Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Reliability and radiation damage issues have a long and important history in the domain of satellites and space missions. Qualification standards were established and expertise was built up in space agencies (ESA), supporting institutes and organizations (CNES, DLR, etc.) as well as universities and specialized companies. During recent years, radiation concerns are gaining attention also in aviati ...
Voir le projet

 9

 TERMINÉ 

Energy for Smart Objects (EnSO)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

The goal of EnSO is to develop and consolidate a unique European ecosystem in the field of autonomous micro energy sources (AMES) supporting Electronic European industry to develop innovative products, in particular in IoT markets. In summary, EnSO multi-KET objectives are:• Objective 1: demonstrate the competitiveness of EnSO energy solutions of the targeted Smart Society, Smart Health, and Smart ...
Voir le projet

 36

 TERMINÉ 

HUman MANufacturing (HUMAN)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

... conceptual, methodological, technological, and knowledge-based tools. 3 use case companies from the Furniture Manufacturing (ROYO Group), Automation Manufacturing (COMAU), & Defence & Aerospace (AIRBUS) sectors are involved. Proposed advances offered by HUMAN solutions will remove the barriers for:adaptability and flexibility of humans to continuously changing workplaces;alignment of new and comp ...
Voir le projet

 12

 TERMINÉ 
SARAH is concerned with establishing novel holistic, simulation-based approaches to the analysis of aircraft ditching. It is build up from a consortium of experts from OEM industries, experienced suppliers of simulation technologies, established research institutions and representatives of the certification authorities. Results of SARAH are expected to support a performance-based regulation and ce ...
Voir le projet

 12

 TERMINÉ 

Zero-defect manufacturing of composite parts in the aerospace industry (ZAero)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

...m 2025, savings of 150 MEUR in production costs can be obtained per year.The consortium consists of all key players that will play a future role in the manufacturing of such large carbon fibre parts. Airbus with its research centers Airbus Group Innovations and FIDAMC will play a leading role in the consortium as far as the multi-stage manufacturing process is concerned. Machine builders (MTorres, ...
Voir le projet

 7

 TERMINÉ 
Today, industrial markets demand highly added value products offering new features at a low-cost. To this extent, technologies to modify surfaces instead of creating composites or applying coatings on surfaces can offer new industrial opportunities. Current state of the art identifies short pulsed(SP)/ultra-short pulsed(USP) laser-material processing as a promising technology for structuring surfa ...
Voir le projet

 10

 TERMINÉ 

Rf Engineered substrates to FostER fEm performaNCE (REFERENCE)

Date du début: 1 déc. 2015, Date de fin: 31 mai 2019,

The REFERENCE project aims to leverage a European leading edge Radio Frequency (RF) ecosystem based on RF Silicon On Insulator (SOI) disruptive technology, perceived as the most promising to address performance, cost and integration needs for RF Front End Modules (FEMs)s.The project targets to develop over the next 3 years, innovative solutions from material, engineered substrates, process, design ...
Voir le projet

 18

 TERMINÉ 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Voir le projet

 76

 TERMINÉ 
The proposed project, IMAGE, is relevant to Topic MG-1.10-2015, aiming to enhance the EU-China collaborative effort focusing on “Innovative methods and numerical technologies for airframe and engine noise reduction”. The project consortium consists of 12 partners.The purpose of IMAGE is to investigate experimentally and numerically innovative airframe and engine noise-reduction technologies and, i ...
Voir le projet

 13

 TERMINÉ 

European Space Robot Control Operating System (ESROCOS)

Date du début: 1 nov. 2016, Date de fin: 31 janv. 2019,

The ESROCOS activity is devoted to the design of a Robot Control Operating Software (RCOS) that can provide adequate features and performance with space-grade Reliability, Availability, Maintainability and Safety (RAMS) properties. The goal of the ESROCOS proposal is to provide an open source framework which can assist in the generation of flight software for space robots. By providing an open sta ...
Voir le projet

 10

 TERMINÉ 

Facilities for testing orbital and surface robotics building blocks (FACILITATORS)

Date du début: 1 nov. 2016, Date de fin: 31 janv. 2019,

The FACILITATORS goals are:-To Enable the highest possible level of validation of the common building blocks (developed by concurring operational grants) in the most relevant environment by adapting and providing the best available European test facilities, as well as -To Guarantee coherence among the different test facilities and among the building blocks by establishing common implementation/val ...
Voir le projet

