Rechercher des projets européens

23 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The objective is to provide a novel methodology and a comprehensive ICT solution for collaborative design of product-services (Meta Products) and their production processes. The effective extension of products with new services in different sectors (automotive, home appliances, automation equipment etc.) will be achieved by means of Ambient Intelligence (AmI) technology, Lean and Eco-design princi ...
Voir le projet

 16

 TERMINÉ 

Innovative risk-based tools for ship safety inspection (SAFEPEC)

Date du début: 1 oct. 2014, Date de fin: 30 sept. 2017,

"Ships are subject to inspections from different stakeholders, such as port states, classification societies, ship owners, managers and operators, among others. Each one has its own inspection method depending upon its role in the vessel operation. Consequently, all inspections monitor the ship condition and report respective data. However no means exist today to inter-relate the data which are sy ...
Voir le projet

 9

 TERMINÉ 

Integrated Macro-Financial Modelling for Robust Policy Design (MACFINROBODS)

Date du début: 1 mai 2014, Date de fin: 30 avr. 2017,

...inancial crisis and ensuing Great Recession, economists at policy-making institutions had little choice but to augment macroeconomic models with ad-hoc assumptions and adjustments in order to provide analysis and advice for policy makers. Our consortium’s proposal aims to move policy-focused macroeconomic modelling beyond this approach to the endogenous modelling of the dynamics resulting from fin ...
Voir le projet

 12

 TERMINÉ 

Arrowhead (ARROWHEAD)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

...vations thanks to new services,-Lead the way to further standardization work.The strategy adopted in the project has four major dimensions:-An innovation strategy based on business and technology gap analysis paired with a market implementation strategy based on end users priorities and long term technology strategies-Application pilots where technology demonstrations in real working environments ...
Voir le projet

 87

 TERMINÉ 
... orientation, taking advantage of recycled materials and biomass foams, low energy and low toxicity processes. Finally, project viability and sustainability will be ensured by performing a Life Cycle Analysis in order to optimize individual processes. Hygrothermal behaviour and thermodynamics will also be simulated and modelled to ensure the high performance of the panel.The project’s advancements ...
Voir le projet

 10

 TERMINÉ 

A common European approach to the regulatory testing of nanomaterials (NANOREG)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

...ong term, new testing strategies adapted to innovation requirements, (iv) Establish a close collaboration among authorities, industry and science leading to efficient and practically applicable risk management approaches for MNMs and products containing MNMs.The interdisciplinary approach involving the three main stakeholders (Regulation, Industry and Science) will significantly contribute to redu ...
Voir le projet

 73

 TERMINÉ 
...e. These forecasts hold the potential for being of great value for a wide range of decision-makers who are affected by the vagaries of the climate and who would benefit from understanding and better managing climate-related risks. However, such climate information is currently under-used, mis-used, or not used at all. Therefore there exists the opportunity to develop new technologies to properly ...
Voir le projet

 26

 TERMINÉ 
... the quality of waste water discharged from these industries to the environment. But treating wastewater is expensive. The smaller the company is, the more expensive it is to treat 1m3 of wastewater. Anaerobic treatment is an eco-efficient solution: biogas can be transformed at the Food & Drink industries in electricity and heat. Current anaerobic reactors available in the market are good but they ...
Voir le projet

 8

 TERMINÉ 

Policy Compass

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

...s and graphs of historical data from trusted open data sources. The aim is to develop methods and tools that facilitate more factual, evidence-based, transparent and accountable policy evaluation and analysis.The research question we want to address in the Policy Compass project is whether and how open public data, social media, e-participation platforms, fuzzy cognitive maps and argumentation tec ...
Voir le projet

 7

 TERMINÉ 

Preparing NUGENIA for HORIZON2020 (NUGENIA-PLUS)

Date du début: 1 sept. 2013, Date de fin: 30 sept. 2016,

...oordination and Support Action and the second part a Collaborative Project. The aim of the first part, the Coordination and Support Action, is to establish an efficient, transparent and high quality management structure to carry out the planning and management of R&D including project calls, proposal evaluation, project follow-up dissemination and valorisation of R&D results in the area of safety ...
Voir le projet

 52

 TERMINÉ 
"The MAPICC 3D project and concept aims at developing manufacturing system for 3D shaped, multilayered products based on flexible materials. The ultimate goals are:> The development of integrated and automated process chain able to produce from hybrid thermoplastic yarn to 3D complex shaped thermoplastic composite structure in single step thermoplastic consolidation process.> The development of fl ...
Voir le projet

 21

 TERMINÉ 
Insights gained in FI-PPP Phase 1 emphasize the need for novel ICT solutions that allow radical improvements for collaboration in business networks. Primary sectors demanding such solutions are Agri-Food and Transport & Logistics industries: several actors (incl. enterprises, authorities, service providers) need to exchange information & communicate across org. borders to conduct business. Current ...
Voir le projet

