Energy-intensive industries are major users of fresh water, for e.g. processing, washing, diluting, heating, cooling, and transporting products. Since fresh water is a scare resource, breakthrough innovations are needed in energy-intensive industries to recycle water and create closed loops in industrial processes. Such closed loops would significantly reduce the use of fresh water and improve water availability in the relevant EU water catchment areas, as outlined in the Water Framework Directive, for other purposes (adjacent communities, farming and bio-based industries). Industrial symbiosis offers the potential for energy, water and other resource efficiency at a scale beyond energy intensive industries.
Scope:
Proposals should aim at near-zero discharge using closed-loop systems in combination with recovery of energy and/or substances (resources) through the development of integrated water-smart strategies for industrial processes.
Strategies should take into account:
Reprograming of water resources and optimisation of water management in industrial processes should apply the principles of waste - water - energy design in a circular context.
Proposals should develop new technologies and approaches at a large scale. It is anticipated to combine:
Integrated Water Management should consider different qualities and sources of water, including desalination, re-use of treated wastewater, rainwater harvesting and gas humidity condensation (e.g., cooling tower blowdown). Development of `tailor-made' system solutions with demand orientation and scale-up testing to robust industrial processes will be required. Water re-use will subsequently lead to accumulation of pollutants. In-line monitoring should include these water quality control parameters linked to the process.
Clustering and cooperation with other selected projects under this cross-cutting call, and with other relevant projects, in particular those selected under SC5-04-2019 “Building a water-smart economy and society”, is strongly encouraged.
Proposals submitted under this topic should include a business case and exploitation strategy, as outlined in the Introduction of this part of the Work Programme.
Activities should start at TRL 5 and achieve TRL 7 at the end of the project.
The Commission considers that proposals requesting a contribution from the EU between EUR 8 and 12 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.
Expected Impact:
Several of the following impacts are expected: