Rechercher des projets européens

14 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Graphene-based disruptive technologies (GrapheneCore1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Voir le projet

 158

 TERMINÉ 
5G will realise a true Internet of Things, a network capable of supporting potentially trillions of wireless connected devices and with overall bandwidth one thousand times higher that today’s wireless networks. Current 4G technology is approaching the limits of what is possible with this generation of radio technology and to address this, one of the key requirements of 5G will be to create a netw ...
Voir le projet

 11

 TERMINÉ 

Superfluidity: a super-fluid, cloud-native, converged edge system (SUPERFLUIDITY)

Date du début: 1 juil. 2015, Date de fin: 31 déc. 2017,

Superfluidity is “a state in which matter behaves like a fluid with zero viscosity”. Our project aims at achieving superfluidity in the network: the ability to instantiate services on-the-fly, run them anywhere in the network (core, aggregation, edge) and shift them transparently to different locations.The SUPERFLUIDITY project tackles crucial shortcomings in today’s networks: long provisioning ti ...
Voir le projet

 18

 TERMINÉ 

Service Programing and Orchestration for Virtualized Software Networks (SONATA)

Date du début: 1 juil. 2015, Date de fin: 31 déc. 2017,

Virtualisation and software networks are a major disruptive technology for communications networks, enabling services to be deployed as software functions running directly in the network on commodity hardware. However, deploying the more complex user-facing applications and services envisioned for 5G networks presents significant technological challenges for development and deployment. SONATA addr ...
Voir le projet

 17

 TERMINÉ 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Voir le projet

 154

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Voir le projet

 92

 TERMINÉ 
Description Enhanced discovery, analysis, retrieval of newsworthy and high-quality content in social media sources to assist news, event professionals to improve the experience of news readers and event goers.SocialSensor offers technologies for analyzing the activity in social networks with the goal of discovering trending and high-quali ...
Voir le projet

 12

 TERMINÉ 

Total Airport Security System (TASS)

Date du début: 1 avr. 2010, Date de fin: 31 mars 2014,

"TASS is a multi-segment, multi-level intelligence and surveillance system, aimed at creating an entire airport security monitoring solution providing real-time accurate situational awareness to airport authorities.The TASS concept is based on integrating different types of selected real time sensors & sub-systems for data collection in a variety of modes, including fixed and mobile, all suitable ...
Voir le projet

 22

 TERMINÉ 

Emergency Support System (ESS)

Date du début: 1 juin 2009, Date de fin: 31 mai 2013,

"The Emergency Support System (ESS) is a suite of real-time data-centric technologies which will provide actionable information to crisis managers during abnormal events. This information will enable improved control and management, resulting in real time synchronization between forces on the ground (police, rescue, firefighters) and out-of-theater command and control centers (C&C). The approach g ...
Voir le projet

 21

 TERMINÉ 

Economics and Technologies for Inter-Carrier Services (ETICS)

Date du début: 1 janv. 2010, Date de fin: 31 mars 2013,

ETICS aims at creating a new ecosystem of innovative QoS-enabled interconnection models between Network Service Providers allowing for a fair distribution of revenue shares among all the actors of the service delivery value-chain. To this end, we will propose and analyze new business and regulatory models for converged infrastructures, taking into account applications' QoS constraints and incentiv ...
Voir le projet

 18

 TERMINÉ 

SAIL: Scalable & Adaptive Internet soLutions (SAIL)

Date du début: 1 août 2010, Date de fin: 28 févr. 2013,

SAIL's objective is the research and development of novel networking technologies using proof-of-concept prototypes to lead the way from current networks to the Network of the Future.SAIL leverages state of the art architectures and technologies, extends them as needed, and integrates them using experimentally-driven research, producing interoperable prototypes to demonstrate utility for a set of ...
Voir le projet

 26

 TERMINÉ 

Anticipating the Network of the Future - From Theory to Design (Euro-NF)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2012,

Future networks became a central topic with a large debate whether moving towards the new networked society will be evolutionary or disruptive. In the future networked society the physical and the digital worlds will merge based on the massive usage of wireless sensor networks. Objects will be able to identify and locate themselves and to communicate through radio interfaces. Self-organized edge n ...
Voir le projet

 37

 TERMINÉ 

NESSI Open Framework - Reference Architecture (NEXOF-RA)

Date du début: 1 mars 2008, Date de fin: 31 juil. 2010,

Description NEXOF-RA aims to build the Reference Architecture for the NESSI Open Service Framework (NEXOF) by leveraging research in the area of service-based systems.The primary objective of NEXOF-RA is to build the Reference Architecture for the NESSI Open Service Framework (NEXOF) by leveraging research in the area of service-based sys ...
Voir le projet

 20

 TERMINÉ 

4WARD - Architecture and Design for the Future Internet (4WARD)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2010,

Today's network architectures are stifling innovation, restricting it mostly to the application level while the need for structural change is increasingly evident. The absence of adequate facilities to design, optimize and interoperate new networks currently forces a convergence to an architecture that is suboptimal for many applications and that cannot support innovations within itself, the Inter ...
Voir le projet

 39