 39

 TERMINÉ 

Minerals Intelligence Network for Europe (MINERALS4EU)

Date du début: 1 sept. 2013, Date de fin: 31 août 2015,

The Minerals4EU project is designed to meet the recommendations of the Raw Materials Initiative and will develop an EU Mineral intelligence network structure delivering a web portal, a European Minerals Yearbook and foresight studies. The network will provide data, information and knowledge on mineral resources around Europe, based on an accepted business model, making a fundamental contribution t ...
Voir le projet

 32

 TERMINÉ 

EERA Design Tools for Offshore Wind Farm Cluster (EERA-DTOC)

Date du début: 1 janv. 2012, Date de fin: 30 juin 2015,

The European Energy Research Alliance (EERA) together with some high-impact industry partners addresses the call proposing an integrated and validated design tool combining the state-of-the-art wake, yield and electrical models available in the consortium, as a plug-in architecture with possibility for third party models. To decrease uncertainties around wind farm wake predictions, a small measur ...
Voir le projet

 23

 TERMINÉ 

My Neighbourhood | My City (My Neighbourhood)

Date du début: 1 janv. 2013, Date de fin: 30 juin 2015,

The My Neighbourhood solution will combine new digital technologies and techniques, such as social gaming principles (gamification), with the Living Lab methodology to help strengthen existing ties and resolve communal issues in the real, day-to-day world of the neighbourhood. The solution will be rooted in an open My Neighbourhood site that 1) combines the data and functionality of existing City ...
Voir le projet

 16

 TERMINÉ 
ISA-Pack will develop a flexible sustainable, active and intelligent technology platform for the packaging of fresh food produce, targeting extended shelf life and quality, enhanced safety and reduced food and packaging waste. Whilst suitable for a wide range of foods, ISA-Pack will validate the resulting materials and technologies for modified atmosphere and stretch wrap packaging of fresh beef s ...
Voir le projet

 10

 TERMINÉ 
...al importance for their survival as photoinhibition reduces the amount of photosynthetically fixed carbon made available to the animal host and damage the photosynthetic apparatus in the chloroplast. Anatomical and behavioural traits can also enhance the performance and functional longevity of chloroplasts in different light regimes. This adaptation would be functionally equivalent to chloroplast ...
Voir le projet

 1

 TERMINÉ 

Tomorrow's Road Infrastructure Monitoring and Management (TRIMM)

Date du début: 1 déc. 2011, Date de fin: 30 nov. 2014,

Problem descriptionEffective, fair and sustainable road management require streamlined objective and up to date information. Advances in a range of sensing technologies and information processing have built up a potential for implementing new monitoring techniques that deliver key information for road management. The traditional monitoring techniques suffer for example in cost efficiency, time and ...
Voir le projet

 16

 TERMINÉ 
"The main goal of PROSUITE is to develop a framework methodology, operational methods and tools for the sustainability assessment of current and future technologies over their life cycle, applicable to different stages of maturity. The project will apply the methodology for four technology cases with close consultation of the stakeholders involved, which includes cases from biorefineries, nanotech ...
Voir le projet

 25

 TERMINÉ 

Overcome failure to Publish nEgative fiNdings (OPEN)

Date du début: 1 nov. 2011, Date de fin: 31 oct. 2013,

...re, with emphasis on the situation in the EU.OPEN focuses on the investigation of attitudes and handling of stakeholders involved in the whole knowledge translation process. Surveys, case studies and analyses of policies to reduce publication bias will be conducted to describe the current views and practice of stakeholders who are involved in knowledge translation. These results will be brought to ...
Voir le projet

 11

 TERMINÉ 
...re survey, naturalistic observations, and in-depth observations. The purpose of this combined approach is to gather self-reported and observed driver behaviour data and qualitative and quantitative analysis. The target impacts will be the reduction of the risks of systems misuses and of possible human error by drivers. Thus, it will increase the global benefits of in vehicle technology in enhanci ...
Voir le projet

 13

 TERMINÉ 
... dissemination actions, workshops, Conferences;o\tProduce dissemination material.Grid Services for VRCs will be provided by CLARA on the basis of a business plan using a Life Cycle Product Management (LCPM) approach.
Voir le projet

 31

 TERMINÉ 

Northern Seas Wind Index Database (NORSEWIND)

Date du début: 1 août 2008, Date de fin: 31 juil. 2012,

NORSEWInD is a programme designed to provide a wind resource map covering the Baltic, Irish and North Sea areas. The project will acquire highly accurate, cost effective, physical data using a combination of traditional Meteorological masts, ground based remote sensing instruments (LiDAR & SoDAR) and Satellite acquired SAR winds.The vertical resolution of the ground based instruments will be used ...
Voir le projet

 21