforce is seen as an important element of achieving greater social inclusion as identified in EU and National policy areas. Digital skills offer a gateway to supportive networks, expert patient groups, advice, information and new learning opportunities, social networks and more. Providing the means and the guidelines of sharing, re-using, and repurposing tech ...
Voir le projet

 4

 TERMINÉ 

Future Internet Technologies for MANufacturing (FITMAN)

Date du début: 1 avr. 2013, Date de fin: 30 sept. 2015,

According to the 2010 EC Competitiveness Report, Manufacturing is still the driving force of Europe's economy, contributing over € 6553 billion in GDP and providing more than 30 million jobs. It covers more than 25 different industrial sectors, largely dominated by SMEs, and generates annually over € 1535 billion (42%) worth of value added services.The mission of the FITMAN (Future Internet Techno ...
Voir le projet

 41

 TERMINÉ 
"Specific interactions between drugs and biomolecules are fundamental to many biological processes. It is well known that biomolecules can undergo extensive changes upon irradiation in the presence of drugs, which can behave as photosensitizers leading to adverse side-effects (e. g., to a loss of their biological function). Thus, protein-protein photocrosslinking, or drug-protein photobinding orig ...
Voir le projet

 1

 TERMINÉ 
"Besides the European Global Energy Policy, the European Council adopted an action plan that covers nuclear technologies and supports research in order to ""further improve nuclear safety and the management of radioactive waste"". To obtain a more efficient and sustainable management of radioactive waste and hence reduce the burden on geological storage, one can apply partitioning and transmutatio ...
Voir le projet

 20