Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

PROMOTioN - Progress on Meshed HVDC Offshore Transmission Networks (PROMOTION)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

In order to unlock the full potential of Europe’s offshore resources, network infrastructure is urgently required, linking off-shore wind parks and on-shore grids in different countries. HVDC technology is envisaged but the deployment of meshed HVDC offshore grids is currently hindered by the high cost of converter technology, lack of experience with protection systems and fault clearance componen ...
Voir le projet

 35

 TERMINÉ 
...pment (ALTAIR), MIM (OBE), SLM machine manufacturer (EOS). It is completed by 4 end-users from key sectors: Semiconductors and their packaging (III-V LAB), Automotive (CRF), Space (GEMMATE), Railway (ALSTOM).
Voir le projet

 10

 TERMINÉ 

Future Improvement for Energy and Noise (FINE 1)

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

The FINE 1 project aims to reduce operational costs of railways by a reduction of energy use and noise related to rail traffic. The project results are expected to enable an increase of traffic in Europe and to enhance the attractiveness of railway in relation to other modes of transport. The project activities will support the innovation process within the S2R Technical Demonstrators (TDs) by p ...
Voir le projet

 9

 TERMINÉ 

Start-up activities for Advanced Signalling and Automation Systems (X2Rail-1)

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

X2Rail-1 addresses the S2R-CFM-IP2-01-2015 “Start-up activities for Advanced Signalling and Automation System” call issued by the Shift2Rail Joint Undertaking as part of the Innovation Programme 2 “Advanced Traffic Management & Control Systems”.The X2Rail-1 project aims to research and develop six selected key technologies to foster innovations in the field of railway signalling and automation sys ...
Voir le projet

 22

 TERMINÉ 
Embedded systems have significantly increased in technical complexity towards open, interconnected systems. This has exacerbated the problem of ensuring dependability in the presence of human, environmental and technological risks. The rise of complex Cyber-Physical Systems (CPS) has led to many initiatives to promote reuse and automation of labor-intensive activities. Two large-scale projects are ...
Voir le projet

 32

 TERMINÉ 

IP1 Traction TD1 and Brakes TD5 – Phase 1 (PINTA)

Date du début: 1 sept. 2016, Date de fin: 30 nov. 2018,

The PINTA Project (IP1 Traction TD1 and Brakes TD5 – Phase 1) will address the two key topics highlighted in the first Shift2Rail Call topic S2R-CFM-IP1-01-2016 – Development of concepts towards the next generation of traction systems and management of wheel/rail adhesion, namely Traction and Adhesion Management.Traction subproject will focus on the improvement of seven technical and economical pe ...
Voir le projet

 9

 TERMINÉ 
OPTIMISED aims to develop novel methods and tools for deployment of highly optimised and reactive planning systems that incorporate extensive factory modelling and simulation based on empirical data captured using smart embedded sensors and pro-active human-machine interfaces. The impact of energy management on factory planning and optimisation will be specifically assessed and demonstrated to red ...
Voir le projet

 10

 TERMINÉ 
"A group of eight Transmission System Operators with a generator company, manufacturers and research organisations, propose 5 demonstration projects to remove, in 4 years, several barriers which prevent large-scale penetration of renewable electricity production in the European transmission network. The full scale demonstrations led by industry aim at proving the benefits of novel technologies cou ...
Voir le projet

 39

 TERMINÉ 
CONNECTA aims at contributing to the S2R’s next generation of TCMS architectures and components with wireless capabilities as well as to the next generation of electronic braking systems. CONNECTA will conduct research into new technological concepts, standard specifications and architectures for train control and monitoring, with specific applications in train-to-ground communications and high sa ...
Voir le projet

 9

 TERMINÉ 

Innovative Intelligent Rail (IN2RAIL)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

IN2RAIL is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by delivering important building blocks that unlock the innovation potential that exists in SHIFT2RAIL: innovative technologies will be explored and resulting concepts embedded in a systems framework where infrastructure, information management, maintenance techniques, energy, and engineer ...
Voir le projet