 4

 TERMINÉ 

EUROPEAN ROBOTIC GOAL-ORIENTED AUTONOMOUS CONTROLLER (ERGO)

Date du début: 1 nov. 2016, Date de fin: 31 janv. 2019,

European Robotic goal-oriented autonomous COntroller (ERGO)The specific objective of ERGO is thaen to deliver the most advanced but flexible space autonomous framework/system suitable for single and/or collaborative space robotic means/missions (orbital and surface rovers) demanding robust operations with adaptable levels of autonomy.Due to the intrinsic similarities of addressed scenarios, especi ...
Voir le projet

 8

 TERMINÉ 

FUture Cabin for the Asian Market (FUCAM)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2019,

In many respects, the evolution of the Japanese airline passenger represents an anticipation of the societal trends for the world's future airline passenger (ageing and being connected from point to point for instance). If the design of the future human-centered passenger cabin is able to satisfy the highly demanding expectations from the Japanese customer (in terms of safety, perceived quality, c ...
Voir le projet

 6

 TERMINÉ 

Validation of European high capacity rad-hard FPGA and software tools (VEGAS)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

VEGAS proposes to address the key challenge of European non-dependence and competitivness regarding rad-hard FPGA for space applications. VEGAS will evaluate (following ESCC rules) and validate the first rad-hard FPGA in 65nm to directly compete with the US offering and reach TRL 7. The VEGAS project sets clear and measurable main objectives to reach a TRL 7 from TRL 5 (end of BRAVE project) as fo ...
Voir le projet

 11

 TERMINÉ 

Future Sky Safety

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2018,

The EC Flight Path 2050 vision aims to achieve the highest levels of safety to ensure that passengers and freight as well as the air transport system and its infrastructure are protected. However, trends in safety performance over the last decade indicate that the ACARE Vision 2020 safety goal of an 80% reduction of the accident rate is not being achieved. A stronger focus on safety is required. T ...
Voir le projet

 32

 TERMINÉ 

Towards a EU framework for the security of Widezones (ZONESEC)

Date du début: 1 déc. 2014, Date de fin: 30 nov. 2018,

The advancement of 24/7 surveillance systems for the security of WideZones with multiple assets at localized scales is of extreme strategic relevance to European economies, industries, authorities and Citizens. Nevertheless, the cost for large deployments and maintenance of ground sensing networks for local surveillance across these WideZones is extremely high. Hence, large areas of high economic ...
Voir le projet

 19

 TERMINÉ 

Towards Demonstration of Photonic Payload For Telecom Satellites (OPTIMA)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2018,

...bre based equipment.However, great efforts are required to bring these benefits to the world of telecoms payloads as all the photonics equipment used on ground need to be adapted for space.In OPTIMA, Airbus Defence and Space (UK, FR), a world-leading satellite prime manufacturer, will define, assemble and a test photonic payload demonstrator based on building blocks developed, adapted for space an ...
Voir le projet

 9

 TERMINÉ 
AGILE targets multidisciplinary optimization using distributed analysis frameworks. The involvement of many disciplinary analyses ranging up to high levels of fidelity and agile workflow management are considered to be state-of-the-art and starting point for AGILE. Advanced optimization techniques and strategies will be developed in order to exploit available computing systems and to gain faster c ...
Voir le projet

 20

 TERMINÉ 
AFLoNext is a four year EC L2 project with the objective of proving and maturing highly promising flow control technologies for novel aircraft configurations to achieve a quantum leap in improving aircraft’s performance and thus reducing the environmental footprint. The project consortium is composed by forty European partners from fifteen countries. The work has been broken down into seven work p ...
Voir le projet

 41

 TERMINÉ 

Aeroelastic Gust Modelling (AEROGUST)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

Encounters with atmospheric turbulence are a vitally important in the design and certification of many manmade structures such as aircraft and wind turbines. Gusts cause rapid changes in the flow about the structures which leads to rigid and flexible unsteady responses. Knowledge of aircraft/gust interactions is therefore vital for loads estimation during aircraft design as it impacts on control s ...
Voir le projet

