Rechercher des projets européens

16 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Liver cirrhosis is a very common chronic disease and one of the leading causes of death in European. Moreover, cirrhosis has a marked impact in patients quality of life and represents a major burden for health systems. Treatment of cirrhosis is currently based on symptomatic management of complications and has not changed substantially in the last 20 years. There is an unmet need for therapies tha ...
Voir le projet

 18

 TERMINÉ 

Doppelte Qualifizierung = doppelte Chancen

Date du début: 31 déc. 2015, Date de fin: 30 déc. 2019,

Description (EN): Starting with four professions, the project´s aim is to identify commons and differences of each country´s regulations. In a second step additional training units will be designed which, having attended, can compensate missing elements of vocational education of one country. Having run through both an apprenticeship following national rules plus additional training ...
Voir le projet

 2

 TERMINÉ 
The ModLife project is a European Training Network initiative that brings together 5 leading European universities, 4 global industrial players and 2 SMEs to undertake research and training in the area of product-process innovation, optimization monitoring and control for life sciences and biotechnology industries. Modlife aims to develop Advanced Model-Based Optimization, Monitoring and Control a ...
Voir le projet

 10

 TERMINÉ 

PROcessing Diluted Aqueous Systems (PRODIAS)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2018,

The use of renewable resources in the process industries is socially desirable and a market pull for products has started to develop in recent years, but renewable products have to compete with identical or similar-in-application products based on fossil raw materials in terms of quality and production cost. One of the main reasons for currently higher production costs of products based on renewab ...
Voir le projet

 11

 TERMINÉ 
Industrial robots have demonstrated their capacity to answer the needs of many industrial applications, offering a high degree of dexterity, accuracy and efficiency.However, when the application requires the collaboration between the robot and the worker, including workspace sharing, it is not feasible to use standard industrial robots due to safety being compromised Recently, new robotic products ...
Voir le projet

 16

 TERMINÉ 
NanoSelect aims to design, develop and optimize novel bio-based foams/filters/membranes/adsorbent materials with high and specific selectivity using nanocellulose/nanochitin and combinations thereof for decentralized industrial and domestic water treatment. NanoSelect proposes a novel water purification approach combining the physical filtration process and the adsorption process exploring the cap ...
Voir le projet

 13

 TERMINÉ 

Human Factors in Risk-Based Ship Design Methodology (FAROS)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2015,

Up to 96% of maritime accidents (collision, grounding, fire, occupational accidents) are routinely attributed to human error. However, rather than assessing the ship performance in terms of global design factors such as ship motions and noise, the human element studies have primarily focused on local design features (e.g., bridge design) that are relatively easy to fix and tune towards required ef ...
Voir le projet

 15

 TERMINÉ 

Healthy Lifestyle Hospitality (Healthy Lifestyle Hospitality - III-3-01=047.242)

Date du début: 31 janv. 2013, Date de fin: 31 déc. 2013,

Een belangrijk aandachtspunt in de vergroting van die kwaliteit is Vrijetijdseconomie. Hier wordt het in een ruimer “Healthy Lifestyle Hospitality” perspectief geplaatst. Het innovatieve karakter komt vooral tot uitdrukking door nieuwe combinaties van onder meer horeca, kunst en cultuur, sport en de gezondheidszorg. Momenteel zijn de genoemde branches veelal nog op zichzelf staande sectoren. In D ...
Voir le projet

 1

 TERMINÉ 

Multiscale Modeling of Chemical and Biochemical Systems (MULTIMOD)

Date du début: 15 déc. 2009, Date de fin: 14 déc. 2013,

"The MULTIMOD Training Network will have duration of 48 months and will bring together 8 academic research groups with 5 industrial partners from 8 European countries to undertake innovative research and scientific research training in “Multi-Scale Computational Modeling of Chemical and Biochemical Systems”. The network will provide unique cross- and multi-disciplinary training opportunities for 1 ...
Voir le projet

 13

 TERMINÉ 
Main aim of the ICTs for SMEs project was the strengthening of the region by spatial and structural changes in order to form a balanced region. The tools to reach this aim were Information and Communication Technologies (ICT). The project worked towards enhancing the implementation and usage of ICT in SMEs. In particular the formation of a SME support structure was an important aim of the project. ...
Voir le projet

 18

 TERMINÉ 
The reason for this multinational project was the development of regional competitiveness. Global market economy and aging population affect European societies. Low skills level and lack of appropriate education and training maintain weak competitiveness in many regions and countries. In the participating regions, there was/is a need for a competent and skilled workforce, and for stronger role of ...
Voir le projet

 5

 TERMINÉ 
This project aims to develop and deliver an international curriculum at the graduate certificate level,accredited in Australia, with the potential to also gain accreditation in the European Union (EU). This projectwill focus on hospitality students who have completed either a vocational or higher education qualification andwould like to continue to study at a higher level and gain an international ...
Voir le projet

 6

 TERMINÉ 
We have seen the intrinsic potential of Lean and we recommend VET organizations to work with Lean implementation from the co-workers and the management perspective when it comes to: Lean tools, a common and visual system of working with Lean and Culture. Lean tools: The management has of course the over-all responsibility for getting a Lean implementation started and has to work actively to keep t ...
Voir le projet

 5

 TERMINÉ 
Learning the language of logistics : Teaching international logistics in several European languages This project started in 2001 and lasted 30 months.
Voir le projet

 15

 TERMINÉ 
Industry-wide qualification in the EU : The international BASICON project is developing pan-European coordinated instruments for qualification as well as for the determination and comparison of existing qualifications in seven languages. This project started in 2000 and lasted 36 months.
Voir le projet

 30

 TERMINÉ 
The project sets out to reduce dropout rates in schools and colleges through improving the guidance offered to students and through creating a more attractive learning environment. The project attempts to bring together aspects of education and VET with the social work goals aimed at student welfare and further intends to integrate the existing knowledge and expertise from a range of institutions ...
Voir le projet

 20