 56

 TERMINÉ 
The ROLL2RAIL project aims to develop key technologies and to remove already identified blocking points for radical innovation in the field of railway vehicles, as part of a longer term strategy to revolutionise the rolling stock for the future.The high level objectives of the work are to pave the way to:• Increase the capacity of the railway system and bring flexibility to adapt capacity to deman ...
Voir le projet

 34

 TERMINÉ 
Background Rail transport is often an environmentally friendly option: it is, for example, between three and five times more energy efficient than most road transport. However, there is still room for improvement and rail transport must contribute further to the EU’s effort to reduce CO2 emissions. Thus, one of the principal objectives of European railw ...
Voir le projet

 3

 TERMINÉ 

Critical System Engineering Acceleration (CRYSTAL)

Date du début: 1 mai 2013, Date de fin: 31 juil. 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr ...
Voir le projet

 70

 TERMINÉ 

Future Of Surface Transport Research Rail (FOSTER RAIL)

Date du début: 1 mai 2013, Date de fin: 30 avr. 2016,

FOSTER RAIL addresses the broad support challenges of SST.2013.6-1. Strengthening the research and innovation strategies of the transport industries in Europe. This Research action is a Level 1 Coordination and Support Action aiming at supporting the land transport European Technology Platforms activities.This action will assist ERRAC and the other transport-related European technology platforms ( ...
Voir le projet

 20

 TERMINÉ 
The transportation industry has for a long time been engaged in the application of new lightweight materials for primary structural design in an effort to develop more energy efficient structures to meet low emissions targets without compromising public safety.This is also true for the rail industry, but the implementation of new lightweight materials has been slow mainly due to the lack of suita ...
Voir le projet

 19

 TERMINÉ 
MERLIN’s main aim and purpose is to investigate and demonstrate the viability of an integrated management system to achieve a more sustainable and optimised energy usage in European electric mainline railway systems.MERLIN will provide an integrated optimisation approach that includes multiple elements, dynamic forecasting supply-demand scenarios and cost considerations to support operational deci ...
Voir le projet

 20

 TERMINÉ 

SECurity of Railways against Electromagnetic aTtacks (SECRET)

Date du début: 1 août 2012, Date de fin: 30 nov. 2015,

SECRET addresses the protection of railway infrastructure against EM attacks. Railway infrastructure is an attractive target for EM attacks, because of its familiarity and ease of access, with extended economic and security consequences.Today, the European rail network is evolving to harmonize the management system. This is reflected by new integrated technologies, adequate procedures and centrali ...
Voir le projet

 12

 TERMINÉ 
"The MAPICC 3D project and concept aims at developing manufacturing system for 3D shaped, multilayered products based on flexible materials. The ultimate goals are:> The development of integrated and automated process chain able to produce from hybrid thermoplastic yarn to 3D complex shaped thermoplastic composite structure in single step thermoplastic consolidation process.> The development of fl ...
Voir le projet

 21

 TERMINÉ 

Eddy CUrrent Brake Compatibility (ECUC)

Date du début: 1 sept. 2012, Date de fin: 31 août 2015,

...s the terms safety, interoperability and economy, and is addressed to the main stakeholders in the European railway industry. The medium-sized ECUC consortium is formed by CEIT (S), KNORR-BREMSE (D), ALSTOM (F), SNCF (F), DEUTSCHE BAHN (D), NETWORK RAIL (UK), UNIFE (B) and FRAUSCHER (AUT). The proposal describes the consortium's strategy in order to guarantee highly efficient coordination. This al ...
Voir le projet

 9

 TERMINÉ 

Open Platform for EvolutioNary Certification Of Safety-critical Systems (OPENCOSS)

Date du début: 1 oct. 2011, Date de fin: 31 mars 2015,

Safety assurance and certification are amongst the most expensive and time-consuming tasks in the development of safety-critical embedded systems. European innovation and productivity in this market is curtailed by the lack of affordable (re)certification approaches. Major problems arise when evolutions to a system entail reconstruction of the entire body of certification arguments and evidence. F ...
Voir le projet

 21

 TERMINÉ 
"For many transport modes, energy reduction strategies can be effectively formulated at the level of the vehicle or vessel. New technologies can therefore be introduced to a vehicle and the direct energy savings can be readily quantified. However, such approach is not suitable to be employed for urban rail, where it is not sufficient to consider only the energy performance of vehicles; the energy ...
Voir le projet

 18

 TERMINÉ 
ACOUTRAIN will simplify and improve the acoustic certification process of new rolling stock, in particular relating to the TSI Noise. Today the need of conformity assessment for a new vehicle according to the TSI Noise represents a significant element of both cost and time to market due to the need to carry out expensive and time consuming tests. The goal of the proposed project is to speed up the ...
Voir le projet

 15

 TERMINÉ 

Combined Model-based Analysis and Testing of Embedded Systems (MBAT)

Date du début: 1 nov. 2011, Date de fin: 31 déc. 2014,

"One of the most important strategic sectors in which Europe is developing, integrating and delivering high-quality products is the transportation domain. Here, high-class safety-related products as e.g. airplanes, cars and trains have a huge market impact. More and more of the market value of these vehicles is gained by embedded systems inside these products, and the number and importance of thes ...
Voir le projet

 42

 TERMINÉ 

European Railway Electromagnetic Compatibility (EUREMCO)

Date du début: 1 oct. 2011, Date de fin: 31 déc. 2014,

The current authorisation process for placing into service rail vehicles according to Technical Specifications for Interoperability and national safety rules is a very long and costly process. The Technical Specifications for Interoperability (TSI) provide common regulations for the placing in service of rail vehicle, when such common understanding and harmonized rules exist. This is not the case ...
Voir le projet

 19

 TERMINÉ 
...s with internationally leading expertise in formal verification and simulation tools. Systerel and the Univs. of Düsseldorf and Southampton will lead the development of novel methods and tools while Alstom and Critical Software will apply these to the engineering of intelligent transport and energy systems. Selex ES, as the end user of the energy system development, will bring industrial and comme ...
Voir le projet

 7

 TERMINÉ 

Secured Urban Transportation - European Demonstration (SECUR-ED)

Date du début: 1 avr. 2011, Date de fin: 30 sept. 2014,

"SECUR-ED Project federates, with a delegated management and in a balanced manner, major operators and top industrial integrators to enhance the security of urban public transportation in medium and large cities, through live demonstrations.Based on the best practices, in a very diverse societal and legacy environment, SECUR-ED will aggregate a consistent and interoperable mix of technologies and ...
Voir le projet

 44

 TERMINÉ 

Make Rail The Hope for protecting Nature (MARATHON)

Date du début: 1 avr. 2011, Date de fin: 30 sept. 2014,

MARATHON aims at extracting the maximum productivity from the existing rail infrastructure for producing efficiency, reducing operating costs and attracting new traffic to rail.This represents a market requirement for producing efficiency, reducing operating costs and attracting new traffic to rail. In fact, due to its fragmentation, the railway system efficiency is created through harmonisation a ...
Voir le projet

 19

 TERMINÉ 
Facing the problem of enhancing the railway security with a systematic top-down approach (i.e. to search for an all-inclusive solution valid for all the conceivable threat scenarios) is judged by PROTECTRAIL members too ambitious even if it could generate potential economies of scale and effort rationalisation. The proposed PROTECTRAIL approach is therefore to split the problem of making the railw ...
Voir le projet

 31

 TERMINÉ 

EURAXLES: Minimizing the risk of fatigue failure of railway axles (EURAXLES)

Date du début: 1 nov. 2010, Date de fin: 30 avr. 2014,

"EURAXLES is a 3 year R&D project uniting 23 partners across Europe including 6 axle manufacturers, 4 railway operators/IMs, 2 system integrators, 3 technology suppliers, 5 universities, 2 rail sector associations and 1 consulting firm. The consortium is well-positioned to provide a common R&D approach to axle design, protection, inspection and maintenance which will have an impact on standards, r ...
Voir le projet

 24

 TERMINÉ 

Clean European Rail - Diesel (CleanER-D)

Date du début: 1 juin 2009, Date de fin: 31 janv. 2014,

The study of CER, UNIFE, UIC and Euromot of the railway and engine manufacturing industries concluded on a risk of disruptive effect of the NRMM Directive application on the railway diesel vehicle supply market, leading to a possible risk of a partial modal shift from rail to road on regional passenger lines and freight transportation specialized routes, with even foreseeable consequences on the o ...
Voir le projet

