Rechercher des projets européens

15 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Increased Runway and Airport Throughput (PJ02 EARTH)

Date du début: 1 déc. 2016, Date de fin: 31 déc. 2019,

EUROCONTROL’s 2013 Challenges of Growth Report “by 2035 more than 20 airports are operating at 80% or more of capacity for 6 or more hours per day … drives ATFCM airport delay up from around 1 minute/flight in 2012 to 5-6 minutes in 2035.”Whereas social, economic and environmental constraints impede building new runways, secondary airports are hindered by technical, infrastructure and meteorologic ...
Voir le projet

 35

 TERMINÉ 

Integrated Surface Management (PJ03a SUMO)

Date du début: 1 déc. 2016, Date de fin: 31 déc. 2019,

The project PJ.03a is part of the SESAR 2020 Multi Annual Program for the period 2016-2019. It is allocated to the Industrial Research & Validation phase, developed under the SJU Private Public Partnership and will contribute to the key feature High Performing Airport Operations. The future European ATM system relies on full integration of airports as nodes into the network. In this context, PJ.03 ...
Voir le projet

 37

 TERMINÉ 

Total Airport Management (PJ04 TAM)

Date du début: 1 déc. 2016, Date de fin: 31 déc. 2019,

"Why ? : Airport Operations Management in SESAR1 promoted enhanced situational awareness via the Airport Operations Plan (AOP) whilst reinforcing the collaborative decision making process through the Airport Operations Centre (APOC). Validation activities stressed the need to further develop the Performance Monitoring and Management services promoting the evolution from a reactive (“firefighting” ...
Voir le projet

 30

 TERMINÉ 

Initial Trajectory Information Sharing (PJ31 DIGITS)

Date du début: 1 sept. 2016, Date de fin: 31 déc. 2019,

"DIGITS will contribute to reinforce the “Enabling Aviation infrastructure” key feature of SESAR 2020 by demonstrating the ATM benefits that can be realized through the use of downlinked 4D trajectory data in ground systems.The project proposes, in a close to operational environment and in fully representative operational conditions, a set of tightly coordinated development and demonstration actio ...
Voir le projet

 18

 TERMINÉ 

Controller Working Position / Human Machine Interface - CWP/HMI (PJ16 CWP HMI)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

PJ.16 project aims to reduce development and operating costs of Air Navigation Service Providers (ANSP). These savings will ultimately benefit airlines and their customers. It achieves this by delivering the ATM Master Plan goals (defined by the European Air Traffic Management (ATM) community) for a more efficient deployment of human resources, a progressive increase in automation support, the im ...
Voir le projet

 28

 TERMINÉ 
Single European Sky – the vision is clearly described in the ATM Masterplan. Reaching the goals for the European Airspace is only possible with focused technical developments on European level.The air traffic controller is the main player in the traffic management at tactical level. This project aims at providing the air traffic controller with more automated tools, thus freeing capacity for situa ...
Voir le projet

 30

 TERMINÉ 

Content Integration (PJ19 CI)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

SESAR 2020 Programme aims to modernise and harmonise the European ATM System from operational and technological perspective. It will develop and validate different ATM solutions that will contribute to achieving its high level performance objectives. In this complex context, it is crucial to have a transversal activity that generates a consolidated big picture of the future European ATM System – t ...
Voir le projet

 28

 TERMINÉ 

SWIM Technical Infrastructure (PJ17 SWIM-TI)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

Single European Sky – the vision is clearly described in the European ATM Master Plan. Reaching the goals for the European Airspace is only possible with focused and extensive technical developments on European level. One of the major challenges is making sure every actor in ATM has the right information at the right time and in a consistent manner, as ATM information is the key to many concepts d ...
Voir le projet

 29

 TERMINÉ 
The PJ 14 CNS aims to specify and develop the future Technologies coming from the Communication, Navigation and Surveillance domains in order to support and manage the Operational Services, like the 4D Trajectory Management, in the future ATM System.Performance requirements for CNS systems are becoming increasingly complex and demanding and need to be considered as part of an integrated and holist ...
Voir le projet

 30

 TERMINÉ 

Enhanced Air and Ground Safety Nets (PJ11 CAPITO)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

Safety is at the core of ATC. However, safety is interrelated with efficiency. Air and Ground Safety Nets have been developed to increase the achieved level of safety. Necessarily, Ground and Air Safety Nets have to evolve to keep up with the challenges originating from ever increasing traffic density and complexity.ATM evolutions necessary to safely handle increasing traffic demand or to improve ...
Voir le projet

 14

 TERMINÉ 

Integrated Airport Operations (PJ28 IAO)

Date du début: 1 déc. 2016, Date de fin: 30 nov. 2019,

"This project PJ28 which is part of the SESAR 2020 Multi annual Program (S2020 MAWP) for the period 2016-2019, will demonstrate the benefits that specific promising SESAR solutions will bring in a large and two mid-size airports, where traffic congestion daily takes place during the peak season and where new SESAR solutions are expected to assist controllers in their duty. PJ28 proposal addresses ...
Voir le projet

 15

 TERMINÉ 

Remote Tower for Multiple Airports (PJ05 Remote Tower)

Date du début: 1 nov. 2016, Date de fin: 30 nov. 2019,

"Cost-effectiveness, clearly described in the topic SESAR.IR-VLD.Wave1-08-2015 as the main key performance area (KPA), is the principal KPA addressed by “PJ05 Remote Tower” project. It proposes the development of a remotely provided aerodrome air traffic service by a "multiple" and/or "center" setting. Those settings help to combine ATS services from various aerodromes in a centralized control roo ...
Voir le projet

 31

 TERMINÉ 

Advanced Airspace Management (PJ08 AAM)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2019,

According to EUROCONTROL’s 2013 Challenges of Growth Report, Air traffic in the ECAC region is forecast to increase by 50% between 2012-2035 (most-likely scenario).Air traffic diversity is expected to become even more complex with the emergence of Remotely Piloted aircraft Systems (RPAS) and the multi-task nature of military aerial missions. The extension of free route operations will also imply m ...
Voir le projet

 20

 TERMINÉ 

Advanced DCB (PJ09 DCB)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2019,

The S2020 project “PJ09 Advanced DCB” evolves the existing DCB process to a powerful distributed network management function which takes full advantage from the SESAR Layered Collaborative Planning, Trajectory Management principles and SWIM Technology to improve the effectiveness of ATM resource planning and the network performance of the ATM system in Europe. Solution 1 develops shared situation ...
Voir le projet

 30

 TERMINÉ 
"Air traffic in Europe is expected to double by 2025 according to the last forecast of Eurocontrol. Future passenger and freight fleets will bring better efficiency and improved environmental performance, and will allow people to benefit from the connections that only air transport can deliver. In this context, an integrated aircraft communication system is of paramount importance to improve effic ...
Voir le projet

 34