 13

 TERMINÉ 
The integration of innovative lightweight materials like CFRP into multi-material design (MMD) environments in aeronautic applications brings along a paradigm shift in initial design, manufacturing and in maintenance, repair and overhaul (MRO). Essential cost reductions over the whole aircraft lifecycle demand innovative processes meeting the specific requirements of MMD in general and specificall ...
Voir le projet

 14

 TERMINÉ 
More and more industrial sectors are demanding high performance composite materials to face new challenges demanded by the transport sector. Carbon and glass fibre unidirectional continuous tape reinforced composites are one of the most promising options. It would be reasonable to expect that the manufacturing methods to obtain composite parts made of this hybrid material will be capable to tailor ...
Voir le projet

 11

 TERMINÉ 

THINGS2DO (THINGS2D0)

Date du début: 1 janv. 2014, Date de fin: 1 janv. 2018,

Develop the FDSOI ecosystem in Europe, beyond the PLACES2BE Pilot Line, in order to increase the impact of this European technology. At the time of set up of the first KET pilot line the proof of FDSOI was mainly technological. In between then and now, the first realization of a complex silicon chip in FDSOI has shown to the worldwide microelectronics community the capabilities of this technology. ...
Voir le projet

 44

 TERMINÉ 

European Consortium for Lithium-Sulfur Power for Space Environments (ECLIPSE)

Date du début: 1 déc. 2015, Date de fin: 30 nov. 2017,

...cheaper), non-dependency and innovation: beyond current markets, this breakthrough can enable new challenging missions.The impact of the project is secured by the composition of the consortium led by Airbus Defence and Space with the main European actors of the Lithium-Sulfur electrochemistry and space batteries: ECLIPSE will contribute to the consolidation of an independent European industrial su ...
Voir le projet

 12

 TERMINÉ 

A Low Cost Active Debris Removal Demonstration Mission (REMOVEDEBRIS)

Date du début: 11 nov. 2013, Date de fin: 11 nov. 2017,

A huge amount of debris has progressively been generated since the beginning of the space era. Most of the objects launched into space are still orbiting the Earth and today these object and their by-products represent a threat both in space and on Earth. In Space, debris lead to collisions and therefore to damages to operational satellites. For both issues, a credible solution has emerged over th ...
Voir le projet

 11

 TERMINÉ 
The QB50 Project will demonstrate the possibility of launching a network of 50 CubeSats built by CubeSat teams from all over the world to perform first-class science and in-orbit demonstration in the largely unexplored middle and lower thermosphere. Space agencies are currently not pursuing a multi-spacecraft network for in-situ measurements in the middle and lower thermosphere because the cost of ...
Voir le projet

 17

 TERMINÉ 

Science and Technology for Near-Earth Object Impact Prevention (NEOShield-2)

Date du début: 1 mars 2015, Date de fin: 30 sept. 2017,

Impacts of near-Earth objects (NEOs) have contributed to mass extinctions and evolution, and it is a proven fact that NEOs will continue to hit the Earth at irregular intervals in the future, with the potential for catastrophic damage to life and property. With the experience and results gained from the NEOShield project we are now very well equipped to address all aspects of this call, including ...
Voir le projet

 12

 TERMINÉ 
In search for a more competitive, multiple types of aircrafts, IMA based, avionics platform solution, the European aerospace industry has recently initiated the IMA2G paradigm thanks to the EC funded SCARLETT project.This latter successfully validated a first underlying set of IMA2G concepts (Separate Core Processing resources from I/O resources, introduce resource segments typology of electronics ...
Voir le projet

 39

 TERMINÉ 

Global ATM security management (GAMMA)

Date du début: 1 sept. 2013, Date de fin: 31 août 2017,

The GAMMA project stems from the recognition that while the SESAR initiative is effectively addressing some security issues in the new global ATM scenarios, there is a need to extend this scope to ensure a comprehensive assessment of the full set of security threats and vulnerabilities affecting ATM, considered as a system of systems and covering operational as well as technological aspects. In ad ...
Voir le projet

 23

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 

European Control System Security Incident Analysis Network (ECOSSIAN)

Date du début: 1 juin 2014, Date de fin: 31 mai 2017,

The protection of critical infrastructures increasingly demands solutions which support incident detection and management at the levels of individual CI, across CIs which are depending on each other, and across borders. An approach is required which really integrates functionalities across all these levels. Cooperation of privately operated CIs and public bodies (governments and EU) is difficult b ...
Voir le projet

 22

 TERMINÉ 
"In a disaster situation three things contribute to a success: having the right resource available in the shortest time, with the highest relevance and at the right location.Access to necessary information, communication with other rescuers and stakeholders as well as the availability of resources are key factors in minimizing damage and loss of life.Large scale disasters and crisis situations inc ...
Voir le projet

 13

 TERMINÉ 

Advanced Forest Fire Fighting (AF3)

Date du début: 1 mai 2014, Date de fin: 30 avr. 2017,

In recent years, the frequency of large-scale forest fires has increased significantly owing to a number of factors including the effects of climate change, urbanisation, poor landscape management and malevolent acts. These so-called “Mega-fires” are particularly destructive and difficult to control with the technologies and systems currently available to fire fighters and emergency agencies. The ...
Voir le projet

 20

 TERMINÉ 

High Altitude Ice Crystals (HAIC)

Date du début: 1 août 2012, Date de fin: 31 janv. 2017,

Commercial aircraft have been experiencing in-service events while flying in the vicinity of deep convective clouds since at least the early 1990s. Heated probes and engines are the areas of air-craft most prone to mixed phase and glaciated icing threat. In anticipation of regulation changes regarding mixed phase and glaciated icing conditions, the HAIC project will provide the necessary Acceptabl ...
Voir le projet

 40

 TERMINÉ 

Process Line Implementation for Applied Surface Nanotechnologies (PLIANT)

Date du début: 1 févr. 2013, Date de fin: 31 janv. 2017,

In this proposed integrating project we will develop innovative in-line high throughput manufacturing technologies which are all based on atmospheric pressure (AP) vapour phase surface and on AP plasma processing technologies. Both approaches have significant potential for the precise synthesis of nano-structures with tailored properties, but their effective simultaneous combination is particularl ...
Voir le projet

 24

 TERMINÉ 
...udy the portability to European latest and highest performance hardened semiconductor technology (STM65nm)This is achieved by the collaboration of the most experienced companies in this field, namely Airbus Defence and Space (G, F) for specific heritage on high reliable and radiation hardened systems, ARM (UK) providing its excellence in processor core IPs and know-how in this field of development ...
Voir le projet

 6

 TERMINÉ 

Inter System Interoperability for Tetra-TetraPol Networks (ISITEP)

Date du début: 1 sept. 2013, Date de fin: 31 déc. 2016,

A European network where forces share communications, processes and a legal framework would greatly enforce response to disaster recovery and security against crime. Until now, uncertainty on costs, timescale and functionalities has slowed down integration of national Public Protection & Disaster Relief (PPDR) networks. The lack of interoperable communication systems has impeded the cooperation of ...
Voir le projet

 19

 TERMINÉ 

End-user driven DEmo for cbrNe (EDEN)

Date du début: 1 sept. 2013, Date de fin: 31 déc. 2016,

The accidental or deliberate release of CBRNE materials are low probability events that can have a significant impact on citizens and society. Whenever and wherever they occur, they usually require a gradual and multi-facetted response as they tend to provoke severe and unexpected physical, psychological, societal, economical and political effects that cross EU-borders. Successful CBRNE resilience ...
Voir le projet

 47

 TERMINÉ 

Cold Spray Radical Solutions for Aeronautic Improved Repairs (CORSAIR) (CORSAIR)

Date du début: 1 juin 2013, Date de fin: 30 nov. 2016,

CORSAIR project is a wide investigation concerning the capabilities of Cold Spray Technology for maintenance and repair of aeronautic frames and components. Today, deep and systematic investigation in Cold Spray is required to better understand the capabilities and fully validate the technology in aeronautics. In this scenario, the activities planned in CORSAIR project are (1) Explore the real cap ...
Voir le projet

 13

 TERMINÉ 

Initiative Towards sustAinable Kerosene for Aviation (ITAKA)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2016,

ITAKA project is expected to support the development of aviation biofuels in an economically, socially, and environmentally sustainable manner, improving the readiness of existing technology and infrastructures. This will be achieved through the first of its kind collaborative project in the EU, that will develop a full value-chain in Europe to produce sustainable drop-in Hydroprocessed Esters and ...
Voir le projet

 16