 27

 TERMINÉ 

Railway Induced Vibration Abatement Solutions (RIVAS)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2013,

"Ground vibration, effected by rail services, is an important environmental concern, affecting European citizens nearby any rail infrastructure. Surveys show that many Europeans are subjected to annoying levels of feelable vibration and vibration-induced noise. Although solutions are available for track in tunnels, tracks at grade are a much more extensive problem even for vibration-induced noise. ...
Voir le projet

 27

 TERMINÉ 

Innovative Material Synergies & Composite Processing Strategies (IMS&CPS)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2013,

Mutation of transport industry to carbon fibre reinforced polymer (CFRC) is now ineluctable in order to reduce our mobility environmental imprint. This sector is at a turn of its conversion from metal to composite, which should impose a radical rethinking of the whole supply chain. Combined developments of materials and matched processes is the main strategy of IMS&CPS project, only such a concert ...
Voir le projet

 16

 TERMINÉ 
The certification of a rail vehicle according to European regulations, Technical Specifications for Interoperability, European Standards and national safety rules represents a significant element of both vehicle cost and time to market. Indeed, a large part of vehicle certification mandates testing for safety, performance and infrastructure compatibility. The new EN standards together with the CR/ ...
Voir le projet

 23

 TERMINÉ 
A group of 6 Transmission System Operators (Belgium, Denmark, France, Germany The Netherlands and Spain) with 2 generator companies, 5 manufacturers and research organisations, propose 6 demonstration projects to remove, in 3 years, several barriers which prevent the electric system from welcoming more wind electricity, and wind electricity from contributing more to the electric system. The full s ...
Voir le projet

 29

 TERMINÉ 

Transport Fire Safety Engineering in the European Union (TRANSFEU)

Date du début: 1 avr. 2009, Date de fin: 30 nov. 2012,

There is an urgent need to have a confident toxicity measurement methodology that contributes to the existing level of surface transport fire safety, which is the most difficult issue to assess in case of fire. The lack of confidence in the robustness of the existing product toxicity classification forbids its acceptance as a standard which prevent the European industry from common safety rules an ...
Voir le projet

 22

 TERMINÉ 

Modular Urban Transport Safety and Security Analysis (MODSafe)

Date du début: 1 sept. 2008, Date de fin: 31 août 2012,

The European Urban Guided Transport sector (Light rails, Metros, but also Tramways and Regional Commuter trains) is still characterized by a highly diversified landscape of Safety Requirements, Safety Models, Responsibilities, Roles, Safety Approval, Acceptance and Certification Schemes. While a certain convergence in architectures and systems can be observed the safety life cycle still differs f ...
Voir le projet

 22

 TERMINÉ 
"The current interoperability approval process for new High Speed and Conventional railway vehicles in Europe is a very long and costly process. The Technical Specifications for Interoperability provide common regulations for the homologation of new rolling stock but do not directly eliminate the current burdens regarding new vehicle approval on each network. In this context, the pantograph/catena ...
Voir le projet

 16

 TERMINÉ 
"The certification of a rail vehicle according to European regulations, Technical Specifications for Interoperability, European Standards and national safety rules represents a significant element of both vehicle cost and time to market. Indeed, a large part of vehicle certification mandates testing for safety, performance and infrastructure compatibility. AEROTRAIN will help meet the business sce ...
Voir le projet

 18

 TERMINÉ 
The environmental, societal, and economic drivers of an efficient urban transport system are well acknowledged and are reflected in the local transport plans of all major urban areas. The overall concept of the project is to facilitate the achievement of this goal by generating solutions to currently identified barriers that form the project imperatives, which have been established through close c ...
Voir le projet

 16

 TERMINÉ 
"The purpose of SKILLRAIL is to contribute to the enhancement of the transport sector by fostering a better match between the human resources needs to make railways a more competitive and innovative sector and the offer of skills coming out of the different research based education and training institutions across Europe.Rail transport in Europe is a future-oriented industry and is striving to off ...
Voir le projet

 10